Atch 3 to Amendment No. 0002.pdf

PDF 64 KB Posted

Attached to
Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC), Misawa Air Base, Japan
Solicitation number
FA5205-10-R-0008
Issued by

About this file

Attachment 3 to Amendment No. 0002 - Addendum No. 2 to MACC Seed Project dated 25 Aug 10 1 page with revised pages of Statement of Work 3 pages.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM No.2

TO

MACC Seed Project Statement of Work

RFP No. FA5205-10-R-0008

PROJECT No. QKKA10-1092

Repair Lightning Protection System B1495

Misawa AB, Japan

25 Aug 2010

The statement of work is amended to provide the following changes:

1. Para. 2.4. PROJECT OBJECTIVES. Change the 2nd sentence from “LPS must meet Tri-Service

Standard as follows:” to “LPS must meet the following standards:.

2. The SOW dated 19 Aug 2010, page 1 and 6 of 6 are replaced with the SOW dated 25 Aug 2010.

Attachment:

The SOW, Revised 24 Aug 10, Page 1 and 6, 2 pages.

SATEMENT OF WORK

FOR

MULTIPLE AWARD CONSTRUCTION CONTRACT

100% Design-Build Construction Project

PROJECT NO. QKKA 10-1092

Repair Lightning Protection System B1495

MISAWA AIR BASE, JAPAN

25 Aug 2010

Attachment 3 to

RFP No. FA5205-10-R-0008

PROJECT NUMBER: QKKA10-1092 Revised 25 Aug 10 per Addendum No. 2

PROJECT TITLE: REPAIR LIGHTNING PROTECTION SYSTEM, Bldg. 1495

2.2.1 INFORMATION AVAILABLE TO THE CONTRACTOR:

(i) As-built drawings, 15 sheets (Attached in this Statement of Work).

2.3.3 Asbestos sampling data for Bldg. 1495 is provided in Attachment 4. No asbestos related work will be involved in removal of the existing Lightning Protection System.

2.3.4 Soil boring data in Munition Area is provided in Attachment 5, for reference.

2.3 PROJECT OBJECTIVES:

Existing Lightning Protection System (LPS) does not meet requirement of HQ PACAF explosive Safety Standard. LPS must meet the following standards:

AFMAN 91-201: Explosives Safety Requirements, AFI 32-1065: Grounding System, NFPA 780: Standard for the Installation of Lightning Protection Systems, NFPA 70:

National Electrical Code, ANSI C135.30: Grounding Rod, Air Force AFM 88-9 CHAP.3

/ ARMY TM 5-811-3, UFGS-26 41 00.00 40: Lightning Protection System, UFC 3-301-

01: Structural Engineering, UL 96: Lightning Protection Components, UL 96A:

Installation Requirements for Lightning Protection System, UL 467: Grounding and

Bonding Equipment, UFC 3-260-01:Airfield and heliport planning and design, JRA:

Japan Road Association, JIS (Refer Equivalent table)

2.4 DESCRIPTION OF WORK:

Remove the existing Lightning Protection System (LPS) for the building 1495 which include grounding terminals, grounding wires and accessories.

All affected area from demolitions work shall be restored to the original condition.

Provide new Lightning Protection System for the building 1495 that shall meet the following requirements for paragraph 2.0 Design Policy and Criteria.

Provide & submit design analysis, drawings, cost estimate & specifications for new

LPS of the building 1495.

Provide underground grounding loop system for the building with grounding rods, and test point with hand holes.

Provide new Overhead Wire (Catenary) Type Lightning Protection System with High

Mast Steel Pole (Withstand wind velocity: 45mps (101mi/h)) and overhead grounding wires with accessories for the building 1495.

Soil sampling boring is required around the building 1495 for this project, based on the soil sampling data in Munition Area, Attachment 5, as reference.

2.5 MIMIMUM REQUIREMENT: Please refer the attached List of Required Work

Elements.

3.0 SPECIAL CONDITION:

File details come from the government source that posted it. Updated .