JA-3,_Submittal_Register.pdf
PDF 130 KB Posted
- Attached to
- F-35 Repair Arctic Utilidor CHPP Federal contract opportunity
- Solicitation number
- FA500418BA002
About this file
Submittal Register
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| JA-4_Drawings_(10.31.18.pdf | ||
| JA-2,_Specifications_(11.7.18).pdf | ||
| Solicitation_Amendment_FA500418BA0020004_SF_30.pdf | ||
| JA-3,_Submittal_Register_(11.5.18).pdf | ||
| Solicitation_Amendment_-_FA500418BA0020004.pdf | ||
| Solicitation_Amendment_-_FA500418BA0020003.pdf | ||
| Question_&_Answers_V1_12Oct18.pdf | ||
| Solicitation_Amendment_FA500418BA0020002_SF_30.pdf | ||
| JA-6,_Eielson_ERP_Atlas_2018.pdf | ||
| JA-1,_Synopsis_Rev_1_(10.12.18).doc.pdf | ||
| JA-2_Specs_Rev_1_(07.09.18).pdf | ||
| FA500418BA0020001_SF_30_Solicitation_Amendment.pdf | ||
| JA-3_Submittal_Register_Rev_1_(07.09.18).pdf | ||
| JA-2,_Specifications_(4.18.18).pdf | ||
| JA-1,_Synopsis_(6.26.18).pdf | ||
| JA-4,_Drawings_(6.21.18).pdf | ||
| Solicitation_-_FA500418BA002.pdf | ||
| JA-5,_Wage_Determination_(8.24.18).pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Final Design Repair Arctic Utilidor EIE South Eielson Air Force Base
FTQW 18-0321
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Line
Acti vity
Trans-mittal #
Specification Section
SD
# Submittal Description Item Submitted
Paragraph
Classificati on: GOVT or A/E Revwr Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR / Auth Date RCD From
CONTR
Date FWD To
Other Revwr
Date
RCD
From Other Revwr
Action Code
Date Of Action
Mailed To
CONTR/
Date RCD From
APPR
Authority Remarks
1 01 30 00 01 Preconstruction Submittals View Location Map 1.3 G
2 01 30 00 01 Preconstruction Submittals Progress and Completion Pictures 1.4 G
3 01 35 26 01 Preconstruction Submittals Accident Prevention Plan (APP) 1.6 G
4 01 35 26 06 Test Reports Notifications and Reports 1.11 G
5 01 35 26 06 Test Reports Accident Reports 1.11.2 G
6 01 35 26 06 Test Reports LHE Inspection Reports 1.11.3 G
7 01 35 26 07 Certificates Crane Operators/Riggers 1.5.1.4 G
8 01 35 26 07 Certificates Standard Lift Plan 1.6.2.2 G
9 01 35 26 07 Certificates Critical Lift Plan 1.6.2.3 G
10 01 35 26 07 Certificates Activity Hazard Analysis (AHA) 1.7 G
11 01 35 26 07 Certificates Confined Space Entry Permit 1.8.1 G
12 01 35 26 07 Certificates Hot Work Permit 1.8.1 G
13 01 35 26 07 Certificates Certificate of Compliance 1.11.4 G
14 01 35 26 07 Certificates License Certificates 1.13 G
15 01 45 35 01 Preconstruction Submittals SIOR Letter of Acceptance 3.1.1 G
16 01 45 35 01 Preconstruction Submittals Written Practices 3.1.1 G
17 01 45 35 01 Preconstruction Submittals Ndt Procedures And Equipment Calibration Records 3.1.1 G
18 01 45 35 01 Preconstruction Submittals Project Manual 3.1.1 G
19 01 45 35 06 Test Reports Daily Reports 3.1.1 G
20 01 45 35 06 Test Reports Biweekly Reports 3.1.1 G
21 01 45 35 07 Certificates Fabrication Plant 2.1 G
22 01 45 35 07 Certificates Steel Truss Plant G
23 01 45 35 07 Certificates Wood Truss Plant G
24 01 45 35 07 Certificates Ac472 Accreditation G
25 01 45 35 07 Certificates Steel Joist Institute Membership G
26 01 45 35 07 Certificates Certified Plant G
27 01 45 35 07 Certificates Certificate Of Compliance 2.1 G
28 01 45 35 07 Certificates Qualification Records 3.1.1 G
29 01 45 35 07 Certificates Special Inspector of Record 1.5.17 G
30 01 45 35 07 Certificates Special Inspector 1.5 G
31 01 45 35 11 Closeout Submittals Interim Final Report 3.1.1 G
32 01 45 35 11 Closeout Submittals Comprehensive Final Report 3.1.1 G
33 01 50 00 01 Preconstruction Submittals Construction Site Plan 1.3 G
34 01 50 00 01 Preconstruction Submittals Traffic Control Plan 3.4.1 G
35 01 50 00 06 Test Reports Backflow Preventer Tests G
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
TITLE:
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
6/30/2018
Eielson Air Force Base
FTQ 18-0321
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
TITLE:
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
36 01 50 00 07 Certificates Backflow Tester 1.4.1 G
37 01 50 00 07 Certificates Backflow Preventers 1.4 G
38 01 57 19 01 Preconstruction Submittals Dewatering Work Plan 3.2 G
39 01 57 19.01 20 01 Preconstruction Submittals Submittal Register Part 3 G
40 01 58 00 02 Shop Drawings Preliminary Drawing Indicating Layout And Text Content 1.3.1 G
41 01 74 19 01 Preconstruction Submittals Waste Management Plan 1.6 G
42 01 74 19 11 Closeout Submittals Records 1.7 G
43 01 78 00 03 Product Data Warranty Management Plan 1.6.1 G
44 01 78 00 03 Product Data Warranty Tags 1.6.3 G
45 01 78 00 03 Product Data Spare Parts Data 1.4 G
46 01 78 00 08 Manufacturer’s Instructions Instructions 1.6.1 G
47 01 78 00 10 Operation and Maintenance Data Operation and Maintenance Manuals 3.6 G
48 01 78 00 11 Closeout Submittals As-Built Drawings 3.1 G
49 01 78 00 11 Closeout Submittals Record Drawings 3.2 G
50 01 78 00 11 Closeout Submittals As-Built Record Of Equipment And Materials 3.5 G
51 01 78 00 11 Closeout Submittals Final Approved Shop Drawings 3.3 G
52 01 78 00 11 Closeout Submittals Construction Contract Specifications 3.4 G
53 01 78 00 11 Closeout Submittals Interim DD Form 1354 3.8 G
54 01 78 00 11 Closeout Submittals Checklist For DD Form 1354 3.8 G
55 01 78 23 10 Operation and Maintenance Data O&M Database 1.3 G
56 01 78 23 10 Operation and Maintenance Data Training Plan 3.1.1 G
57 01 78 23 10 Operation and Maintenance Data Training Outline 3.1.3 G
58 01 78 23 10 Operation and Maintenance Data Training Content 3.1.2 G
59 01 78 23 11 Closeout Submittals Training Video Recording 3.1.4 G
60 01 78 23 11 Closeout Submittals Validation of Training Completion 3.1.6 G
61 02 41 00 01 Preconstruction Submittals Demolition Plan 1.2.1 G
62 02 41 00 01 Preconstruction Submittals Existing Conditions 1.8 G
63 02 41 00 07 Certificates Notification 1.6 G
64 02 41 00 11 Closeout Submittals Receipts G
65 02 61 13 02 Shop Drawings Surveys 3.1 G
66 02 61 13 03 Product Data Work Plan 1.3.2 G, ADEC
67 02 61 13 03 Product Data Closure Report 3.10 G
68 02 61 13 06 Test Reports Backfill 2.2 G
69 02 61 13 06 Test Reports Surveys 3.1 G
70 02 61 13 06 Test Reports Confirmation Sampling and Analysis 3.5 G
71 02 61 13 06 Test Reports Sampling of Stored Material 3.7.1 G, ADEC
72 02 61 13 06 Test Reports Sampling Liquid 3.7.2 G
Eielson Air Force Base
FTQ 18-0321
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
TITLE:
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
73 02 61 13 06 Test Reports Compaction G
74 02 80 00 01 Preconstruction Submittals Asbestos Removal and Disposal Schedules 1.6.1 G
75 02 80 00 01 Preconstruction Submittals Disposal Site Designations 1.6.2 G
76 02 80 00 01 Preconstruction Submittals Waste Transporter Designation 1.6.3 G
77 02 80 00 01 Preconstruction Submittals Notification of Demolition and Renovation 1.6.4.a G
78 02 80 00 01 Preconstruction Submittals Written Notification to ADOL 1.6.4.b G
79 02 80 00 07 Certificates Letter from ADOL Stating Workers are Certified for Asbestos Work
1.6.4.c G
80 02 80 00 07 Certificates Workers' Current State of Alaska Asbestos Abatement Certificates
1.6.4.d G
81 02 80 00 01 Preconstruction Submittals Work Plan 1.6.5 G
82 02 80 00 11 Closeout Submittals Waste Shipment Records 1.7.1 G
83 02 80 00 11 Closeout Submittals Disposal Site Receipts 1.7.2 G
84 02 80 00 11 Closeout Submittals Revised EPA Notification Showing Actual Disposal Amounts 1.7.3 G
85 23 22 26.00 20 03 Product Data Condensate Meters 2.1.1 G
86 31 00 00 03 Product Data Utilization of Excavated Materials 3.6 G
87 31 00 00 03 Product Data Opening of any Excavation or Borrow Pit 3.3 G
88 31 00 00 06 Test Reports Testing 3.13 G
89 31 00 00 06 Test Reports Borrow Site Testing 2.1 G
90 31 00 00 07 Certificates Testing 3.13 G
91 31 09 20.00 29 01 Preconstruction Submittals Sampling and Analysis Plan (SAP) G
92 31 09 20.00 29 01 Preconstruction Submittals Safety and Health Program (SHP) G
93 31 09 20.00 29 01 Preconstruction Submittals Resume' of consultant. G
94 31 09 20.00 29 06 Test Reports Field Report G
95 31 09 20.00 29 06 Test Reports Draft and Final Field Report. G
96 31 09 20.00 29 06 Test Reports Correspondence G
97 31 09 20.00 29 07 Certificates Qualifications G
98 32 12 16 06 Test Reports Mix Design 2.1.1 G
99 32 12 16 06 Test Reports Subbase Analysis 2.1.2 G
100 32 12 16 06 Test Reports Aggregate Base Course 2.1.3 G
101 32 92 19 03 Product Data Fertilizer 2.4 G
102 32 92 19 06 Test Reports Topsoil Composition Tests 2.2.3 G
103 32 92 19 07 Certificates Seed 2.1 G
104 32 92 19 08 Manufacturer’s Instructions Erosion Control Materials G
105 33 05 29.00 29 03 Product Data Materials 1.4.1 G
106 33 05 29.00 29 06 Test Reports Hydrostatic tests 3.14 G
107 33 05 29.00 29 06 Test Reports Disinfection 1.4.3 G
108 33 05 29.00 29 08 Manufacturer’s Instructions Manufacturer's Recommendations 1.4.2 G
Eielson Air Force Base
FTQ 18-0321
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
TITLE:
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
109 33 05 41.00 29 02 Shop Drawings Detail Drawings 1.4.1 G
110 33 05 41.00 29 03 Product Data Manufacturer's Catalog Data 1.4.2 G
111 33 05 41.00 29 10 Operation and Maintenance Data Operation and Maintenance Manuals 1.4.4 G
112 33 30 00 01 Preconstruction Submittals Existing Conditions G
113 33 30 00 02 Shop Drawings Drawings 1.4.2 G
114 33 30 00 02 Shop Drawings Metal Items G
115 33 30 00 03 Product Data Pipeline Materials 2.1 G
116 33 30 00 06 Test Reports Reports G
117 33 30 00 07 Certificates Portland Cement G
118 33 30 00 07 Certificates Gaskets G
119 33 63 13 01 Preconstruction Submittals Welder Qualifications 3.5.1 G
120 33 63 13 03 Product Data Valves 2.3 G
121 33 63 13 03 Product Data Steam traps 2.4 G
122 33 63 13 03 Product Data Alignment guides 2.5 G
123 33 63 13 03 Product Data Expansion Joints 2.7 G
124 33 63 13 03 Product Data Insulation 2.8 G
125 33 63 13 06 Test Reports Inspection and Testing Reports 3.5.2 G
126 33 63 13 10 Operation and Maintenance Data Operation And Maintenance Data 1.7 G
File details come from the government source that posted it.