Pre-proposal_Conf_Minutes_FA5205-14-R-0010.pdf
PDF 744 KB Posted
- Attached to
- Airfield/Pavements IDIQ Contract Federal contract opportunity
- Solicitation number
- FA5205-14-R-0010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Identifiable_Offeror_Name _14R0010-0002_Exhibit_A-C.xls | XLS spreadsheet | |
| Amend_0002_to_RFP_No._FA5205-14-R-0010.pdf | ||
| Amend_0001_to_RFP_No.FA5205-14-R-0010.pdf | ||
| Response_to_Question_RFP_No._FA5205-14-R-0010.pdf | ||
| Atch_3_Submittal_Register.pdf | ||
| Atch_1_Specs.pdf | ||
| Identifiable_Offeror_Name _14R0010_Exhibit_A-C.xls | XLS spreadsheet | |
| RFP_No._FA5205-14-R-0010.pdf | ||
| Atch_5_Historical_Data.pdf | ||
| Atch_2_Dwgs.pdf | ||
| Atch_4_List_of_CFUSM.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I n t e g r i t y - S e r v i c e - E x c e l l e n c e
35th FW Misawa Air Base
Pre-Proposal Conference / Site Visit
Airfield/Pavements IDIQ Contract RFP No. FA5205-14-R-0010
Starting 1030 hrs, 8 Aug 2014
Bldg. 656, Misawa AB, Japan
Summary
Scope & Requirements General Requirement / Pricing Structure
RFP
CONS remarks for solicitation / filling Instructions
CES tech briefing (Exhibit L/I, Specs, and Drwg)
Q & A session
Site Visit to Airfield
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
Attachment 1 to Pre-Proposal Conference Minutes & Record of Site Visit
Project Description (Sec B):
Repair, maintenance, or construction of Airfield, and incidental work, per Task Order.
Place: Airfield, Misawa AB, Japan.
Contract Type: FP-IDIQ (U/P & TO basis).
Period: 1 Year Basic Period + 2 one-year Options
Value: Guaranteed Minimum $5K (¥519,720), Contract Limit $38M.
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
RFP
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
Fill-in
Section B, Page 3 thru 5
Proposal of CLIN Amounts Fill-in
See Exhibit
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
See Exhibit
Section B, Page 3 thru 5
Proposal of CLIN Amounts (Cont’d) Fill-in
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
See Exhibit
Fill sum of CLIN 0001, 1001, and 2001
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
CLIN & Exhibit Structure
CLIN 0001 Basic Period Exhibit A
ELIN A001AA -
ELIN A001EY
CLIN 1001 Opt Yr One Exhibit B
ELIN B001AA -
ELIN B001EY
CLIN 2001 Opt Yr Two Exhibit C
ELIN C001AA -
ELIN C001EY
SF 1442 Page 3 - 4
ELINs & Coefficients
Survey Work (ELIN A/B/C001AA – AF):
Daytime Basis Only
Temporary & Protection Work (ELIN A/B/C001AK – AN):
Day or Month Basis
All other ELINs: Nighttime Basis Coefficients for Conversion of Nighttime to Daytime Work per 3 Types of Work:
Type of Work Items Coefficient from Night to Day A - Asphalt/Concrete Pavement Work 97.5% B - Base/Sub-base Course & Electric Work 90.0% C - Removal/Disposal Work 77.5%
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
Exhibit A thru C – Basic & Option Years
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
See RFP Atch.5 for Ref.
Fill offeror’s name, address, signature, seal/han
Fill-in
Unit price / extended amount
Section B, Page 3 thru 5
Note to Offerors The offeror has been duly authorized to operate and to do business in the host nation country where the contract is to be performed, and the contractor shall be responsible for obtaining any necessary licenses and permits, and for complying with any host government and political subdivisions laws, codes, and regulations applicable IAW FAR 52.236-7 Permits and Responsibilities (modified IAW
AFFARS 5336.507).
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
Section F:
52.211-12 Liquidated Damages
@¥68,516 (1st day ) & @¥32,275 (2nd day ~ ).
F-901 Period: To be indicated upon award.
F-904 Limitation in Exterior Work.
15 December through 15 March
Section H:
Para H-901 Required Insurance Property Damage - ¥2,000,000
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
(Sec H cont’d)
H-902 Performance Bond Required 100% of TO > $150K.
Required add’l if Mod > $10K.
Submit <= 30 CD from TO / Mod award.
H-908 Site Survey and TO Site survey schedule/plan: Submit within 3 weeks after receipt of Notice to Proceed (NTP).
Site survey result report: Submit within 2 weeks after completion of survey.
FY end TO: Submit survey report by 15 December.
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
Section I
FAR 52.223-3 Hazardous Material
Section J
Exhibit / Attachment Table Exhibit A - C: CLIN 0001 thru 2001 ELINs
Atch 1 Specifications
Atch 2 Drawings
Atch 3 Schedule of Contractor’s Submittals
Atch 4 List of Contractor-Furnished U.S. Material
Atch 5 Historical Data
Fill-in
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
Section K
FAR 52.204-8 Annual Representation Cert
FAR 52.209-7 Responsibility Matters Info
DFARS 252.247-7022 Transportation by Sea
K-800 Tax Exemption under SOFA
K-900 Contractor’s Cert
Fill-in
Fill-in
Fill-in
Fill-in
Fill-in
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
Airfield IDIQ - Pre-Proposal Conference
(Sec K cont’d)
K-901 CONSTRUCTION CONTRACTOR LICENSE
Offeror shall submit 4 copies of “special construction license” under applicable law of Japan together with offer, to demonstrate compliance with FAR 52.236-7 as modified.
Joint venture or Partnership - the special construction license of each member of the JV or each partner of the partnership must be submitted together with the offer
Such offeror that fails in representation of the above required license will not be considered for award.
Submit
Section L L-100 Proposal Preparation Instructions
Offer required to meet all sol. requirements, terms & conditions, reps & certs, & tech requirements.
Prepare & Submit:
Tech Proposal: 1 Original + 4 copy
Price Proposal: Submit 1 Original, including hard copy and electronic file of Exhibit A thru C. Use MS Excel w/file name: [Company]_14R0010_ExhibitA-F.xls
PPI: 1 Original + 4 copy
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
Submit
(Sec L cont’d)
PPI:
Relevancy: Airfield Const/Rpr/ Maint, involving concurrent multi-locations work.
Recency: Work within 6-Yr from 31 Jul 2014.
Max. 10 contracts/projects (Max. 5 pages per contract/project).
Provide information required in L-100 (f)(3)(ii).
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
Section M
M-900 Basis of Award & Evaluation
Weight of Importance:
Past Performance is approximately equal to price.
Evaluation Process:
Technical Acceptability – Acceptable or Unacceptable
Price – Reasonable
Past Performance – Recency and Relevancy
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
(Sec M cont’d)
M-902 Evaluation of Opt
Gov’t will evaluate offers by adding all options.
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
Civil Engineer Technical Briefing
Exhibit A thru C: Line Items Attachment 1: Specifications Attachment 2: Drawings Attachment 3: Schedule of Contractor’s
Submittals Attachment 4: List of Contractor-Furnished
U.S. Material (CFUSM)
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
Questions
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
Let’s move on to Site Visit but please remind
RFP Closing Date / Time:
9 Sep 14/ 14:00
Questions shall be submitted to 35 CONS/LGCA by NLT 1100 hrs on 12 Aug 14.
RFP No. FA5205-14-R-0010 Airfield IDIQ - Pre-Proposal Conference
SUMMARY OF QUESTIONS AND ANSWERS
Airfield/Pavements IDIQ Contract, Misawa AB, Japan
Attachment 2 to Pre-Proposal Conference Minutes & Record of Site Visit
Questions and Answers at Conference:
Q1: How will price coefficient apply to ELIN for conversion of nighttime to daytime work?
A1: The applicable coefficient is indicated per type of “A”, “B”, or “C” for each ELIN in Exhibits.
Q2: Is the fuel for construction equipment considered as hazardous material?
A2: Hazardous material is defined under the latest version of Federal Standard No. 313, as stipulated in FAR clause 52.223-3.
Q3: What is the percentage of daytime work in the estimated quantities of ELINs for the nighttime work?
A3: Approx. 10 thru 30% were daytime work under the previous projects.
Q4: Will a stockyard close to the airfield be available on base for the contractor’s use?
A4: It will be subject to coordination with the
Government through AF Form 103.
Q5: Will the *Apple Gate be available for delivery of items except for asphalt/concrete into the base during the non-operating hours, if the contractor coordinates with the Government?
*Apple Gate is the entry gate into Misawa Air Base for heavy equipment trucks and vehicles with maximum loading capacity of 680kg or more.
A5: No. Items other than asphalt/concrete shall be delivered through the Apple Gate during the operating hours from 0600 – 1400 hours, Monday through Friday. Only asphalt/concrete can be delivered through the Apple Gate during the non-operating hours per advance coordination with the Government.