ADDENDUM No.2
TO
MACC Seed Project Statement of Work
RFP No. FA5205-10-R-0008
PROJECT No. QKKA10-1092
Repair Lightning Protection System B1495
Misawa AB, Japan
25 Aug 2010
The statement of work is amended to provide the following changes:
1. Para. 2.4. PROJECT OBJECTIVES. Change the 2nd sentence from “LPS must meet Tri-Service
Standard as follows:” to “LPS must meet the following standards:.
2. The SOW dated 19 Aug 2010, page 1 and 6 of 6 are replaced with the SOW dated 25 Aug 2010.
Attachment:
The SOW, Revised 24 Aug 10, Page 1 and 6, 2 pages.
SATEMENT OF WORK
FOR
MULTIPLE AWARD CONSTRUCTION CONTRACT
100% Design-Build Construction Project
PROJECT NO. QKKA 10-1092
Repair Lightning Protection System B1495
MISAWA AIR BASE, JAPAN
25 Aug 2010
Attachment 3 to
RFP No. FA5205-10-R-0008
PROJECT NUMBER: QKKA10-1092 Revised 25 Aug 10 per Addendum No. 2
PROJECT TITLE: REPAIR LIGHTNING PROTECTION SYSTEM, Bldg. 1495
2.2.1 INFORMATION AVAILABLE TO THE CONTRACTOR:
(i) As-built drawings, 15 sheets (Attached in this Statement of Work).
2.3.3 Asbestos sampling data for Bldg. 1495 is provided in Attachment 4. No asbestos related work will be involved in removal of the existing Lightning Protection System.
2.3.4 Soil boring data in Munition Area is provided in Attachment 5, for reference.
2.3 PROJECT OBJECTIVES:
Existing Lightning Protection System (LPS) does not meet requirement of HQ PACAF explosive Safety Standard. LPS must meet the following standards:
AFMAN 91-201: Explosives Safety Requirements, AFI 32-1065: Grounding System, NFPA 780: Standard for the Installation of Lightning Protection Systems, NFPA 70:
National Electrical Code, ANSI C135.30: Grounding Rod, Air Force AFM 88-9 CHAP.3
/ ARMY TM 5-811-3, UFGS-26 41 00.00 40: Lightning Protection System, UFC 3-301-
01: Structural Engineering, UL 96: Lightning Protection Components, UL 96A:
Installation Requirements for Lightning Protection System, UL 467: Grounding and
Bonding Equipment, UFC 3-260-01:Airfield and heliport planning and design, JRA:
Japan Road Association, JIS (Refer Equivalent table)
2.4 DESCRIPTION OF WORK:
Remove the existing Lightning Protection System (LPS) for the building 1495 which include grounding terminals, grounding wires and accessories.
All affected area from demolitions work shall be restored to the original condition.
Provide new Lightning Protection System for the building 1495 that shall meet the following requirements for paragraph 2.0 Design Policy and Criteria.
Provide & submit design analysis, drawings, cost estimate & specifications for new
LPS of the building 1495.
Provide underground grounding loop system for the building with grounding rods, and test point with hand holes.
Provide new Overhead Wire (Catenary) Type Lightning Protection System with High
Mast Steel Pole (Withstand wind velocity: 45mps (101mi/h)) and overhead grounding wires with accessories for the building 1495.
Soil sampling boring is required around the building 1495 for this project, based on the soil sampling data in Munition Area, Attachment 5, as reference.
2.5 MIMIMUM REQUIREMENT: Please refer the attached List of Required Work
Elements.
3.0 SPECIAL CONDITION: