ADDENDUM No.1
TO
MACC GENERAL PROVISIONS
RFP No. FA5205-10-R-0008
IDIQ MACC
25 Aug 2010
The General Provisions is amended to provide the following changes:
1. Project Table of Contents. Page numbers of Division 01 01 00 are changed from “PAGE 1 – PAGE
19” to “PAGE 1 – PAGE 20”.
2. Division 01 01 00, Statement of Work. Add the following paragraphs in the end of this division at page 20.
“6.12. Disposal
Except as specified elsewhere in this General Provisions or the Statement of Work for individual project, all residue and scrap generated by the contractor during the performance shall be disposed of outside the confines of Misawa Air Base IAW all applicable Japanese Laws at no additional cost to the government.
6.13. Hazardous Waste
All hazardous waste will be managed, segregated, stored, transported, and disposed of in accordance with the Misawa AB Hazardous Waste Management Plan. All hazardous wastes must be disposed of through the Defense Reutilization and Marketing Office (DRMO), Misawa AB branch.”
3. Appendix 1, Project Flowchart. Add Project Flowchart.
4. The General Provisions dated 24 May 10, cover page and table of contents (page 1 and 2) are replaced with the General Provisions dated 25 Aug 10, and page 20 of Division 01 01 00 is added.
Attachment:
The MACC General Provision Revised 25 Aug 10, Page 1, 2, Division 01 01 00 Page 20 & Appendix 1, 4 pages.
RFP NO. FA5205-10-R-0008
Contract NO.
MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)
GENERAL PROVISIONS
FOR
DEPARTMENT OF U.S. AIR FORCE
IN MISAWA, JAPAN
Date: Aug 25, 2010
DEPARTMENT OF THE AIR FORCE
MISAWA AIR BASE, JAPAN
35TH CIVIL ENGINEER SQUADRON
APO AP 96319-5022
Attachment 1
PROJECT TABLE OF CONTENTS
DIVISION/SECTION TITLE PAGE NO.
DIVISION 01 GENERAL REQUIREMENTS
01 01 00 Statement of Work PAGE 1 – PAGE 20
01 11 00 Design After Award PAGE 1 – PAGE 13
01 78 00 Closeout Submittals PAGE 1 – PAGE 2
Appendix 1: Project Flowchart
ABBREVIATIONS:
AAS – Atomic Absorption Spectrum
CES – Civil Engineering Squadron.
CID – Comprehensive Interior Design
CO – Contracting officer.
COR – Contracting Officer’s Representative.
CQC – Contractor Quality Control
DB – Design Build
DBB – Design Bid Build.
GFE – Government Furnished Equipment
GFM – Government Furnished Material
HM – Hazardous Material
HMBP – Heavy Metal-Based Paint
IDG – Installation Design Guide
JEGS – Japan Environmental Governing Standards
JIS – Japanese Industrial Standards MACC – Multiple Award Construction Contract
QAPP – Quality Assurance Program Plan
RFP – Request for Proposal
TO – Task Order
Revised 25 Aug 10 per Addendum No. 1
SECTION 01 01 00 PAGE 20
6.12. Disposal
Except as specified elsewhere in this General Provisions or the Statement of Work for individual project, all residue and scrap generated by the contractor during the performance shall be disposed of outside the confines of Misawa Air Base IAW all applicable Japanese Laws at no additional cost to the government.
6.13. Hazardous Waste
All hazardous waste will be managed, segregated, stored, transported, and disposed of in accordance with the Misawa AB Hazardous Waste Management Plan. All hazardous wastes must be disposed of through the Defense Reutilization and Marketing Office (DRMO), Misawa AB branch.
END OF SECTION
Added 25 Aug 10 per Addendum No. 1
Only Construction
OPR Ktr 100% Design Ktr 0% Design
Routine Urgent Routing Urgent
CES Project Identification Project Identification
CONS TO RFP w/ SOW TO RFP w/ 100% Design pkg
3 2 3 2 CONS Joint Site Visit / Meeting Joint Site Visit / Meeting
28 14 35 21 KTR Proposals w/ Concept Proposal
10 7 14 7 GOVT Gov't Evaluation Gov't Evaluation
7 5 7 5 GOVT Discussion (if required) Discussion (if required)
4 2 4 2 CONS Source Selection Source Selection
14 14 14 14 CONS CRC/SJA/HQ PACAF Review CRC/SJA/HQ PACAF Review
66 44 77 51 CONS 100% DB TO Award "Only Const" TO Award
7 5 7 5 KTR Pre-performance Conference ▼
30 21 35 21 KTR 35% Submittal ▼ ▼ ▼
21 14 21 21 GOVT Gov't Review/Approval ▼ ▼ ▼
30 14 35 21 KTR 65% Submittal ▼ ▼ ▼
21 7 25 14 GOVT Gov't Review/Approval ▼ ▼ ▼
30 14 35 14 KTR 95% Submittal ▼ ▼
14 7 14 10 GOVT Gov't Review/Approval ▼ ▼
14 7 14 10 KTR 100% / Final Submittal ▼
14 7 14 10 GOVT Gov't Review/Approval ▼
181 96 200 126 GOVT Acceptance of Final Design ▼
30 30 30 30 KTR Performance Bond Performance Bond
7 7 7 7 GOVT Pre-Construction Conference/NTP Pre-Construction Conference/NTP
KTR Construction Work Construction Work
5 5 5 5 GOVT Final Acceptance Final Acceptance
30 30 30 30 GOVT Final Payment Final Payment
30 30 30 30 GOVT/KTR Past Performance Evaluation Past Performance Evaluation
Closeout Closeout
Multiple Award Construction Contract (MACC)
PROJECT FLOWCHART
Non-complex Complex
Design-BuildTypical Numbers of Days (CD)
Ktr Partial Design
Discussion (if required)
Partial DB TO Award
CRC/SJA/HQ PACAF Review
Source Selection
Post Award
Project Identification
TO RFP w/ Partial Design pkg
Joint Site Visit / Meeting
Proposal
Gov't Evaluation
PR Acceptance by CONS
Acceptance of Final Design
Gov't Review/Approval
100% / Final Submittal
65% Submittal
Past Performance Evaluation
Final Payment
Final Acceptance
Construction Work
Performance Bond
Pre-Construction Conference/NTP
Pre-performance Conference
Closeout
95% Submittal
Gov't Review
Gov't Review
Appendix 1 to MACC General Provisions Added 25 Aug 10 per Addendum No. 1