FA5004-11-B-D001 Painting IDIQ Solicitation.pdf
PDF 438 KB Posted
- Attached to
- Paint IDIQ
- Solicitation number
- FA5004-11-B-D001
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FBO Bid Results Ltr.pdf | ||
| Amendment 0005.pdf | ||
| QUESTIONS AND RESPONSES 002.pdf | ||
| JA-1 Bid Schedule | — | |
| Amendment 4.pdf | ||
| Amendment 0003.pdf | ||
| Wage Determination AK100001 3 Jun 11.pdf | ||
| QUESTIONS AND RESPONSES 001.pdf | ||
| Site Visit Sign In.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 1.pdf | ||
| JA-1 Bid Schedule.xlsx | XLSX spreadsheet | |
| JA-2 Statement of Work.docx | DOCX document | |
| JA-5 Financial Reference Sheet.doc | DOC document | |
| JA-3 Haz Mat Identification.doc | DOC document | |
| JA-4 DB Wage Det Heavy | — |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 12 Jul 2011
X
A X B X C
D E X
X
G F 46 - 52
53 - 55 X H 56 alfred.barrie@eielson.af.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 56
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE 15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
FA5004 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
Building 2258 Contracting Off.
conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
ALFRED BARRIE 907-377-7061
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 13
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
14 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
16 - 17
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 18 - 22 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 23 - 28 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL: TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
29 - 44
PART II - CONTRACT CLAUSES
354 CONTRACTING SQUADRON ISSUING OFFICE
2310 CENTRAL AVE, BLDG 2258
LGCA - CONSTRUCTION
EIELSON AFB AK 99702-1801 907-377-5444
907-377-2547 FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO. 5. DATE ISSUED
10 Jun 2011
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
FA5004-11-B-D001
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 UNDEFINED Dollars, U.S.
Painting IDIQ - Base Period
FFP
The contractor shall provide all personnel, equipment, tools, materials, storage, supervision, transportation, and other items necessary to perform Painting
Services at Eielson AFB, Alaska in accordance with the attached specifications.
This is an indefinite delivery, indefinite quantity (IDIQ) contract. At any time during the contract period, except during a winter exclusion period, a task order can be unilaterally issued to the Contractor to perform painting services on Eielson
AFB. The cost of each task order will be determined by selecting work items that are pre-priced on the bid schedule. The bid schedule is identified and attached to the contract as Attachment JA-1. Bid schedule items for the Base Period are inclusive of Items A001 through A059 within Attachment JA-1. The performance period for this Base Period shall be from 1 July 2011 through 31 March 2012 or 9 months from the date of award.
FOB: Destination
NSN: Z299-CO-NST-RUCT
SIGNAL CODE: A
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 50 Each Planning Task Orders
FFP
The Contractor shall provide Planning Task Orders (PTO) in accordance with
Paragraph G-6 - Planning Task Orders. Enter proposed price for providing
Planning Task Orders (PTO) for the Base Period on this CLIN.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1001 UNDEFINED Dollars, OPTION Painting IDIQ - Option Year 1
The contractor shall provide all personnel, equipment, tools, materials, storage, supervision, transportation, and other items necessary to perform Painting
Services at Eielson AFB, Alaska in accordance with the attached specifications.
This is an indefinite delivery, indefinite quantity (IDIQ) contract. At any time during the contract period, except during a winter exclusion period, a task order can be unilaterally issued to the Contractor to perform painting services on Eielson
AFB. The cost of each task order will be determined by selecting work items that are pre-priced on the bid schedule. The bid schedule is identified and attached to the contract as Attachment JA-1. Bid schedule items for Option Year 1 are inclusive of Items B001 through B059 within Attachment JA-1. The performance period for Option Year 1 shall be from 1 April 2012 through 31 March 2013.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
1002 50 Each OPTION Planning Task Orders
FFP
The Contractor shall provide Planning Task Orders (PTO) in accordance with
Paragraph G-6 - Planning Task Orders. Enter proposed price for providing
Planning Task Orders (PTO) for the Base Period on this CLIN.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2001 UNDEFINED Dollars, OPTION Painting IDIQ - Option Year 2
The contractor shall provide all personnel, equipment, tools, materials, storage, supervision, transportation, and other items necessary to perform Painting
Services at Eielson AFB, Alaska in accordance with the attached specifications.
This is an indefinite delivery, indefinite quantity (IDIQ) contract. At any time during the contract period, except during a winter exclusion period, a task order can be unilaterally issued to the Contractor to perform painting services on Eielson
AFB. The cost of each task order will be determined by selecting work items that are pre-priced on the bid schedule. The bid schedule is identified and attached to the contract as Attachment JA-1. Bid schedule items for Option Year 2 are inclusive of Items C001 through C059 within Attachment JA-1. The performance period for Option Year 2 shall be from 1 April 2013 through 31 March 2014.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
2002 50 Each OPTION Planning Task Orders
FFP
The Contractor shall provide Planning Task Orders (PTO) in accordance with
Paragraph G-6 - Planning Task Orders. Enter proposed price for providing
Planning Task Orders (PTO) for the Base Period on this CLIN.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3001 UNDEFINED Dollars, OPTION Painting IDIQ - Option Year 3
The contractor shall provide all personnel, equipment, tools, materials, storage, supervision, transportation, and other items necessary to perform Painting
Services at Eielson AFB, Alaska in accordance with the attached specifications.
This is an indefinite delivery, indefinite quantity (IDIQ) contract. At any time during the contract period, except during a winter exclusion period, a task order can be unilaterally issued to the Contractor to perform painting services on Eielson
AFB. The cost of each task order will be determined by selecting work items that are pre-priced on the bid schedule. The bid schedule is identified and attached to the contract as Attachment JA-1. Bid schedule items for Option Year 3 are inclusive of Items D001 through D059 within Attachment JA-1. The performance period for Option Year 3 shall be from 1 April 2014 through 31 March 2015.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
3002 50 Each OPTION Planning Task Orders
FFP
The Contractor shall provide Planning Task Orders (PTO) in accordance with
Paragraph G-6 - Planning Task Orders. Enter proposed price for providing
Planning Task Orders (PTO) for the Base Period on this CLIN.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4001 UNDEFINED Dollars, OPTION Painting IDIQ - Option Year 4
The contractor shall provide all personnel, equipment, tools, materials, storage, supervision, transportation, and other items necessary to perform Painting
Services at Eielson AFB, Alaska in accordance with the attached specifications.
This is an indefinite delivery, indefinite quantity (IDIQ) contract. At any time during the contract period, except during a winter exclusion period, a task order can be unilaterally issued to the Contractor to perform painting services on Eielson
AFB. The cost of each task order will be determined by selecting work items that are pre-priced on the bid schedule. The bid schedule is identified and attached to the contract as Attachment JA-1. Bid schedule items for Option Year 4 are inclusive of Items E001 through E059 within Attachment JA-1. The performance period for Option Year 4 shall be from 1 April 2015 through 31 March 2016.
FOB: Destination
UNIT UNIT PRICE MAX AMOUNT
4002 50 Each OPTION Planning Task Orders
FFP
The Contractor shall provide Planning Task Orders (PTO) in accordance with
Paragraph G-6 - Planning Task Orders. Enter proposed price for providing
Planning Task Orders (PTO) for the Base Period on this CLIN.
FOB: Destination
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$1.00 $1,500,000.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$1.00
$1,500,000.00
CLAUSES INCORPORATED BY FULL TEXT
CLAUSES AND PROVISIONS
(a) Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
(b) Clauses and provisions in this document will be numbered in sequence, but will not necessarily appear in consecutive order.
(c) Sections K, L and M will be physically removed from any resultant award, but will be deemed to be incorporated, by reference, in that award.
Section C - Descriptions and Specifications
DESCRIPTION AND SPECIFICATIONS
C 1. STATEMENT OF WORK
The Contractor shall perform the services set forth in Section B in accordance with the contract Statement of Work listed in Section J, and other terms and conditions of this contract as stated in individual task order and planning task order statement of word.
End of Section C
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
1001 Destination Government Destination Government
1002 Destination Government Destination Government
2001 Destination Government Destination Government
2002 Destination Government Destination Government
3001 Destination Government Destination Government
3002 Destination Government Destination Government
4001 Destination Government Destination Government
4002 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction AUG 1996
Section F - Deliveries or Performance
CONTRACT PERIOD
The contract provides a Basic Period and four (4) one-year option periods. The contract periods under this contract are as follows:
Basic Contract: 9 months from the date of award
Option Year One (1): 12 months from the completion date of Basic Contract Period (IF EXERCISED)
Option Year Two (2): 12 months from the completion date of Option Year One (IF EXERCISED)
Option Year Three (3): 12 months from the completion date of Option Year Two (IF EXERCISED)
Option Year Four (4): 12 months from the completion date of Option Year Three (IF EXERCISED)
PERFORMANCE TIME FOR EACH TASK ORDER
The performance period shall be stated on each task order.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 POP 01-JUL-2011 TO
31-MAR-2012
354 CES/CEOE - F1U3CE
A1C JAMES RICH
2310 CENTRAL AVE SUITE 4
EIELSON AFB AK 99702
907-377-2595
FOB: Destination
F1U3CE
0002 POP 01-JUL-2011 TO
31-MAR-2012
50 (SAME AS PREVIOUS LOCATION)
1001 POP 01-APR-2012 TO
31-MAR-2013
(SAME AS PREVIOUS LOCATION)
1002 POP 01-APR-2012 TO
31-MAR-2013
50 (SAME AS PREVIOUS LOCATION)
2001 POP 01-APR-2013 TO
31-MAR-2014
(SAME AS PREVIOUS LOCATION)
2002 POP 01-APR-2013 TO
31-MAR-2014
50 (SAME AS PREVIOUS LOCATION)
3001 POP 01-APR-2014 TO
31-MAR-2015
(SAME AS PREVIOUS LOCATION)
3002 POP 01-APR-2014 TO
31-MAR-2015
50 (SAME AS PREVIOUS LOCATION)
4001 POP 01-APR-2015 TO
31-MAR-2016
(SAME AS PREVIOUS LOCATION)
4002 POP 01-APR-2015 TO
31-MAR-2016
50 (SAME AS PREVIOUS LOCATION)
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 days after the date the
Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the date identified in the task order. The time stated for completion shall include final cleanup of the premises.
(End of clause)
Section G - Contract Administration Data
FUNDING INFORMATION
G-1 CONTRACT ADMINISTRATION
a. Following award, this contract will be administered by the 354th Contracting Squadron. The name, address, telephone number, and fax number of the Contracting Officer is:
Michael A. Lelevier
354 CONS Phone: (907) 377-4183
2310 Central Ave. Fax: (907) 377-4647
Eielson AFB, AK 99702 michael.lelevier@eielson.af.mil
b. The Contracting Officer is the only person authorized to approve changes or modify any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract, the authority remains solely with the Contracting Officer. In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in cost incurred as a result thereof.
c. Contractual problems, of any nature, which might occur during the life of the contract must be handled in accordance with very specific public laws and regulations (e.g. Federal Acquisition Regulation), and must be referred to the Contracting Officer for resolution. Only the Contracting Officer is authorized to formally resolve such problems. Therefore, the Contractor is directed to submit all such contractual problems to the immediate attention of the Contracting Officer.
d. Any request for contract changes/modifications shall be submitted to the Contracting Officer.
e. All correspondence concerning this contract, such as requests for information, explanation of terms, and contract interpretations, shall be submitted to the Contracting Officer.
G-2 DESIGNATION OF TECHNICAL REPRESENTATIVE
The Eielson AFB Civil Engineer, or his authorized representative, as Project Manager (PM) for the purpose of technical surveillance of workmanship and inspection of materials for work being performed under this contract, this will be provided to the contractor in writing at the time of award. This clause in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in terms of the contract.
G-3 POST-AWARD/PRE-PERFORMANCE CONFERENCE
A pre-performance conference in accordance with FAR Clause 52.236-26, ―Pre-construction Conference,‖ in Section
I shall be scheduled by and held at the office issuing this solicitation prior to the commencement of any work under the contract which will be awarded as a result of this solicitation and offer. The Contractor or his duly authorized representative shall be required to attend the pre-performance conference.
G-4 ELECTRONIC INVOICING, SUPPLEMENTAL INFORMATION – CONSTRUCTION
a. IAW DFARS 252.232-7003, Electronic Submission of Payment Requests, Eielson AFB is set up to receive electronic invoices through Wide Area Work Flow (WAWF). WAWF significantly accelerates all aspects of the invoicing process by removing the need for paper copy transmission of documents (i.e., faxes or postal service). In addition, Contractors using WAWF will be able to check on the status of submitted invoices by simply logging into the WAWF website.
b. Electronic submission of invoices is required unless an exception at DFARS 232.7002 is met. Any request to submit a non-electronic invoice IAW DFARS 232.7002(6)(i) must be submitted in writing to the Contracting Officer and shall state why the Contractor is unable to submit an electronic invoice.
c. Contractors may self register with WAWF by logging onto the website: https://wawf.eb.mil/.
d. During the Preconstruction Conference (PRECON), additional information on invoicing via WAWF will be provided during this meeting.
e. Before invoicing in WAWF, the Contractor must submit an AF Form 3065 for government review and approval.
The government will review and return the AF Form 3065 as either approved or disapproved. The Contractor may submit an invoice only after receiving approval on the AF Form 3065. Any invoice submitted prior to government approval of the AF Form 3065 will be immediately disapproved.
f. Use the information below when submitting an invoice in WAWF
Invoice Type: Construction Invoice
Admin DoDAAC: FA5004
Contracting Officer: F1U3TR
Paying Official DoDAAC: F67100
The use of extensions is not necessary and may result in delays and/or rejection of invoices.
g. WAWF will allow attachments to be included with each invoice. Include the following attachments with each invoice:
1. Approved AF Form 3065 (Progress Report)
2. Company invoice with the following information included:
a. Total amount of contract
b. Added amounts as a result of any modifications
c. Previous payments made
d. Amount of invoice
G-5 ORDERING PROCEDURES
All Task Orders placed against this contract will be issued by the contract administration office identified in this contract. Once a project has been identified, a request for proposal will be requested from the Contractor. The
Contractor shall have a maximum of 5 calendar days to provide a proposal. The Contractor’s proposal shall include a price breakdown by Item number in the Bid Schedule, and any other documentation necessary to evaluate the proposal. It is the Contractor’s responsibility to verify all conditions prior to submitting a proposal. Also, it is the
Contractor’s responsibility to acknowledge that the necessary steps taken to reasonably ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost. Upon review of the proposal by the Government, negotiations may occur, or the
Government may accept the proposal without negotiations. The Contractors proposed period of performance time for projects are subject to negotiation by the Government. After negotiations are complete, or the proposal has been accepted, a Task Order will be issued to the Contractor.
G-6 PAYMENTS
PLANNING TASK ORDERS
a. The Government may issue a Planning Task Order (PTO) for all projects which are awaiting funding decisions.
Issuance of a PTO for proposal preparation does not obligate the Government to issue a Task Order (TO) to construct the work described in the resulting negotiated proposal.
Following are the steps involved in a PTO:
b. CE submits request for proposal (RFP) and funding for the PTO to Contracting.
c. Contracting Officer (CO) issues a PTO to the Contractor, which will include a Statement of Work and any other documents necessary for the Contractor to prepare the proposal.
d. Contractor requests a site visit (if necessary).
e. Contractor shall have 5 calendar days, or otherwise designated by the Contracting Officer, to submit their proposal to the Contracting Officer.
f. The contractor’s proposal shall include a price breakdown by Item number in the Bid Schedule, any assumptions the contractor has made regarding the project, drawings and any other documentation necessary to evaluate the proposal. It is the contractor’s responsibility to verify all conditions prior to submitting a proposal. Also, it is the contractor’s responsibility to acknowledge they have taken the necessary steps to reasonably ascertain the nature and location of the work, and they have investigated and satisfied themselves as to the general and local conditions which can affect the work or its cost.
g. Government reviews proposal and schedules negotiations (as required).
h. Government approves final negotiated proposal.
i. Prior to invoicing, the contractor shall submit a Progress Report (AF Form 3065) indicating 100% progress to meet receiving report requirements. (No AF Form 3064 will be required).
j. Contractor invoices and Government pays for PTO. Upon payment of invoice to the contractor, the deliverable shall be Government property. The Government may use the deliverable as the Government deems.
k. Upon completion of the steps a-j listed above, the project is considered ―on the shelf‖ and awaiting funds.
l. The negotiated/accepted cost resulting from the PTO shall remain valid through the end of the current Period of
Performance.
m. The contractor may update any funded projects that are outside of the Period of Performance by issuing another
PTO using current option year pricing.
ISSUANCE OF A TASK ORDER FROM PTO
a. Upon receipt of funding, a new task order will be issued to accomplish the Task Order.
b. The previously paid proposal fees will be deducted from the overall price of the new Task Order.
ELECTRONIC INVOICING, SUPPLEMENTAL INFORMATION – CONSTRUCTION
a) IAW DFARS 252.232-7003, Electronic Submission of Payment Requests, Eielson AFB is set up to receive electronic invoices through Wide Area Work Flow (WAWF). WAWF significantly accelerates all aspects of the invoicing process by removing the need for paper copy transmission of documents (i.e., faxes or snail mail). In addition, contractors using WAWF will be able to check on the status of submitted invoices by simply logging into the WAWF website.
b) Electronic submission of invoices is required unless an exception at DFARS 232.7002 is met. Any request to submit a non-electronic invoice IAW DFARS 232.7002(6)(i) must be submitted in writing to the
Contracting Officer and shall state why the Contractor is unable to submit an electronic invoice.
c) Contractors may register with WAWF by contacting Defense Finance and Accounting Service (DFAS-
Limestone) directly at 1-888-756-4571 for assistance.
d) When the Preconstruction Conference (PRECON) is held, additional information on invoicing via WAWF will be provided.
Section H - Special Contract Requirements
H-1. BONDING REQUIREMENTS
a. Bid Bond. Each offeror shall submit, with its proposal, a bid (offer) guarantee in the form of a Bid Bond (SF 24) with good and sufficient surety or sureties acceptable to the Government, or other security as described in FAR
52.228-1, Bid Guarantee. The required amount of the bid is twenty percent (20%) of the proposal price. The penal sum of a Bid Bond may be expressed in terms of a percentage of a bid price or as a stipulated monetary amount.
When the penal sum is expressed as a percentage, a maximum dollar limitation may be stated.
b. Performance and Payment Bonds. In accordance with FAR clause 52.228-15, the Contractor to whom the award is made shall, within ten (10) calendar days after date of award, furnish a performance bond (SF 25) and a Payment
Bond (SF 25-A), each with a good and sufficient surety or sureties acceptable to the Government. The penal amount of the performance and payment bonds shall equal $1,500,000.00. Both the performance and payment bond must be current and valid throughout the basic year, and each option year (if exercised) thereafter. If the value of awarded
TASK ORDERS exceeds the ordering limitation of $1,500,000.00, an additional amount equal to one hundred percent (100%) of the excess amount will be required.
H-2. REQUIRED INSURANCE (IAW FAR 28.306(b))
Reference FAR Clause 52.228-5, Insurance Work on a Government Installation, the Contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract:
a. Workers’ compensation and employer’s liability Insurance: $100,000
b. General liability: $500,000 per occurrence.
c. Automobile liability: $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.
H-3. STATE/LOCAL REQUIREMENTS
If the Contractor, its employees and/or agents, will be utilizing motor vehicles under the performance of the subject contract within the state of Alaska, the Contractor shall abide by and comply with all State of Alaska, Division of
Motor Vehicle Requirements which can be reviewed at http://www.state.ak.us/dmv/. Additionally, failure to meet and/or maintain the Alaska Division of Motor Vehicle Requirements may result in expulsion of the vehicle from the installation until such requirements are met. Offeror is encouraged to review the aforementioned website prior to proposal submission. Note that the previously stated website and its contents are subject to change with or without notice. Accordingly, it is the Contractor’s sole responsibility to ensure compliance at all times. The expulsion of any Contractor operated vehicle shall not affect the period of performance for any and/or all projects and is not considered a Government caused delay. Furthermore, the website as noted above is NOT endorsed, operated or maintained by the United States Air Force; its inclusion is merely for reference.
H-4. FIRE SAFETY REQUIREMENTS
The Contractor shall obtain a permit from the Base Fire Department prior to conducting any welding or soldering or whenever the use of open flame is necessary during the construction phase. The Contractor and his employees will be required to adhere to any Federal, State, Local, AFOSHA and OSHA requirements.
http://www.state.ak.us/dmv/
H-5. SEATBELTS
The wearing of seatbelts by operators and passengers of all privately owned and Government vehicles, excluding motorcycles, are mandatory whenever the vehicle is in motion on a military installation. The failure by any occupant of a vehicle to comply with this requirement will result in denial of entrance to the installation. Violation of this requirement by any occupant of a vehicle traveling on Eielson AFB may result in the driver of the vehicle losing his/her driving privileges on Eielson AFB. Loss of driving privileges for failure to comply with Eielson AFB
Traffic Regulations shall not affect the period of performance for any and/or all projects and is not considered a
Government caused delay.
H-6. WORK SCHEDULE
a. Working hours for the Contractor will be between the hours of 7:00 am through 5:00 pm at Eielson AFB excluding Saturdays, Sundays, and Federal holidays. The following federal holidays are observed at Eielson AFB:
New Year’s Day Labor Day
Martin Luther King’s Birthday Columbus Day
President’s Day Veterans Day
Memorial Day Thanksgiving Day
Independence Day Christmas Day
b. If the Contractor desires to work during periods other than the above, additional Government inspection forces may be required. The Contractor must request permission to work outside the normal work schedule no later than three days in advance of his intention to work during other periods to allow assignment of additional inspection forces when the Contracting Officer determines that they are reasonably available. If such force is reasonably available, the Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days; however, if inspectors are required to perform in excess of their normal duty days solely for the benefit of the Contractor, the actual cost of inspection at overtime rates may be charged to the Contractor. These adjustments to the contract price may be made periodically as directed by the Contracting Officer.
H-7. WEATHER CONDITIONS
Historical climate conditions for Eielson AFB can be found on the following website at http://www.wrcc.dri.edu/summary/climsmak.html. Offeror is encouraged to review the data for Eielson AFB, AK prior to proposal submission. Note that the previously stated website and its contents are subject to change with or without notice. Furthermore, the website as noted above is NOT endorsed, operated or maintained by the United
States Air Force; its inclusion is merely for reference. Any reliance on such information is at the risk of the
Interested Party.
H-8. REQUIRED DATE FOR MATERIAL SUBMITTAL/SHOP DRAWINGS
a. Material submittals as required by Section I, Clause 52.236-5 entitled ―Material and Workmanship‖, and shop drawings as required by Section I, Clause 52.236-21 entitled ―Specifications and Drawings for Construction‖, are listed on ―Schedule of Material Submittals‖ attachment.
b. Contractor shall submit shop drawings and material submittals in accordance with the contract or as otherwise directed by the Contracting Officer.
c. All shop drawings and material submittals shall be prepared and submitted in accordance within this Section entitled ―Material Approval Submittal Form‖.
http://www.wrcc.dri.edu/summary/climsmak.html
d. In the event the Contractor cannot meet the established dates for submission of material submittals or shop drawings, he will advise the Contracting Officer verbally and in writing and arrange a mutually acceptable date that will not delay progress of the work.
H- 9. MATERIAL APPROVAL SUBMITTAL FORM (AF FORM 3000)
a. All materials and articles requiring approval, as contemplated by the Materials and Workmanship clause shall be submitted by the Contractor, by means of AF Form 3000. The contracting officer shall establish a suspense date on action to be taken on submittals and retain the fourth copy for necessary follow-up action.
b. In so far as practical and before commencement of work, the contracting officer shall inform the Contractor of the materials or articles requiring approval.
H-10. CONTRACT PROGRESS SCHEDULES AND REPORTS FOR CONSTRUCTION CONTRACTS
a. AF Form 3064, Contract Progress Schedule, shall be used to satisfy the requirements of the Schedules for
Construction Contracts clause (FAR 52.236-15). The Contractor shall submit the AF Form 3064 for all task orders written against this contract with a period of performance of 60 days or more. Contract Progress Schedules shall be submitted for task orders with performance periods less than 60 days at the request of the contracting officer. Upon submission of the initial AF Form 3064, the Contracting Officer and Civil Engineer shall carefully evaluate the percentage of the total job assigned to each work element. Particular attention shall be devoted to those elements to be performed in the early stages of the effort to preclude overstatement that would result in an imbalance in payments and exceed the value of work performed. Work elements shall be limited to those tasks, which will indicate the progress of the work and which, may be readily identified and measured by personnel monitoring the
Contractor’s progress. Normally the percentage factors of each work element should be related to the total value of the contract. This may vary, however, depending on the percentage factor the Contracting Officer chooses to assign for materials stored on-site. Consideration for materials stored on-site should be limited to major high cost items.
b. AF Form 3065, Contract Progress Report, shall be used to satisfy the requirement of periodic progress reporting by one of the following methods, at the discretion of the Contracting Officer:
1. Separate reports covering the same period will be prepared by the Contractors and by the Civil Engineer or their designees.
2. The Contractor shall prepare the report and route it through Civil Engineering. The Civil Engineer or their designees shall review the report and make necessary comments and forward it to the base contracting office for action.
3. Appropriate action shall be taken to resolve any significant variances of five percent or more in the percent of progress reported by the Contractor and the Civil Engineer.
c. Appropriate revisions shall be made to the existing AF Form 3064, or a revised form obtained, whenever a contract modification causes a change in the original progress schedule. A revised AF Form 3064 shall be obtained whenever the performance period is extended for 60 days or more. Upon completion of the contract, the actual completion date shall be entered on the AF Form 3064 and the form, together with all supporting copies of AF Form
3065, shall be filed as permanent records.
d. Work elements entered in column B of the AF Form 3064 shall be limited to those tasks which will indicate the progress of the work under the contract, and which may be readily identified and measured by personnel monitoring the Contractor’s progress. Such elements as preparatory work, mobilization, demobilization, and cleanup may be considered as appropriate entries when they represent actual progress upon which the Contracting Officer may make a decision regarding approval or disapproval of the Contractor’s payment estimates.
H- 11. INTERRUPTION OF UTILITY SERVICES
The Government may not be held responsible for interruptions of utility service and will not be liable for Contractor delays, damages, or increased costs caused by any such interruption of service.
H-12. UTILITY SERVICES
The Contractor will be required to participate in all Air Force energy conservation programs. Utility services furnished to the Contractor by the Government from the Government’s existing system outlets and supplies will be at no cost to the Contractor, but see contract clause titled FAR 52.236-14, ―Availability and Use of Utility Services,‖ in Section I.
H-13. DAMAGE TO UTILITIES
The Contractor shall be responsible for any and all damages to accurately marked utilities resulting from its operations. Further, the Contractor shall be held liable for all costs associated with such damages. Such costs include not only the costs to properly repair the damaged utility, but any direct costs incurred by the government to provide emergency response to the site, as well as for any other monetary losses. Such loss may also include the value of loss of productivity experienced by the government due to loss of power and /or facility evacuation arising from the utility damage.
H-14. DEWATERING PERMIT
The Contractor is required to comply with current applicable permits, state regulations, and requirements for any dewatering operations. Specifically, the Contractor is required to comply with Alaska Wastewater Disposal Permit
No. 9440-DB002 governing dewatering activities, which is hereby incorporated by reference into this contract. In accordance with the subject permit, wastewater discharged or diverted from any construction activity such as culvert placement, gravel mining, bridge construction, and building construction must comply with Alaska Water Quality
Standards as well as the limitations in Permit No. 9440-DB002. In addition, the Contractor is required to notify the
State of Alaska at least two weeks before discharging any water from the construction site when the total volume of water to be discharged or moved exceeds 500,000 gallons. This notification must meet the requirements of Appendix
A, Section I of Permit 9440-DB002. Nothing in this section relieves the Contractor of its obligation under the
Federal Acquisition Regulation Permits and Responsibilities Clause to comply with all applicable environmental standards and laws.
H-15. FINAL INSPECTION
Final Inspection will be conducted during the period of Monday through Friday between 0800 hours and 1600 hours.
The Contractor must notify the Contracting Officer in writing a minimum of five (5) calendar days prior to completion date. Final Inspection falling due on weekends, legal holidays, and 354 th
Wing down days will be postponed to the following workday.
H-16. TELECOMMUNICATIONS MONITORING AND ASSESSMENT PROGRAM (TMAP)(IAW AFI
33-219)
All communications within DOD organizations are subject to TMAP review. Contractor personnel will be aware that telecommunications networks are continually subject to intercept by unfriendly intelligence organizations. The DOD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating or terminating at DOD organizations. Therefore, civilian Contractor personnel are advised that anytime they place a call to or receive a call from a USAF organization, they are subject to TMAP procedures. The
Contractor will assume the responsibility for ensuring wide and frequent dissemination of the above information to all employees dealing with official DOD information.
H-17. HAZARDOUS MATERIAL REPORTING
a. The Contractor shall submit an initial Hazardous Material Report within 10 calendar days after award, to the Base
Contracting Office. Hazardous material is defined as any material that requires a Material Safety Data Sheet (MSDS) in accordance with 29 CFR 1910.1200 and Federal Standard 313c, paragraph 3.3. This initial Hazardous Material
Report will be reviewed and annotated by the Base Bioenvironmental Office to identify which hazardous materials shall be tracked and reported by the Contractor in a Hazardous Material Usage Report, discussed later. The initial
Hazardous Material Report will be returned to the Contractor within 30 calendar days after submission. The initial
Hazardous Material Report shall include the following information and follow the format indicated below:
b. Hazardous Material Product Name, MSDS Serial #, Estimated quantity that will be stored and used on Eielson
AFB, in direct support of contract performance for the calendar year. The Contractor shall submit an annual
Hazardous Material Usage Report for hazardous material used in direct support of contract performance at Eielson
AFB. The report shall show the maximum quantity of hazardous material stored on Eielson AFB, the quantity used on Eielson AFB, and the quantity removed from Eielson AFB.
c. This report is due to the Base Contracting Office within 20 calendar days after completion of the contract or within
20 calendar days after 31 December of each calendar year, whichever comes first. The annual Hazardous Material
Report shall include the following information and follow the format indicated below:
d. Hazardous Material Product Name, MSDS Serial #, the Total Quantity of the hazardous material that was stored on Eielson AFB during the calendar year, Total Quantity used on Eielson AFB during the calendar year, and the
Total Removed from Eielson AFB at the completion of subject contract.
H-18. DYNAMIC SMALL BUSINESS SEARCH PROGRAM
All Contractors are requested to utilize the Dynamic Small Business Search program in Central Contractor
Registration, http://dsbs.sba.gov/dsbs/search/dsp_dsbs.cfm, to assist them in obtaining resources to meet their contractual requirements. The Dynamic Small Business Search program is an electronic gateway of procurement information - for and about small businesses. It is a search engine for Contracting Officers, a marketing tool for small firms and a ―link‖ to procurement opportunities and important information. It is designed to be a ―virtual‖ one-stop-procurement-shop. The Dynamic Small Business Search program is an Internet based database of information. It is free to federal and state Government agency as well as prime and other Contractors seeking small business
Contractors, subcontractors and/or partnership opportunities.
H-19. INVESTIGATION OF DAMAGE OR INJURY
The United States Government will have the right to conduct an investigation, or participate in the Contractor’s investigation, of any damage or injury to United States Government property, equipment or personnel.
http://dsbs.sba.gov/dsbs/search/dsp_dsbs.cfm
H-20. CONSTRUCTION EQUIPMENT
Equipment and vehicles to be used on base shall be safe and in good operating condition. The Contracting Officer, or authorized representative, reserves the right to inspect any on-base equipment and reject such equipment if he/she considers it unsafe, in poor operating condition, or inappropriate for work. The Contractor must notify the
Contracting Officer of any Contractor equipment that is ―broken down‖ on Eielson AFB. Every effort should be made to move ―broken down‖ equipment to the nearest parking lot before leaving it.
H-21. TRAFFIC REGULATIONS / CELL PHONE USAGE
The Contractor, its employees and/or agents, operating motor vehicles on Eielson AFB shall comply with all installation traffic regulations inclusive of any cell phone usage guidelines. Installation traffic regulations are subject to change with or without notice. Accordingly, it is the Contractor’s sole responsibility to ensure compliance at all times. Violation of any traffic regulations may result in loss of on-base driving privileges. Loss of driving privileges shall not affect the period of performance and is not considered a Government caused delay.
H-22. WINTER EXCLUSION PERIOD
No work will be required for exterior work unless otherwise approved in writing by the Contracting Officer, during the period from 1 October through 30 April inclusive. If the Contractor chooses to work during this period, those days will be deducted from the performance period. The winter exclusion will be negotiated per each task order.
Section I - Contract Clauses
52.202-1 Definitions JUL 2004
52.203-3 Gratuities APR 1984
52.203-5 Covenant Against Contingent Fees APR 1984
52.203-7 Anti-Kickback Procedures OCT 2010
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
JAN 1997
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity JAN 1997
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.204-4 Printed or Copied Double-Sided on Recycled Paper AUG 2000
52.204-7 Central Contractor Registration APR 2008
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract
Awards
JUL 2010
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
DEC 2010
52.211-18 Variation in Estimated Quantity APR 1984
52.214-26 Audit and Records--Sealed Bidding OCT 2010
52.214-27 Price Reduction for Defective Certified Cost or Pricing Data -
Modifications - Sealed Bidding
OCT 2010
52.214-28 Subcontracting Certified Cost Or Pricing Data--
Modifications--Sealed Bidding
OCT 2010
52.214-29 Order Of Precedence--Sealed Bidding JAN 1986
52.219-8 Utilization of Small Business Concerns JAN 2011
52.219-14 Limitations On Subcontracting DEC 1996
52.222-1 Notice To The Government Of Labor Disputes FEB 1997
52.222-3 Convict Labor JUN 2003
52.222-4 Contract Work Hours and Safety Standards Act - Overtime
Compensation
JUL 2005
52.222-6 Davis Bacon Act JUL 2005
52.222-7 Withholding of Funds FEB 1988
52.222-8 Payrolls and Basic Records JUN 2010
52.222-9 Apprentices and Trainees JUL 2005
52.222-10 Compliance with Copeland Act Requirements FEB 1988
52.222-11 Subcontracts (Labor Standards) JUL 2005
52.222-12 Contract Termination-Debarment FEB 1988
52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988
52.222-14 Disputes Concerning Labor Standards FEB 1988
52.222-15 Certification of Eligibility FEB 1988
52.222-21 Prohibition Of Segregated Facilities FEB 1999
52.222-26 Equal Opportunity MAR 2007
52.222-27 Affirmative Action Compliance Requirements for
Construction
FEB 1999
52.222-35 Equal Opportunity For Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans
SEP 2010
52.222-36 Affirmative Action For Workers With Disabilities OCT 2010
52.222-37 Employment Reports on Veterans SEP 2010
52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons FEB 2009
52.222-54 Employment Eligibility Verification JAN 2009
52.223-5 Pollution Prevention and Right-to-Know Information AUG 2003
52.223-6 Drug-Free Workplace MAY 2001
52.225-10 Alt I Notice of Buy American Act Requirement--Construction
Materials (Feb 2009) Alternate I
MAY 2002
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008
52.225-25 Prohibition on Engaging in Sanctioned Activities Relating to
Iran--Certification.
SEP 2010
52.227-1 Authorization and Consent DEC 2007
52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
52.227-4 Patent Indemnity-Construction Contracts DEC 2007
52.228-1 Bid Guarantee SEP 1996
52.228-2 Additional Bond Security OCT 1997
52.228-5 Insurance - Work On A Government Installation JAN 1997
52.228-11 Pledges Of Assets SEP 2009
52.228-12 Prospective Subcontractor Requests for Bonds OCT 1995
52.228-14 Irrevocable Letter of Credit DEC 1999
52.228-15 Performance and Payment Bonds--Construction OCT 2010
52.229-3 Federal, State And Local Taxes APR 2003
52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002
52.232-17 Interest OCT 2010
52.232-23 Assignment Of Claims JAN 1986
52.232-23 Alt I Assignment of Claims (Jan 1986) - Alternate I APR 1984
52.232-27 Prompt Payment for Construction Contracts OCT 2008
52.232-33 Payment by Electronic Funds Transfer--Central Contractor
Registration
OCT 2003
52.233-1 Disputes JUL 2002
52.233-3 Protest After Award AUG 1996
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004
52.236-2 Differing Site Conditions APR 1984
52.236-3 Site Investigation and Conditions Affecting the Work APR 1984
52.236-5 Material and Workmanship APR 1984
52.236-6 Superintendence by the Contractor APR 1984
52.236-7 Permits and Responsibilities NOV 1991
52.236-8 Other Contracts APR 1984
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984
52.236-11 Use and Possession Prior to Completion APR 1984
52.236-12 Cleaning Up APR 1984
52.236-13 Accident Prevention NOV 1991
52.236-14 Availability and Use of Utility Services APR 1984
52.236-15 Schedules for Construction Contracts APR 1984
52.236-17 Layout of Work APR 1984
52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) -
Alternate I
APR 1984
52.236-26 Preconstruction Conference FEB 1995
52.242-13 Bankruptcy JUL 1995
52.242-14 Suspension of Work APR 1984
52.243-4 Changes JUN 2007
52.244-6 Subcontracts for Commercial Items DEC 2010
52.245-1 Government Property AUG 2010
52.245-9 Use And Charges AUG 2010
52.246-21 Alt I Warranty of Construction (Mar 1994) - Alternate I APR 1984
52.247-64 Preference for Privately Owned U.S. - Flag Commercial
Vessels
FEB 2006
52.248-3 Value Engineering-Construction OCT 2010
52.249-2 Alt I Termination for Convenience of the Government (Fixed-
Price) (May 2004) - Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction) APR 1984
52.253-1 Computer Generated Forms JAN 1991
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
JAN 2009
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-
Contract-Related Felonies
DEC 2008
252.203-7002 Requirement to Inform Employees of Whistleblower Rights JAN 2009
252.204-7000 Disclosure Of Information DEC 1991
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7004 Alt A Central Contractor Registration (52.204-7) Alternate A SEP 2007
252.204-7006 Billing Instructions OCT 2005
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Terrorist Country
DEC 2006
252.215-7000 Pricing Adjustments DEC 1991
252.223-7006 Prohibition On Storage And Disposal Of Toxic And
Hazardous Materials
APR 1993
252.225-7012 Preference For Certain Domestic Commodities JUN 2010
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
MAR 2008
252.232-7010 Levies on Contract Payments DEC 2006
252.236-7000 Modification Proposals-Price Breakdown DEC 1991
252.243-7001 Pricing Of Contract Modifications DEC 1991
252.243-7002 Requests for Equitable Adjustment MAR 1998
252.244-7000 Subcontracts for Commercial Items and Commercial
Components (DoD Contracts)
NOV 2010
252.247-7023 Transportation of Supplies by Sea MAY 2002
252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000
52.211-10 COMMENCEMENT,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .