RFP_No._FA5205-14-R-0010.pdf
PDF 478 KB Posted
- Attached to
- Airfield/Pavements IDIQ Contract Federal contract opportunity
- Solicitation number
- FA5205-14-R-0010
About this file
RFP No. FA5205-14-R-0010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_0002_to_RFP_No._FA5205-14-R-0010.pdf | ||
| Identifiable_Offeror_Name _14R0010-0002_Exhibit_A-C.xls | XLS spreadsheet | |
| Amend_0001_to_RFP_No.FA5205-14-R-0010.pdf | ||
| Response_to_Question_RFP_No._FA5205-14-R-0010.pdf | ||
| Pre-proposal_Conf_Minutes_FA5205-14-R-0010.pdf | ||
| Atch_3_Submittal_Register.pdf | ||
| Atch_2_Dwgs.pdf | ||
| Atch_4_List_of_CFUSM.pdf | ||
| Atch_5_Historical_Data.pdf | ||
| Atch_1_Specs.pdf | ||
| Identifiable_Offeror_Name _14R0010_Exhibit_A-C.xls | XLS spreadsheet |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
See schedule.
Additional Information to Offerors:
1. Description of Work/Estimated Cost: This is Airf ield/Pavements IDIQ Contract, Misaw a Air Base, Japan. Refer to Sec. B for “Project
Description”, Sec. L, para. L-123H for “Disclosure of the Magnitude of Construction Projects”, and Atch. 5 for "Historical Data".
2. Preproposal conference/job site visit w ill be held on 8 Aug 14 at 1030 hours in the 35th Contracting Squadron conference room. See
AFFARS 5352.215-9001, “Notice of Pre-Bid/Pre-Proposal Conference”, and FAR 52.236-27, “Site Visit (Construction) – Alternate I”, for more detail information.
3. Performance bond: Refer to Sec. H, para. H-902, “Performance Bond”, and Sec. I, FAR 52.228-15 “Performance and Payment Bonds – Construction”.
This acquisition is unrestricted; no small business set aside.
KAZUHIRO NAKAMURA DSN:226-3496 / COM:(81)0176-77
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
31-Jul-2014
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________09 Sep 2014 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
35 CONS/LGC (JAPAN)
DODAAC: FA5205
BLDG. 656, MISAWA AIR BASE
MISAWA-SHI, AOMORI-KEN 033-0012
FA5205
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
FA5205-14-R-0010 4948
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FA5205-14-R-0010
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Lot Airfield/Pavements, Basic Yr
FFP
Basic Year (one year from the date of contract award, see para. F-901(a)).
Provide all work in accordance with the plans and specifications provided under this Airfield/Pavements IDIQ contract and the scope of work called for by individual task order(s) when such task order(s) is/are issued. The total amount of individual task order must be calculated by adding extended amounts of each sub line items included in the individual task order. Exhibit Line Items (hereinafter called "ELIN" or "ELINs") to be used under this Contract Line Item (CLIN) are as listed in Exhibit A of Section J. See "Project Description" herein for the details of
IDIQ contract intended.
FOB: Destination
SIGNAL CODE: A
NET AMT
See Exhibit A
1001 Lot OPTION Airfield/Pavements, Option Yr 1
FFP
Option Year One (for a period of one year subsequent to Basic Year completion, see para. F-901(a)).
Provide all work in accordance with the plans and specifications provided under this Airfield/Pavements IDIQ contract and the scope of work called for by individual task order(s) when such task order(s) is/are issued. The total amount of individual task order must be calculated by adding extended amounts of each sub line items included in the individual task order. ELINs to be used under this CLIN are as listed in Exhibit B of Section J. See "Project Description" herein for the details of IDIQ contract intended.
See Exhibit B
2001 Lot OPTION Airfield/Pavements, Option Yr 2
FFP
Option Year Two (for a period of one year subsequent to Option Year One completion, see para. F-901(a)).
Provide all work in accordance with the plans and specifications provided under this Airfield/Pavements IDIQ contract and the scope of work called for by individual task order(s) when such task order(s) is/are issued. The total amount of individual task order must be calculated by adding extended amounts of each sub line items included in the individual task order. ELINs to be used under this CLIN are as listed in Exhibit C of Section J. See "Project Description" herein for the details of IDIQ contract intended.
See Exhibit C
Aggregate Estimated Amount of Base Year, Option Year One, and Option Year Two: ¥
PROJECT DESCRIPTION
1. This is a Fixed-Price (FP), Indefinite-Delivery/Indefinite-Quantity (IDIQ) type Single Award contract wherein work will be accomplished through issuance of task order(s) on DD Form 1155 (DD1155) for which the contractor shall provide supervision, labor, equipment, and materials necessary to complete the work required, all in accordance with the specifications and drawings provided under this Airfield/Pavements IDIQ Contract, Misawa Air Base
(MAB), Japan and the scope of work called for by individual task order. The scope of this contract will encompass repair, maintenance, and/or construction of airfield pavement, roads, parking lots, and their associated incidental item(s), such as, but not limited to, survey, saw cutting. joint sealing, asphalt concrete overlay, pavement of cement concrete, removal of rubber deposits, paint markings, drain/manhole work, water supply piping, erosion control, tree planting, and/or electrical work on the airfield of MAB. The contract will be effective for one-year base period, with two one-year options that may be exercised at the discretion of the Government, with a guaranteed minimum amount of *$5,000.00 for the entire life of the contract. Quantities of each ELINs listed in Exhibit A thru C are the
Government’s estimated quantity per year (estimate only), not a maximum limit of the contract. The maximum limit of the contract is *$38,000,000.00 for the entire life of the contract. Within this maximum limit, the Government reserves the right to increase the estimated quantities of respective contract year, as necessary. However, the contractor is reminded that the Government will not be committed to place task order(s) up to the maximum limit of the contract during the life of the contract.
2. Minor Construction (MC) work is subject to Statutory Cost Limitation (SCL) of *$750,000.00 IAW Section L, DFARS 252.236-7006, Cost Limitation. Amount of MC work, if included in the task order, shall not exceed the said
SCL.
(*Note. If the dollar amount is preceded by an asterisk "*", it indicates that "or equivalent Yen amount converted by use of respective fiscal years' Foreign Currency Fluctuation Defense (FCFD) budget rate for Japanese Yen". Under this solicitation, FY14 FCFD budget rate of ¥103.9439 to $1.00 is applicable for a period of 1 May 14 thru 30 Sep
14. Under the resultant contract, a formal FCFD budget rate will be announced to the contractor in the beginning of respective fiscal year.)
NOTE TO OFFERORS
1. For the purpose of construction effort in Japan, the offeror must fulfill the following conditions: 1) the offeror has been duly authorized to operate and to do business in the host nation country where the contract is to be performed and 2) the resultant contractor shall be responsible for obtaining any necessary licenses and permits, and for complying with any host government and political subdivisions laws, codes, and regulations applicable IAW FAR
52.236-7 Permits and Responsibilities (modified IAW AFFARS 5336.507).
2. Filling Proposal Prices
a. Amount of CLINs 0001, 1001, and 2001 in Section B shall be in agreement with the total amount of Exhibit A, B, and C of Section J, respectively. Together with the written proposal, offerors shall submit an electronic file of
MS Excel spreadsheet for completed Exhibit A thru C. Use the following format when assigning the file name:
(Identifiable Offeror’s Name)_14R0010_ExhibitA-C.xls Prices should be indicated in Japanese Yen.
b. Each unit price to fill in ELINs in the Exhibit A thru C must include its proportionate share of overhead and profit. All extended prices of the unit prices shown are subject to verification by the Government. In case of variation between the unit price and the extended amount, the unit price will be considered to be the offer unless correction of apparent calculation error is permitted in writing by the Contracting Officer.
B-1. CLAUSES AND PROVISIONS
(a) Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
(b) Clauses and provisions in this document will be numbered in sequence, but will not necessarily appear in consecutive order.
(c) Section K, L and M will be physically removed from any resultant award, but will be deemed to be incorporated, by reference, in that award.
Section C - Descriptions and Specifications
CLAUSES INCORPORATED BY FULL TEXT
C-1 SPECIFICATIONS, STANDARDS AND DRAWINGS
(IAW FAR 11.201)
The contractor shall furnish the services and supplies set forth in Section B in accordance with the specifications, drawings and attachments listed in Section J.
Section E - Inspection and Acceptance
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction AUG 1996
E-34. INSPECTION AND ACCEPTANCE
(IAW FAR 46.401(b) and 46.503)
Inspection and acceptance will be at the destination(s) specified in F-13, “Place of Performance” hereof.
Section F - Deliveries or Performance
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in individual task order, the Contractor shall pay liquidated damages to the Government in the amount of ¥32,275+¥36,241 for the first calendar day of delay and ¥32,275 for each additional calendar day of delay and thereafter (these amounts specified for liquidated damages are applicable to each task order issued under this contract) for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
F-13. PLACE OF PERFORMANCE
Services under this contract are required to be performed at the following location(s):
Airfield, Misawa Air Base, Japan
F-901. CONTRACT PERIOD/PERFORMANCE PERIOD
(a) Contract Period. Contract period will be one year from the date of contract award, with two (2) one-year options which may be exercised at the discretion of the Government. At the time of contract award, specific dates are to be indicated below:
(i) Base Year, from __________ to ___________.
(ii) Option Year One, from _________to _________.
(iii) Option Year Two, from_________ to _________.
Under this contract, the ordering period stipulated in the contract clause at FAR 52.216-18, Ordering is identical with the contract period above. During such period, the work required will be ordered to the contractor by issuing a task order IAW FAR 52.216-18.
(b) Performance Period. When a task order is issued, the performance period of the work required will be specified in the task order. For commencement of the work called for by the task order, the Government will issue a Notice to
Proceed (NTP) to the contractor within a *period specified in the task order (*30 calendar days (CD) after the award date of task order, unless a period longer than 30 CD is specified). Upon receipt of the NTP, the contractor shall commence the work called for by the task order within the period specified in the NTP and complete the work within the performance period set forth in the task order; provided that -
(i) Performance period of the task order may be adjusted contingent upon results of site survey in accordance with para. H-908(a) (also see para. H-908(c) for special requirements as to fiscal year-end task order); and
(ii) The Government may specify a specific work start-up date as well as the completion date in the task order without issuing the NTP above, if and when the work is urgently required and/or the award amount of task order is less than $150,000.00 (or equivalent Japanese Yen) with a short-period performance less than 60 CD.
F-904. LIMITATION IN EXTERIOR WORK DURING WINTER PERIOD
The period from 15 December through 15 March in the following year is defined as the winter period. Exterior work such as excavation, backfill, concrete placement, paint, etc., shall not be performed in the winter period unless otherwise approved by the Contracting Officer. Perform such exterior work during the winter period only in compliance with applicable sections of the specifications, Attachment 1 and drawings, Attachment 2, Section J under strict temperature control with curing and/or heating appliance as necessary. If the weather violates the conditions outlined in the specifications, then the contractor shall submit the exterior work request together with work and temperature control plans to the Contracting Officer for approval. The exterior work does not include on-site preparation or survey work. This limitation in exterior work during winter period is applicable to each task order issued under the contract (also see para. H-908(b) for site survey requirements).
Section G - Contract Administration Data
G-1.
(a) Accounting and appropriation data will be cited on each individual task order(s) as awarded
(b) Guaranteed minimum amount. Upon award of the contract, task order for obligation record of guaranteed minimum amount of $5,000.00/¥519,720 will be placed to the contractor. The task order for obligation record will be retained by the Government until a task order for the construction work fulfilling the guaranteed minimum amount is placed. Accounting and appropriation data for the guaranteed minimum amount is listed below (as fiscal year changes, the following data will be changed with new fiscal year's one).
5743400 304 7454 3A4421 010000 52495 22178F 668800 FB5205
G-900 GOVERNMENT PERSONNEL
The Contracting Officer will provide to the contractor, a listing of the names of the Administrative Contracting
Officer, Contract Administrator, Contracting Officer's Representative (COR), and Government Inspector(s), their organizational codes and telephone numbers at the time of award or at the pre-construction conference.
G-901. INVOICE/PAYMENT
Payment will be made by the office to be indicated in block 15 of DD Form 1155 of individual task order in accordance with FAR 52.232-5, “Payments under Fixed-Price Construction Contracts”, FAR 52.232-27, “Prompt
Payment for Construction Contracts”, and DFARS 252.232-7003, “Electronic Submission of Payment Requests and
Receiving Reports”, after receipt of the payment request by the billing office designated in block 7 of DD Form
1155.
G-902. TASK ORDER(S) ISSUING OFFICE
Task order(s) will be issued by the following office under this contract:
35th Contracting Squadron
Bldg. 656, Misawa Air Base, Misawa-shi, Aomori-ken, Japan 033-0012
G-903. SUMMARY FOR THE PAYMENT OFFICE
(To be cited when contract modification(s) are issued)
Modification No. Modification Amount Current Contract Price
Section H - Special Contract Requirements
H-900. CONCILIATION
(This clause is applicable to contracts which will be performed in Japan and or executed between the United States
Forces Japan, and a Japanese Contractor)
Except as otherwise provided in this contract any disagreement arising under this contract which is not resolved by the parties to this contract may be submitted to the United States – Japan Joint Committee for conciliation in accordance with Paragraph 10, Article XVIII, of the Status of Forces Agreement under Article VI of the Treaty of
Mutual Cooperation and Security between Japan and the United States of America. Requests by the contractor for conciliation shall be made in accordance with the following procedures:
(a) In the event the contractor desires conciliation after the decision of the Contracting Officer has been served upon him, he will first file his appeal from such findings of fact with the appropriate authority in accordance with the clause of this contract entitled DISPUTES, and within the time limits described therein before filing request for conciliation with the Joint Committee and then request the appellate authority under the clause of this contract entitled DISPUTES, to suspend its action on his appeal until such time as the Joint Committee has had an opportunity for effecting conciliation.
(b) The request for conciliation will be submitted by the contractor through the nearest local Japanese Defense
Facilities Bureau, to the Contract Conciliation panel of the Joint Committee. Upon the filing of the request with the
Joint Committee, the contractor will immediately notify the Contracting Officer in writing that the request for conciliation has been filed.
(c) In the event the disagreement submitted to the Joint Committee under subparagraph (b) above has been resolved through conciliation, it will be the responsibility of the contractor to notify the appellate authority designated in the clause of this contract entitled DISPUTES, of the settlement of the dispute and to withdraw his appeal.
(d) In the event the contractor who has submitted a request for conciliation to the Joint Committee under subparagraph (b) above desires, notwithstanding tendency of this request for conciliation, that action by the appropriate authority under the clause of this contract entitled DISPUTES, be resumed on his appeal, it is his responsibility to so request the said authority in writing. The Joint Committee shall be immediately informed by the contractor of this action taken hereunder.
(e) No request for conciliation can be submitted to the Joint Committee in the case of a dispute upon which the final decision of the appropriate authority under the clause of this contract entitled DISPUTES, has been rendered.
Pending the hearing of conciliation panel the contractor shall proceed diligently with the decision. The provisions of this clause shall not prejudice any right which the parties to the contract may have to file a civil suit.
H-901. REQUIRED INSURANCE
(This paragraph applies only when contractor’s owned vehicles are being operated on Misawa Air Base)
(a) The contractor shall procure and maintain during the entire period of his/her performance under this contract, the following minimum vehicle insurance:
Property Damage – Y2,000,000
(b) Prior to the commencement of work hereunder, the contractor shall furnish to the Contracting officer a certificate or written statement of the above required insurance. The contractor is required to notify the Contracting Officer immediately upon cancellation or of any material change in the policies adversely affecting the interests of the
Government.
(c) The contractor agrees to insert the substance of this clause including this paragraph c, in all subcontracts hereunder.
H-902. PERFORMANCE BOND
(a) This is a task order based IDIQ contract under which the contractor is required to submit an executed performance bond on the basis of individual task order payable to the contractor. The task order of guaranteed minimum obligation record purpose stated in para. G-1(b), to be retained by the Government, is excluded from the requirement of performance bond.
(b) Upon receipt of individual task order issued by the ordering activity specified in para. G-903, the contractor shall furnish an executed performance bond to the Contracting Officer as follows:
(i) For task order exceeding award amount of $150,000.00 or equivalent Japanese Yen amount as indicated in the task order;
(ii) Within 30 CD from the receipt date of task order by the contractor, unless otherwise a period longer than
30 CD is specified in the task order; and
(iii) In a penal sum of performance bond equal to100 percent of task order award amount, properly executed on
Standard Form 25.
In case that the procedural matters of the surety (non-life insurance company in the case of Japan) affecting submission of the bond stipulated above arises, the contractor shall immediately report such fact in writing to the
Contracting Officer for his/her determination.
(c) Additional performance bond shall be required when the task order award amount is increased by more than
$10,000.00 or equivalent Japanese Yen amount as indicated in the task order modification. The contractor shall furnish an executed additional performance bond to the Contracting Officer, in a penal sum equal to the increase, within the period specified in the task order modification or the Contracting Officer's letter otherwise issued.
(d) Failure by the contractor to submit the performance bond as stated in para. (a) thru (c) above may constitute actionable grounds to invoke termination action pursuant to Section I, Contract clause, FAR 52.249-10 entitled
"Default (Fixed-Price Construction)".
H-908. SITE SURVEY AND TASK ORDER(S)
(a) The contractor shall commence the airfield on-site work called for by the task order after a NTP is issued, IAW the contract clause at FAR 52.211-10 and para. F-901(b). Within three (3) weeks after receipt of the NTP, the contractor shall submit the required site survey schedule/plan to the Contracting Officer for his review and approval.
As the submitted schedule/plan is approved by the Contracting Officer and all necessary airfield clearance and permit are obtained, the contractor can initiate the site survey on the airfield/runway.
(b) The contractor shall submit the site survey result report to the Contracting Officer within two (2) weeks after the date of the survey completion for the Government's examination and approval. In conjunction with the actual conditions of the airfield/runway of the project site validated by the site survey, if necessary, ELINs specified in the task order may be adjusted within the scope of the task order as determined by the Contracting Officer. Such adjustment including adjustment of the performance period, if necessary, will be made by a bilateral modification within the task order amount.
(c) Site Survey for FY End Task Order. In the event that award of task order occurs during the month of September and the performance for such task order will start in the subsequent month of October by crossing the U.S. fiscal year
(1 Oct thru 30 Sep of the following year), the contractor shall submit the site survey result report and material submittals except for those required at or after the construction stage, to the Contracting Officer by 15 December of that year. Subject to the Government’s approval of those report and submittals, the Government requires the contractor to submit a proof of material ordering or agreement/contract with the supplier(s) by 31 December of that year. After the winter period (15 Dec thru 15 Mar of the following year, refer to para. F-904), the contractor shall verify on-site conditions if any damage incurs per severe weather during the winter period. In case such damage requires changes in the initial site survey result report, the contractor shall incorporate those changes into the final site survey result report to the Contracting Officer by 30 Apr of that year.
(d) See paragraphs F-901 and F-904 for performance period and completion date.
H-909. APPLICABILITY OF THE DEFENSE BASE ACT
This contract includes FAR 52.228-3, Workers’ Compensation Insurance (Defense Base Act)(Apr 1984), and FAR
52.228-4, Worker’s Compensation and War-Hazard Insurance Overseas (Apr 1984). FAR 52.228-3 applies to (1) all employees who are United States citizens and (2) all employees hired from within the United States and its territories, regardless of their nationality. FAR 52.228-4 applies to all other employees not previously specified
H-916 APPLICABILITY OF FAR 52.209-9
FAR clause at 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters, in Section I will become applicable to the resultant contract when the successful offeror checked “has” in paragraph (b) of FAR provision at 52.209-7, Information Regarding Responsibility Matters, in Section K. Otherwise, the said clause will be automatically deleted from the resultant contract.
H-917 APPLICABILITY OF DFARS 252.247-7024
DFARS clause at 252.247-7024, Notification of Transportation of Supplies by Sea, in Section I will become applicable to the resultant contract only when the successful offeror made a negative response to the inquiry in
DFARS provision at 252.247-7022, Representation of Extent of Transportation by Sea, in Section K. Otherwise, the said clause will be automatically deleted from the resultant contract.
Section I - Contract Clauses
52.202-1 Definitions NOV 2013
52.203-3 Gratuities APR 1984
52.203-5 (INVALID EFF_DT) Covenant Against Contingent Fees DEC 1900
52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006
52.203-7 Anti-Kickback Procedures MAY 2014
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-13 Contractor Code of Business Ethics and Conduct APR 2010
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract
Awards
JUL 2013
52.204-13 System for Award Management Maintenance JUL 2013
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
AUG 2013
52.215-2 Audit and Records--Negotiation OCT 2010
52.222-50 Combating Trafficking in Persons FEB 2009
52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008
52.225-14 Inconsistency Between English Version And Translation Of
Contract
FEB 2000
52.228-2 Additional Bond Security OCT 1997
52.228-3 Worker's Compensation Insurance (Defense Base Act) APR 1984
52.228-4 Workers' Compensation and War-Hazard Insurance Overseas APR 1984
52.228-5 Insurance - Work On A Government Installation JAN 1997
52.228-11 Pledges Of Assets JAN 2012
52.228-14 Irrevocable Letter of Credit MAY 2014
52.228-15 Performance and Payment Bonds--Construction OCT 2010
52.229-6 Taxes--Foreign Fixed-Price Contracts FEB 2013
52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014
52.232-17 Interest MAY 2014
52.232-27 Prompt Payment for Construction Contracts MAY 2014
52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
JUL 2013
52.233-1 Disputes JUL 2002
52.233-3 Protest After Award AUG 1996
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004
52.236-2 Differing Site Conditions APR 1984
52.236-3 Site Investigation and Conditions Affecting the Work APR 1984
52.236-4 Physical Data APR 1984
52.236-5 Material and Workmanship APR 1984
52.236-6 Superintendence by the Contractor APR 1984
52.236-7 Permits and Responsibilities NOV 1991
52.236-8 Other Contracts APR 1984
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984
52.236-11 Use and Possession Prior to Completion APR 1984
52.236-12 Cleaning Up APR 1984
52.236-13 Alt I Accident Prevention (Nov 1991) - Alternate I NOV 1991
52.236-14 Availability and Use of Utility Services APR 1984
52.236-15 Schedules for Construction Contracts APR 1984
52.236-16 Alt I Quantity Surveys (Apr 1984) - Alternate I APR 1984
52.236-17 Layout of Work APR 1984
52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) -
Alternate I
APR 1984
52.236-26 Preconstruction Conference FEB 1995
52.242-13 Bankruptcy JUL 1995
52.242-14 Suspension of Work APR 1984
52.243-4 Changes JUN 2007
52.244-6 Subcontracts for Commercial Items MAY 2014
52.246-21 Warranty of Construction MAR 1994
52.248-3 Value Engineering-Construction OCT 2010
52.249-2 Alt I Termination for Convenience of the Government (Fixed-
Price) (Apr 2012) - Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction) APR 1984
52.253-1 Computer Generated Forms JAN 1991
252.201-7000 Contracting Officer's Representative DEC 1991
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-
Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Terrorist Country
MAR 2014
252.222-7002 Compliance With Local Labor Laws (Overseas) JUN 1997
252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010
252.223-7006 Prohibition On Storage And Disposal Of Toxic And
Hazardous Materials
APR 2012
252.225-7041 Correspondence in English JUN 1997
252.227-7032 Rights In Technical Data And Computer Software (Foreign) JUN 1975
252.227-7033 Rights in Shop Drawings APR 1966
252.229-7000 Invoices Exclusive of Taxes or Duties JUN 1997
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7008 Assignment of Claims (Overseas) JUN 1997
252.232-7010 Levies on Contract Payments DEC 2006
252.233-7001 Choice of Law (Overseas) JUN 1997
252.236-7000 Modification Proposals-Price Breakdown DEC 1991
252.236-7005 Airfield Safety Precautions DEC 1991
252.243-7001 Pricing Of Contract Modifications DEC 1991
252.243-7002 Requests for Equitable Adjustment DEC 2012
252.244-7000 Subcontracts for Commercial Items JUN 2013
252.247-7023 Transportation of Supplies by Sea APR 2014
252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY
MATTERS (JULY 2013)
(a) The Contractor shall update the information in the Federal Awardee Performance and Integrity Information
System (FAPIIS) on a semi-annual basis, throughout the life of the contract, by posting the required information in the System for Award Management database via https://www.acquisition.gov.
(b) As required by section 3010 of the Supplemental Appropriations Act, 2010 (Pub. L. 111-212), all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available. FAPIIS consists of two segments--
(1) The non-public segment, into which Government officials and the Contractor post information, which can only be viewed by--
(i) Government personnel and authorized users performing business on behalf of the Government; or
(ii) The Contractor, when viewing data on itself; and
(2) The publicly-available segment, to which all data in the non-public segment of FAPIIS is automatically transferred after a waiting period of 14 calendar days, except for--
(i) Past performance reviews required by subpart 42.15;
(ii) Information that was entered prior to April 15, 2011; or
(iii) Information that is withdrawn during the 14-calendar-day waiting period by the Government official who posted it in accordance with paragraph (c)(1) of this clause.
(c) The Contractor will receive notification when the Government posts new information to the Contractor's record.
(1) If the Contractor asserts in writing within 7 calendar days, to the Government official who posted the information, that some of the information posted to the non-public segment of FAPIIS is covered by a disclosure exemption under the Freedom of Information Act, the Government official who posted the information must within 7 calendar days remove the posting from FAPIIS and resolve the issue in accordance with agency Freedom of
Information procedures, prior to reposting the releasable information. The contractor must cite 52.209-9 and request removal within 7 calendar days of the posting to FAPIIS.
(2) The Contractor will also have an opportunity to post comments regarding information that has been posted by the
Government. The comments will be retained as long as the associated information is retained, i.e., for a total period of 6 years. Contractor comments will remain a part of the record unless the Contractor revises them.
(3) As required by section 3010 of Pub. L. 111-212, all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available.
(d) Public requests for system information posted prior to April 15, 2011, will be handled under Freedom of
Information Act procedures, including, where appropriate, procedures promulgated under E.O. 12600.
https://www.acquisition.gov/
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within see para. F-901(b) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the period or date set forth in each individual task order. The time stated for completion shall include final cleanup of the premises.
52.216-18 ORDERING. (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from *see below through *see below.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the
Schedule.
* Identical with the period specified in para. F-901(a).
52.216-19 ORDER LIMITATIONS. (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $2,000 or Yen equivalent), the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor:
(1) Any order for a single item in excess of Y600,000,000;
(2) Any order for a combination of items in excess of Y600,000,000; or
(3) A series of orders from the same ordering office within five (5) business days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal
Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the
Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.
(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within three (3) business days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.
52.216-22 INDEFINITE QUANTITY. (OCT 1995)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".
(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and
Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after 31 Dec of the following year of the contract expiration.
52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)
(a) The Government may extend the term of this contract by written notice to the Contractor no later than fifteen
(15) days prior to expiration of contract period; provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least sixty (60) before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.
(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed three
(3) years.
52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN 1997)
(a) "Hazardous material", as used in this clause, includes any material defined as hazardous under the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract).
(b) The offeror must list any hazardous material, as defined in paragraph (a) of this clause, to be delivered under this contract. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. This information shall also be included on the Material Safety
Data Sheet submitted under this contract.
Material Identification No.
(If none, insert "None")
(c) This list must be updated during performance of the contract whenever the Contractor determines that any other material to be delivered under this contract is hazardous.
(d) The apparently successful offeror agrees to submit, for each item as required prior to award, a Material Safety
Data Sheet, meeting the requirements of 29 CFR 1910.1200(g) and the latest version of Federal Standard No. 313, for all hazardous material identified in paragraph (b) of this clause. Data shall be submitted in accordance with
Federal Standard No. 313, whether or not the apparently successful offeror is the actual manufacturer of these items.
Failure to submit the Material Safety Data Sheet prior to award may result in the apparently successful offeror being considered nonresponsible and ineligible for award.
(e) If, after award, there is a change in the composition of the item(s) or a revision to Federal Standard No. 313, which renders incomplete or inaccurate the data submitted under paragraph (d) of this clause, the Contractor shall promptly notify the Contracting Officer and resubmit the data.
(f) Neither the requirements of this clause nor any act or failure to act by the Government shall relieve the Contractor of any responsibility or liability for the safety of Government, Contractor, or subcontractor personnel or property.
(g) Nothing contained in this clause shall relieve the Contractor from complying with applicable Federal, State, and local laws, codes, ordinances, and regulations (including the obtaining of licenses and permits) in connection with hazardous material.
(h) The Government's rights in data furnished under this contract with respect to hazardous material are as follows:
(1) To use, duplicate and disclose any data to which this clause is applicable. The purposes of this right are to--
(i) Apprise personnel of the hazards to which they may be exposed in using, handling, packaging, transporting, or disposing of hazardous materials;
(ii) Obtain medical treatment for those affected by the material; and
(iii) Have others use, duplicate, and disclose the data for the Government for these purposes.
(2) To use, duplicate, and disclose data furnished under this clause, in accordance with subparagraph (h)(1) of this clause, in precedence over any other clause of this contract providing for rights in data.
(3) The Government is not precluded from using similar or identical data acquired from other sources.
52.228-15 PERFORMANCE AND PAYMENT BONDS – CONSTRUCTION (OCT 2010), is modified to reflect the Contracting Officer’s waiver of requirement for payment bonds and sureties appearing on
Treasury Department Circular 570 which was made in accordance with
FAR 28.102-1(a)(1) and FAR 28.202(b), as follows.
1. The words of "and payment" are deleted from the words of "performance and payment" at the clause title, para.
(b), and para. (b)(3)(i), respectively. In addition, para. (b)(2) and (e) are deleted from the clause in their entirety.
2. The words of “, or sureties authorized for issuance of the performance bond by the Financial Service Agency, the
Government of Japan” are added at the end of 1st sentence in para. (d).
52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least twelve (12) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the
Contracting Officer determines that the reduction would be to the advantage of the Government.
52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991), is modified as follows, in accordance with
AFFARS 5336.507:
The first sentence in the clause at FAR 52.236-7 is modified to reflect "host government and political subdivisions" in lieu of "Federal, State, and Municipal".
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Name of Website – United States Air Force FAR Site. URL: http//farsite.hil.af.mil
52.252-4 ALTERATIONS IN CONTRACT (APR 1984)
Portions of this contract are altered as follows:
None.
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any Defense Federal Acquisition Regulation Supplement (48 CFR
Chapter 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
252.225-7043 ANTITERRORISM/FORCE PROTECTION POLICY FOR DEFENSE CONTRACTORS
OUTSIDE THE UNITED STATES (MAR 2006)
(a) Definition. United States, as used in this clause, means, the 50 States, the District of Columbia, and outlying areas.
(b) Except as provided in paragraph (c) of this clause, the Contractor and its subcontractors, if performing or traveling outside the United States under this contract, shall--
(1) Affiliate with the Overseas Security Advisory Council, if the Contractor or subcontractor is a U.S. entity;
(2) Ensure that Contractor and subcontractor personnel who are U.S. nationals and are in-country on a non-transitory basis, register with the U.S. Embassy, and that Contractor and subcontractor personnel who are third country nationals comply with any security related requirements of the Embassy of their nationality;
(3) Provide, to Contractor and subcontractor personnel, antiterrorism/force protection awareness information commensurate with that which the Department of Defense (DoD) provides to its military and civilian personnel and their families, to the extent such information can be made available prior to travel outside the United States; and
(4) Obtain and comply with the most current antiterrorism/force protection guidance for Contractor and subcontractor personnel.
(c) The requirements of this clause do not apply to any subcontractor that is--
(1) A foreign government;
(2) A representative of a foreign government; or
(3) A foreign corporation wholly owned by a foreign government.
(d) Information and guidance pertaining to DoD antiterrorism/force protection can be obtained from the appropriate
Antiterrorism Force Protection Office at the Command Headquarters. Also see http://atep.dtic.mil. For additional information: Assistant Secretary of Defense for Special Operations and Low Intensity Conflict, ASD (SOLIC); telephone, DSN 227-7205 or commercial (703)697-7205.
252.225-7045 BALANCE OF PAYMENTS PROGRAM--CONSTRUCTION MATERIAL UNDER TRADE
AGREEMENTS (OCT 2013)
(a) Definitions. As used in this clause--
Caribbean Basin country construction material means a construction material that---
(1) Is wholly the growth, product, or manufacture of a Caribbean Basin country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.
Commercially available off-the-shelf (COTS) item--
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition of ``commercial item'' in section 2.101 of the
Federal Acquisition Regulation);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .