JA-9_Hangar_Door_Operation_Guideline.pdf
PDF 1 MB Posted
- Attached to
- Hangar Door Repair Federal contract opportunity
- Solicitation number
- FA5004-15-R-C003
About this file
JA-9 Hangar Door Operation Guideline
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Photos.pdf | ||
| Hangar_Door_Site_Visit_Sign_in.pdf | ||
| Q__A_Hangar_Door_Project__1.pdf | ||
| B1335_LBP_Survey.pdf | ||
| FA5004-15-R-C003-0003.pdf | ||
| Second_Site_Visit_Information.pdf | ||
| FA5004-15-R-C003-0002.pdf | ||
| JA-13_Past_Performance_Questionnaire.pdf | ||
| FA5004-15-R-C003-0001.pdf | ||
| JA-2_Structural_Narrative.pdf | ||
| JA-3_Electrical_Narrative.pdf | ||
| JA-5_021203_22x34_Drawings_03-28-2014.pdf | ||
| JA-13_Past_Performance_Questionnaire.pdf | ||
| JA-10_AF_Form_3000.pdf | ||
| JA-4_021203_Specifications_03_11_2015_Updated.pdf | ||
| JA-15_Financial_Reference_Sheet.pdf | ||
| JA-12_AF_Form_3065.pdf | ||
| FA5004-15-R-C003_Hangar_Door.pdf | ||
| JA-6_Hangar_Door_Wage_Determinations.pdf | ||
| JA-1_Architectural_Narrative_3.10.15.pdf | ||
| JA-11_AF_Form_3064.pdf | ||
| JA-14_Past_Performance_Worksheet.pdf | ||
| JA-7_Environmental_Protection_Borrow_Pit_Plan.pdf | ||
| JA-8_AF66_2.10.15.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F-16 HANGAR DOOR OPERATION GUIDELINE FOR CONTRACTORS
(To Prevent Freezing Water Lines in the Hangar Bays)
Unless provisions are made to create a heated enclosure for hangar bays while hangar doors are open when ambie temperature is below 25º F the following guidelines shall be followed:
Outside Air Temperature Operational Guideline
25º F and Above No operational constraints.
10º F to 24º F Doors shall be open no longer than 15 minutes and doors shall be closed for 30 min. before reopening.
0º F to 9º F Doors shall be open no longer than 15 minutes and doors shall be closed for 40 min. before reopening.
-10º F to -1º F Doors shall be open no longer than 15 minutes and doors shall be closed for 1 hour before reopening.
Above -15º F to -11º F Doors shall be open no longer than 15 minutes and doors shall be closed for 1 1/2 hours before reopening.
-15º F Doors shall be open no longer than 15 minutes and doors shall be closed for 2 hours before reopening.
Below -15º F Doors shall be open no longer than 15 minutes and doors shall be closed for 2 hours minimum before reopening.
Temperature of smallest unprotected domestic water line in area of greatest risk shall be monitored to ensure the hangar door is being closed long enough to prevent water in pipe from becoming fully frozen* during the periods the hangar door is open.
*Note: An accurate temperature probe strapped to the exterior of the pipe and covered with a small piece of insulation will provide a good indication of the temperature of the water within the pipe. An indication that the water in a small pipe has become fully frozen is when that temperature drops below 32º F.
FA5004-15-R-C003
EIELSON AFB, ALASKA
ATTACHMENT JA-9
HANGAR DOOR OPERATION GUIDE
ent
FA5004-15-R-C003
EIELSON AFB, ALASKA
ATTACHMENT JA-9
HANGAR DOOR OPERATION GUIDE
Sheet1