Appendix_N_-_Operational_Requirements_16_Jun_16_Sources_Sought.pdf
PDF 495 KB Posted
- Attached to
- Remotely Piloted Aircraft (RPA) Federal contract opportunity
- Solicitation number
- FA4890-16-R-0032
About this file
Draft Appendix N Operational Requirements
View the file
Other files for this federal contract opportunity
Show all 50
Remotely Piloted Aircraft (RPA) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation: FA4890-16-R-0032 16 Jun 16
N-1
Appendix N
Operational Requirements
Operational requirements below reflect the maximum projected level of effort to support RPA requirements. Fiscal years operational requirements are projections and there is no guarantee these projections will match actual operational requirements. Specific requirements and performance periods will be addressed in individual task order requirements.
1.0. RQ-4 OCONUS Requirements:
1.1 FY18-End
Location Supported
E/RQ-4
Aircraft
Average Sorties/ Month
(ASM)
Average Sortie
Duration
(ASD)
Hours/ Month Aircraft LRE
GCS*
Andersen AB Guam** 0-3 20 24 ~500 Blk 30 1 0-3 18 24 ~450 Blk 40 1
Misawa AB Japan** 2-3 20 24 ~500 Blk 30 1 2-3 18 24 ~450 Blk 40 1
Sigonella NAS Italy 3 30 24 ~725 Blk 30 1 0-3 0-18 24 ~450 Blk 40 N/A
Operating locations: Andersen AB Guam, Sigonella NAS Italy, Misawa AB Japan, ASD: Average Sortie Duration The Average Sorties/Day, ASD, Hours/Month, Aircraft, and LRE GCS represent maximum numbers the contractor is expected to support. Operations at Andersen AB and NAS Sigonella are based on 24/7 scheduling but actual mission will be generated in accordance with the GFMAP. Actual requirements may vary and are defined in the task orders.
Notes: Capital Assets are not available for training (aircraft/LRE GCS)
* LRE GCSs are configureable and shared between Blks of aircraft ** Aircraft assigned to Andersen AFB, Guam will deploy to Misawa, the PACOM locations will have a maximum of 5 aircraft at any one location.
2.0 RQ-4 Deployed Requirements: The actual number of sites, Orbits per site, and total number of
Orbits will vary as dictated by mission requirements but will not exceed maximum requirements identified below. Support at all locations shall provide 24 hour/7 day coverage.
2.1 FY18-End
Supported RPA Up to # of Locations Maximum Orbits
RQ-4 3 3
DRAFT 16
JU
N 16
N-2
3.0 MQ-1/9 ANG Support Requirements:
3.1 FY18-FY19
Location # Aircraft Type GCSs Combat Lines
Avgerage Daily
Training Lines
AR ANG N/A 2 1 1
AZ ANG (Ft. Huachuca) 4 MQ-9 2 N/A 1
IA ANG N/A 2 1 1
NY ANG (Niagara) N/A 2 1 1
OH ANG N/A 2 1 1
PA ANG N/A 2 1 1
TN ANG N/A 2 1 1
MI ANG N/A 2 1 1
NOTE: Combat Lines are 24/7; Daily Training Lines 18/7. AZ ANG will transition to military maintenance support at the end of FY19.
3.2 FY20-End
Location GCSs Combat Lines Avg Daily Trng Lines
AR ANG 2 1 1
IA ANG 2 1 1
NY ANG (Niagara) 2 1 1
OH ANG 2 1 1
PA ANG 2 1 1
TN ANG 2 1 1
MI ANG 2 1 1
NOTE: Combat Lines are 24/7; Daily Training Lines 18/7
4.0 MQ-1/9 CONUS Requirements:
4.1 FY18 Base Year:
Lines
Daily Training - Test Lines
Creech AFB (432WG) 8 MQ-1 5 N/A 1
8 MQ-9* 3
Ellsworth AFB N/A 5 4 N/A Whiteman AFB N/A 5 4 N/A
Nellis AFB (57WG) N/A 4 N/A 2 Holloman AFB (49WG) 10 MQ-1 4 N/A 2
NOTE: Combat Lines are 24/7; Training Lines are M-F, 18 Hr ASD; *Aircraft mix will change during FY18, transitioning from 8xMQ-1 to 8xMQ-9
DRAFT 16
N-3
4.2 FY19 Option Year 1:
Lines
Daily Training - Test Lines
Creech AFB 8 MQ-9 5 N/A 4 Ellsworth AFB N/A 5 4 N/A Whiteman AFB N/A 5 4 N/A
Nellis AFB (57WG) N/A 4 N/A 2 Holloman AFB (49WG) 10 MQ-9 4 N/A 2
Base X N/A 5 4 1 NOTE: Combat Lines are 24/7; Training Lines are M-F, 18 Hr ASD; Base X is CPIP-directed MCE only Group location, exact standup TBD *Aircraft mix will change during FY19, transitioning from 8xMQ-1 to 8xMQ-9
4.3 FY20-End:
Lines
Daily Training - Test Lines
Creech AFB 8 MQ-9 5 N/A 4 Ellsworth AFB N/A 5 4 N/A Whiteman AFB N/A 5 4 N/A
Nellis AFB (57WG) N/A 4 N/A 2 Holloman AFB (49WG) 10 MQ-9 4 N/A 2
Base X N/A 5 4 1 Base Y 10/MQ-9 10 8 2
NOTE: Combat Lines are 24/7; Training Lines are M-F, 18 Hr ASD; Base X is CPIP-directed MCE only Group location, exact standup TBD; Base Y is CPIP-directed Wing with both aircraft and GCSs, standup TBD based on basing timelines.
5.0 MQ-1/9 OCONUS Requirements:
5.1 FY18 Base Year:
Location # Aircraft Type Combat Lines GCSs
DP-14 12 MQ-9 6 2
DP-31 12 MQ-1 5 2
DP-32 12 MQ-1 5 2
DP-XX 8 MQ-1 3 3 8 MQ-9
DP-A (GOCO) 6 MQ-9 3 3
DP-B (GOCO) 8 MQ-9 4 4
DP-Opt 1 8 MQ-9 4 2 DP-Opt 2 8 MQ-9 4 2
NOTE: Combat Lines 24/7; DP-XX transitioning from MQ-1 to MQ-9 3QFY18, number of aircraft and GCSs is unaffected; DP-A/B support GOCO operations from TBD locations; DP Opt1/2 are optional DPs to cover emerging requirements
DRAFT 16
N-4
5.2 FY19-End:
Location # Aircraft Type Combat Lines GCSs
DP-14 12 MQ-9 6 2
DP-31 12 MQ-9 5 2
DP-32 12 MQ-9 5 2
DP-XX 8 MQ-9 3 3
DP-A (GOCO) 6 MQ-9 3 3
DP-B (GOCO) 8 MQ-9 4 4
DP-Opt 1 8 MQ-9 4 2 DP-Opt 2 8 MQ-9 4 2
NOTE: Combat Lines 24/7; DP-A/B support GOCO operations from TBD locations; DP Opt1/2 are optional DPs to cover emerging requirements
6.0 MQ-1/9 Aircrew Requirements
6.1 FY18 – FY19
Aircrew Member Quantity # of Deployed Locations Pilot 14 Up to 7
Sensor Operator 14 Up to 7
6.2 FY20
Pilot 14 Up to 8 Sensor Operator 14 Up to 8
6.3 FY21
Pilot 16 Up to 9
Sensor Operator 16 Up to 9
6.4 FY22-End
Pilot 18 Up to 10 Sensor Operator 18 Up to 10
DRAFT 16
File details come from the government source that posted it. Updated .