Updated Bid Schedule dated 8 July 2011
Text of this file
BASE
CLIN DESCRIPTION UNIT OF ISSUE ESTIMATED QUANTITY UNIT PRICE ESTIMATED TOTAL PRICE
| LARGE QUANTITY | |||
| A001 | Exterior, non-metal surface (below 12') 500 sq. ft. or more | SF | 175,000 |
| A002 | Additional coat for item A001 | SF | 175,000 |
| A003 | Primer for item A001 | SF | 175,000 |
| A004 | Exterior, non-metal surface (below 12') 15,000 sq. ft. or more | SF | 100,000 |
| A005 | Additional coat for item A004 | SF | 200,000 |
| A006 | Primer for item A004 | SF | 100,000 |
| A007 | Exterior, non-metal surface (12' and higher) 500 sq. ft. or more | SF | 175000 |
| A008 | Additional coat for item A007 | SF | 175000 |
| A009 | Primer for item A007 | SF | 175000 |
| A010 | Exterior, non-metal surface (12' and higher) 15,000 sq. ft. or more | SF | 100,000 |
| A011 | Additional coat for item A010 | SF | 200,000 |
| A012 | Primer for item A010 | SF | 100,000 |
| A013 | Exterior, metal surface (below 12') 500 sq. ft. or more | SF | 175,000 |
| A014 | Additional coat for item A013 | SF | 175,000 |
| A015 | Primer for item A013 | SF | 175,000 |
| A016 | Exterior, metal surface (12' and higher) 500 sq. ft. or more | SF | 175000 |
| A017 | Additional coat for item A016 | SF | 175000 |
| A018 | Primer for item A016 | SF | 175000 |
| A019 | Interior, non-metal surface (below 8') 500 sq. ft. or more | SF | 250,000 |
| A020 | Additional coat for item A019 | SF | 250,000 |
| A021 | Primer for item A019 | SF | 250,000 |
| A022 | Interior, non-metal surface (8'-15') 500 sq. ft. or more | SF | 250,000 |
| A023 | Additional coat for item A022 | SF | 250,000 |
| A024 | Primer for item A022 | SF | 250,000 |
| A025 | Interior, non-metal surface (15' and higher) 500 sq. ft. or more | SF | 250,000 |
| A026 | Additional coat for item A025 | SF | 250,000 |
| A027 | Primer for item A025 | SF | 250,000 |
Page 1 Subtotal
| SMALL QUANTITY (500 sq. ft. or less) | |||
| A028 | Exterior, non-metal surface | SF | 100,000 |
| A029 | Additional coat for item A028 | SF | 100,000 |
| A030 | Primer for item A028 | SF | 100,000 |
| A031 | Exterior, metal surface | SF | 100,000 |
| A032 | Additional coat for item A031 | SF | 100,000 |
| A033 | Primer for item A031 | SF | 100,000 |
| A034 | Interior, non-metal surface | SF | 100,000 |
| A035 | Additional coat for item A034 | SF | 100,000 |
| A036 | Primer for item A034 | SF | 100,000 |
| MISCELLANEOUS | |||
| A037 | Paint existing or new doors | EA | 600 |
| A038 | Paint existing or new door frames and jambs | EA | 1,800 |
| A039 | Gypsum board removal and replacement | SF | 1,000 |
| A040 | Mud and tape | SF | 10,000 |
| A041 | Texture walls | SF | 125,000 |
| A042 | Labor hour rate | HR | 500 |
| A043 | Trim | LF | 200,000 |
| A044 | Stain or varnish application | SF | 300 |
| A045 | Airfield painting | SF | 250,000 |
| A046 | Street painting | SF | 40,000 |
| A047 | Paint removal, pavement | SF | 5,000 |
| A048 | Lead paint abatement | SF | 10,000 |
| A049 | Lead paint handling | SF | 10,000 |
| A050 | Paint removal, floors | SF | 5,000 |
| A051 | Paint removal, epoxy and chemical resistant surface | SF | 5,000 |
| A052 | Epoxy floor paint | SF | 7,000 |
| A053 | Chemical resistant floor paint | SF | 7,000 |
| A054 | Polyurea floor paint | SF | 10,000 |
| A055 | Paint railing for stairs and walkways | SF | 630 |
| A056 | Additional coat for item A055 | SF | 630 |
| A057 | Log high gloss seal | SF | 25,000 |
| A058 | Additional coat for item A057 | SF | 5,000 |
| A059 | Paint fire hydrants | EA | 10 |
Page 1 Subtotal
Grand Total
&"Times New Roman,Bold"&10Page &P of &N CLIN 0001, Base Period &"Times New Roman,Bold"&10Solicitation Number FA5004-11-B-D001 Exhibit JA-1, Bid Schedule Paint IDIQ, Eielson AFB, AK
OPTION YR 1
CLIN DESCRIPTION UNIT OF ISSUE ESTIMATED QUANTITY UNIT PRICE ESTIMATED TOTAL PRICE
| LARGE QUANTITY | |||
| B001 | Exterior, non-metal surface (below 12') 500 sq. ft. or more | SF | 175,000 |
| B002 | Additional coat for item B001 | SF | 175,000 |
| B003 | Primer for item B001 | SF | 175,000 |
| B004 | Exterior, non-metal surface (below 12') 15,000 sq. ft. or more | SF | 100,000 |
| B005 | Additional coat for item B004 | SF | 200,000 |
| B006 | Primer for item B004 | SF | 100,000 |
| B007 | Exterior, non-metal surface (12' and higher) 500 sq. ft. or more | SF | 175000 |
| B008 | Additional coat for item B007 | SF | 175000 |
| B009 | Primer for item B007 | SF | 175000 |
| B010 | Exterior, non-metal surface (12' and higher) 15,000 sq. ft. or more | SF | 100,000 |
| B011 | Additional coat for item B010 | SF | 200,000 |
| B012 | Primer for item B010 | SF | 100,000 |
| B013 | Exterior, metal surface (below 12') 500 sq. ft. or more | SF | 175,000 |
| B014 | Additional coat for item B013 | SF | 175,000 |
| B015 | Primer for item B013 | SF | 175,000 |
| B016 | Exterior, metal surface (12' and higher) 500 sq. ft. or more | SF | 175000 |
| B017 | Additional coat for item B016 | SF | 175000 |
| B018 | Primer for item B016 | SF | 175000 |
| B019 | Interior, non-metal surface (below 8') 500 sq. ft. or more | SF | 250,000 |
| B020 | Additional coat for item B019 | SF | 250,000 |
| B021 | Primer for item B019 | SF | 250,000 |
| B022 | Interior, non-metal surface (8'-15') 500 sq. ft. or more | SF | 250,000 |
| B023 | Additional coat for item B022 | SF | 250,000 |
| B024 | Primer for item B022 | SF | 250,000 |
| B025 | Interior, non-metal surface (15' and higher) 500 sq. ft. or more | SF | 250,000 |
| B026 | Additional coat for item B025 | SF | 250,000 |
| B027 | Primer for item B025 | SF | 250,000 |
Page 1 Subtotal
| SMALL QUANTITY (500 sq. ft. or less) | |||
| B028 | Exterior, non-metal surface | SF | 100,000 |
| B029 | Additional coat for item B028 | SF | 100,000 |
| B030 | Primer for item B028 | SF | 100,000 |
| B031 | Exterior, metal surface | SF | 100,000 |
| B032 | Additional coat for item B031 | SF | 100,000 |
| B033 | Primer for item B031 | SF | 100,000 |
| B034 | Interior, non-metal surface | SF | 100,000 |
| B035 | Additional coat for item B034 | SF | 100,000 |
| B036 | Primer for item B034 | SF | 100,000 |
| MISCELLANEOUS | |||
| B037 | Paint existing or new doors | EA | 600 |
| B038 | Paint existing or new door frames and jambs | EA | 1,800 |
| B039 | Gypsum board removal and replacement | SF | 1,000 |
| B040 | Mud and tape | SF | 10,000 |
| B041 | Texture walls | SF | 125,000 |
| B042 | Labor hour rate | HR | 500 |
| B043 | Trim | LF | 200,000 |
| B044 | Stain or varnish application | SF | 300 |
| B045 | Airfield painting | SF | 250,000 |
| B046 | Street painting | SF | 40,000 |
| B047 | Paint removal, pavement | SF | 5,000 |
| B048 | Lead paint abatement | SF | 10,000 |
| B049 | Lead paint handling | SF | 10,000 |
| B050 | Paint removal, floors | SF | 5,000 |
| B051 | Paint removal, epoxy and chemical resistant surface | SF | 5,000 |
| B052 | Epoxy floor paint | SF | 7,000 |
| B053 | Chemical resistant floor paint | SF | 7,000 |
| B054 | Polyurea floor paint | SF | 10,000 |
| B055 | Paint railing for stairs and walkways | SF | 630 |
| B056 | Additional coat for item B055 | SF | 630 |
| B057 | Log high gloss seal | SF | 25,000 |
| B058 | Additional coat for item B057 | SF | 5,000 |
| B059 | Paint fire hydrants | EA | 10 |
Page 1 Subtotal
Grand Total
&"Times New Roman,Bold"&10Page &P of &N CLIN 1001, OPTION YEAR 1 &"Times New Roman,Bold"&10Solicitation Number FA5004-11-B-D001
OPTION YR 2
CLIN DESCRIPTION UNIT OF ISSUE ESTIMATED QUANTITY UNIT PRICE ESTIMATED TOTAL PRICE
| LARGE QUANTITY | |||
| C001 | Exterior, non-metal surface (below 12') 500 sq. ft. or more | SF | 175,000 |
| C002 | Additional coat for item C001 | SF | 175,000 |
| C003 | Primer for item C001 | SF | 175,000 |
| C004 | Exterior, non-metal surface (below 12') 15,000 sq. ft. or more | SF | 100,000 |
| C005 | Additional coat for item C004 | SF | 200,000 |
| C006 | Primer for item C004 | SF | 100,000 |
| C007 | Exterior, non-metal surface (12' and higher) 500 sq. ft. or more | SF | 175000 |
| C008 | Additional coat for item C007 | SF | 175000 |
| C009 | Primer for item C007 | SF | 175000 |
| C010 | Exterior, non-metal surface (12' and higher) 15,000 sq. ft. or more | SF | 100,000 |
| C011 | Additional coat for item C010 | SF | 200,000 |
| C012 | Primer for item C010 | SF | 100,000 |
| C013 | Exterior, metal surface (below 12') 500 sq. ft. or more | SF | 175,000 |
| C014 | Additional coat for item C013 | SF | 175,000 |
| C015 | Primer for item C013 | SF | 175,000 |
| C016 | Exterior, metal surface (12' and higher) 500 sq. ft. or more | SF | 175000 |
| C017 | Additional coat for item C016 | SF | 175000 |
| C018 | Primer for item C016 | SF | 175000 |
| C019 | Interior, non-metal surface (below 8') 500 sq. ft. or more | SF | 250,000 |
| C020 | Additional coat for item C019 | SF | 250,000 |
| C021 | Primer for item C019 | SF | 250,000 |
| C022 | Interior, non-metal surface (8'-15') 500 sq. ft. or more | SF | 250,000 |
| C023 | Additional coat for item C022 | SF | 250,000 |
| C024 | Primer for item C022 | SF | 250,000 |
| C025 | Interior, non-metal surface (15' and higher) 500 sq. ft. or more | SF | 250,000 |
| C026 | Additional coat for item C025 | SF | 250,000 |
| C027 | Primer for item C025 | SF | 250,000 |
Page 1 Subtotal
| SMALL QUANTITY (500 sq. ft. or less) | |||
| C028 | Exterior, non-metal surface | SF | 100,000 |
| C029 | Additional coat for item C028 | SF | 100,000 |
| C030 | Primer for item C028 | SF | 100,000 |
| C031 | Exterior, metal surface | SF | 100,000 |
| C032 | Additional coat for item C031 | SF | 100,000 |
| C033 | Primer for item C031 | SF | 100,000 |
| C034 | Interior, non-metal surface | SF | 100,000 |
| C035 | Additional coat for item C034 | SF | 100,000 |
| C036 | Primer for item C034 | SF | 100,000 |
| MISCELLANEOUS | |||
| C037 | Paint existing or new doors | EA | 600 |
| C038 | Paint existing or new door frames and jambs | EA | 1,800 |
| C039 | Gypsum board removal and replacement | SF | 1,000 |
| C040 | Mud and tape | SF | 10,000 |
| C041 | Texture walls | SF | 125,000 |
| C042 | Labor hour rate | HR | 500 |
| C043 | Trim | LF | 200,000 |
| C044 | Stain or varnish application | SF | 300 |
| C045 | Airfield painting | SF | 250,000 |
| C046 | Street painting | SF | 40,000 |
| C047 | Paint removal, pavement | SF | 5,000 |
| C048 | Lead paint abatement | SF | 10,000 |
| C049 | Lead paint handling | SF | 10,000 |
| C050 | Paint removal, floors | SF | 5,000 |
| C051 | Paint removal, epoxy and chemical resistant surface | SF | 5,000 |
| C052 | Epoxy floor paint | SF | 7,000 |
| C053 | Chemical resistant floor paint | SF | 7,000 |
| C054 | Polyurea floor paint | SF | 10,000 |
| C055 | Paint railing for stairs and walkways | SF | 630 |
| C056 | Additional coat for item C055 | SF | 630 |
| C057 | Log high gloss seal | SF | 25,000 |
| C058 | Additional coat for item C057 | SF | 5,000 |
| C059 | Paint fire hydrants | EA | 10 |
Page 1 Subtotal
Grand Total
&"Times New Roman,Bold"&10Page &P of &N CLIN 2001, OPTION YEAR 2 &"Times New Roman,Bold"&10Solicitation Number FA5004-11-B-D001
OPTION YR 3
CLIN DESCRIPTION UNIT OF ISSUE ESTIMATED QUANTITY UNIT PRICE ESTIMATED TOTAL PRICE
| LARGE QUANTITY | |||
| D001 | Exterior, non-metal surface (below 12') 500 sq. ft. or more | SF | 175,000 |
| D002 | Additional coat for item D001 | SF | 175,000 |
| D003 | Primer for item D001 | SF | 175,000 |
| D004 | Exterior, non-metal surface (below 12') 15,000 sq. ft. or more | SF | 100,000 |
| D005 | Additional coat for item D004 | SF | 200,000 |
| D006 | Primer for item D004 | SF | 100,000 |
| D007 | Exterior, non-metal surface (12' and higher) 500 sq. ft. or more | SF | 175000 |
| D008 | Additional coat for item D007 | SF | 175000 |
| D009 | Primer for item D007 | SF | 175000 |
| D010 | Exterior, non-metal surface (12' and higher) 15,000 sq. ft. or more | SF | 100,000 |
| D011 | Additional coat for item D010 | SF | 200,000 |
| D012 | Primer for item D010 | SF | 100,000 |
| D013 | Exterior, metal surface (below 12') 500 sq. ft. or more | SF | 175,000 |
| D014 | Additional coat for item D013 | SF | 175,000 |
| D015 | Primer for item D013 | SF | 175,000 |
| D016 | Exterior, metal surface (12' and higher) 500 sq. ft. or more | SF | 175000 |
| D017 | Additional coat for item D016 | SF | 175000 |
| D018 | Primer for item D016 | SF | 175000 |
| D019 | Interior, non-metal surface (below 8') 500 sq. ft. or more | SF | 250,000 |
| D020 | Additional coat for item D019 | SF | 250,000 |
| D021 | Primer for item D019 | SF | 250,000 |
| D022 | Interior, non-metal surface (8'-15') 500 sq. ft. or more | SF | 250,000 |
| D023 | Additional coat for item D022 | SF | 250,000 |
| D024 | Primer for item D022 | SF | 250,000 |
| D025 | Interior, non-metal surface (15' and higher) 500 sq. ft. or more | SF | 250,000 |
| D026 | Additional coat for item D025 | SF | 250,000 |
| D027 | Primer for item D025 | SF | 250,000 |
Subtotal Page 1
| SMALL QUANTITY (500 sq. ft. or less) | |||
| D028 | Exterior, non-metal surface | SF | 100,000 |
| D029 | Additional coat for item D028 | SF | 100,000 |
| D030 | Primer for item D028 | SF | 100,000 |
| D031 | Exterior, metal surface | SF | 100,000 |
| D032 | Additional coat for item D031 | SF | 100,000 |
| D033 | Primer for item D031 | SF | 100,000 |
| D034 | Interior, non-metal surface | SF | 100,000 |
| D035 | Additional coat for item D034 | SF | 100,000 |
| D036 | Primer for item D034 | SF | 100,000 |
| MISCELLANEOUS | |||
| D037 | Paint existing or new doors | EA | 600 |
| D038 | Paint existing or new door frames and jambs | EA | 1,800 |
| D039 | Gypsum board removal and replacement | SF | 1,000 |
| D040 | Mud and tape | SF | 10,000 |
| D041 | Texture walls | SF | 125,000 |
| D042 | Labor hour rate | HR | 500 |
| D043 | Trim | LF | 200,000 |
| D044 | Stain or varnish application | SF | 300 |
| D045 | Airfield painting | SF | 250,000 |
| D046 | Street painting | SF | 40,000 |
| D047 | Paint removal, pavement | SF | 5,000 |
| D048 | Lead paint abatement | SF | 10,000 |
| D049 | Lead paint handling | SF | 10,000 |
| D050 | Paint removal, floors | SF | 5,000 |
| D051 | Paint removal, epoxy and chemical resistant surface | SF | 5,000 |
| D052 | Epoxy floor paint | SF | 7,000 |
| D053 | Chemical resistant floor paint | SF | 7,000 |
| D054 | Polyurea floor paint | SF | 10,000 |
| D055 | Paint railing for stairs and walkways | SF | 630 |
| D056 | Additional coat for item D055 | SF | 630 |
| D057 | Log high gloss seal | SF | 25,000 |
| D058 | Additional coat for item D057 | SF | 5,000 |
| D059 | Paint fire hydrants | EA | 10 |
Page 1 Subtotal
Grand Total
&"Times New Roman,Bold"&10Page &P of &N CLIN 3001, OPTION YEAR 3 &"Times New Roman,Bold"&10Solicitation Number FA5004-11-B-D001
OPTION YR 4
CLIN DESCRIPTION UNIT OF ISSUE ESTIMATED QUANTITY UNIT PRICE ESTIMATED TOTAL PRICE
| LARGE QUANTITY | |||
| E001 | Exterior, non-metal surface (below 12') 500 sq. ft. or more | SF | 175,000 |
| E002 | Additional coat for item E001 | SF | 175,000 |
| E003 | Primer for item E001 | SF | 175,000 |
| E004 | Exterior, non-metal surface (below 12') 15,000 sq. ft. or more | SF | 100,000 |
| E005 | Additional coat for item E004 | SF | 200,000 |
| E006 | Primer for item E004 | SF | 100,000 |
| E007 | Exterior, non-metal surface (12' and higher) 500 sq. ft. or more | SF | 175000 |
| E008 | Additional coat for item E007 | SF | 175000 |
| E009 | Primer for item E007 | SF | 175000 |
| E010 | Exterior, non-metal surface (12' and higher) 15,000 sq. ft. or more | SF | 100,000 |
| E011 | Additional coat for item E010 | SF | 200,000 |
| E012 | Primer for item E010 | SF | 100,000 |
| E013 | Exterior, metal surface (below 12') 500 sq. ft. or more | SF | 175,000 |
| E014 | Additional coat for item E013 | SF | 175,000 |
| E015 | Primer for item E013 | SF | 175,000 |
| E016 | Exterior, metal surface (12' and higher) 500 sq. ft. or more | SF | 175000 |
| E017 | Additional coat for item E016 | SF | 175000 |
| E018 | Primer for item E016 | SF | 175000 |
| E019 | Interior, non-metal surface (below 8') 500 sq. ft. or more | SF | 250,000 |
| E020 | Additional coat for item E019 | SF | 250,000 |
| E021 | Primer for item E019 | SF | 250,000 |
| E022 | Interior, non-metal surface (8'-15') 500 sq. ft. or more | SF | 250,000 |
| E023 | Additional coat for item E022 | SF | 250,000 |
| E024 | Primer for item E022 | SF | 250,000 |
| E025 | Interior, non-metal surface (15' and higher) 500 sq. ft. or more | SF | 250,000 |
| E026 | Additional coat for item E025 | SF | 250,000 |
| E027 | Primer for item E025 | SF | 250,000 |
Subtotal Page 1
| SMALL QUANTITY (500 sq. ft. or less) | |||
| E028 | Exterior, non-metal surface | SF | 100,000 |
| E029 | Additional coat for item E028 | SF | 100,000 |
| E030 | Primer for item E028 | SF | 100,000 |
| E031 | Exterior, metal surface | SF | 100,000 |
| E032 | Additional coat for item E031 | SF | 100,000 |
| E033 | Primer for item E031 | SF | 100,000 |
| E034 | Interior, non-metal surface | SF | 100,000 |
| E035 | Additional coat for item E034 | SF | 100,000 |
| E036 | Primer for item E034 | SF | 100,000 |
| MISCELLANEOUS | |||
| E037 | Paint existing or new doors | EA | 600 |
| E038 | Paint existing or new door frames and jambs | EA | 1,800 |
| E039 | Gypsum board removal and replacement | SF | 1,000 |
| E040 | Mud and tape | SF | 10,000 |
| E041 | Texture walls | SF | 125,000 |
| E042 | Labor hour rate | HR | 500 |
| E043 | Trim | LF | 200,000 |
| E044 | Stain or varnish application | SF | 300 |
| E045 | Airfield painting | SF | 250,000 |
| E046 | Street painting | SF | 40,000 |
| E047 | Paint removal, pavement | SF | 5,000 |
| E048 | Lead paint abatement | SF | 10,000 |
| E049 | Lead paint handling | SF | 10,000 |
| E050 | Paint removal, floors | SF | 5,000 |
| E051 | Paint removal, epoxy and chemical resistant surface | SF | 5,000 |
| E052 | Epoxy floor paint | SF | 7,000 |
| E053 | Chemical resistant floor paint | SF | 7,000 |
| E054 | Polyurea floor paint | SF | 10,000 |
| E055 | Paint railing for stairs and walkways | SF | 630 |
| E056 | Additional coat for item E055 | SF | 630 |
| E057 | Log high gloss seal | SF | 25,000 |
| E058 | Additional coat for item E057 | SF | 5,000 |
| E059 | Paint fire hydrants | EA | 10 |
Page 1 Subtotal
Grand Total
&"Times New Roman,Bold"&10Page &P of &N CLIN 4001, OPTION YEAR 4 &"Times New Roman,Bold"&10Solicitation Number FA5004-11-B-D001
Other files
| File | Type | Posted |
|---|---|---|
| FBO Bid Results Ltr.pdf | ||
| Amendment 0005.pdf | ||
| QUESTIONS AND RESPONSES 002.pdf | ||
| Amendment 4.pdf | ||
| Amendment 0003.pdf | ||
| Wage Determination AK100001 3 Jun 11.pdf | ||
| QUESTIONS AND RESPONSES 001.pdf | ||
| Site Visit Sign In.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 1.pdf | ||
| JA-1 Bid Schedule.xlsx | XLSX spreadsheet | |
| JA-2 Statement of Work.docx | DOCX document | |
| FA5004-11-B-D001 Painting IDIQ Solicitation.pdf | ||
| JA-5 Financial Reference Sheet.doc | DOC document | |
| JA-3 Haz Mat Identification.doc | DOC document | |
| JA-4 DB Wage Det Heavy | — |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .