Appendix_N_-_Operational_Requirements_16_Jun_16_Sources_Sought.pdf

PDF 495 KB Posted

Attached to
Remotely Piloted Aircraft (RPA) Federal contract opportunity
Solicitation number
FA4890-16-R-0032
Issued by
Department of the Air Force Air Combat Command

About this file

Draft Appendix N Operational Requirements

View the file

Other files for this federal contract opportunity

Other files attached to Remotely Piloted Aircraft (RPA), newest first.
File Type Posted
Questions_and_Responses_posted_3_Feb_17.pdf PDF
RPA_Solicitation_Draft_OCI_Clause.pdf PDF
Draft_RFP_Questions_and_Responses.pdf PDF
Draft_Pricing_Tables_22Nov16.xlsx XLSX spreadsheet
Industry_Questions_22_Nov_16_Posting.pdf PDF
Appendix_D_-_Publications_Forms_and_Websites_(8_Nov_16)_RECOMPETE.pdf PDF
Appendix_C_-_AFI_CAFI_ANG_Comp_Matrix_(8_Nov_16)_RECOMPETE.pdf PDF
TO_000E_(Holloman)_Unique_Requirements.pdf PDF
TO_000H_(Des_Moines)_Unique_Requirements.pdf PDF
Atch_4I_WD_05-2037_R16_Sebastian_AR-Ft_Smith.pdf PDF
Atch_4L_WD_15-4647_R2_Davidson_TN-Nashville.pdf PDF
Appendix_H_-_RPA_Service_Summary_(8_Nov_16)_RECOMPETE.pdf PDF
Appendix_I_-_Special_Requirements_Deployment_(8_Nov_16)_RECOMPETE.pdf PDF
PERFORMANCE_WORK_STATEMENT_Recompete_-_1_Nov_16.pdf PDF
TO_000K_(Springfield)_Unique_Requirements.pdf PDF
Atch_4D_WD_15-5367_R1_Meade_SD-Ellsworth.pdf PDF
TO_000M_(Nashville)_Unique_Requirements.pdf PDF
TO_000P_(DP-14_MX)_Unique_Requirements.pdf PDF
Atch_4H_WD_05-2025_R19_Cochise_AZ-Ft_Huachuca.pdf PDF
Atch_4G_WD_CBA-16-8368_R2_Clark_NV-Creech_Sub.pdf PDF
Atch_4C_WD_05-2407_R17_ND_Statewide-Grand_Forks.pdf PDF
Appendix_M_-_Certifications _Training_and_Qualifications_(8_Nov_16)_RECOMPETE.pdf PDF
Appendix_B_-_Reports_(8_Nov_16)_RECOMPETE.pdf PDF
Atch_4N_WD_15-4147_R1_Niagara_NY-Niagara_Falls.pdf PDF
TO_000S_(DP-14_LRE)_Unique_Requirements.pdf PDF
Appendix_A_-_Definitions _Abbreviations_and_Acronyms_(8_Nov_16)_RECOMPETE.pdf PDF
Atch_4B_WD_15-5593_R1_Clark_NV-Nellis.pdf PDF
TO_000Q_(DP-31_MX)_Unique_Requirements.pdf PDF
Appendix_G_-_QMS_(8_Nov_16)_RECOMPETE_2016.pdf PDF
Atch_4P_WD_05-2147_R19_Guam_Statewide-Andersen.pdf PDF
Atch_4E_WD_CBA-16-8493_R3_Otero_NM-Holloman_Prime_Sub.pdf PDF
Atch_4F_WD_CBA-14-7325_R2_Clark_NV-Creech_Prime.pdf PDF
Appendix_N_-_Operational_Requirements_(8_Nov_16)_RECOMPETE.pdf PDF
TO_000D_(Ellsworth)_Unique_Requirements.pdf PDF
Atch_4O_WD_15-2277_R1_Calhoun_MI-Battle_Creek.pdf PDF
Atch_4J_WD_15-2205_R1_Polk_IA-Des_Moines.pdf PDF
TO_000J_(Niagara_Falls)_Unique_Requirements.pdf PDF
Draft_DD254_RECOMPETE.pdf PDF
Atch_4M_WD_15-2419_R2_Clark_OH-Springfield.pdf PDF
TO_000C_(Whiteman)_Unique_Requirements.pdf PDF
RPA_FA4890-16-R-0032_Section_M_ROUGH_DRAFT_23_Aug_16.pdf PDF
Industry_Day_Attendees_Sign-in.pdf PDF
Q A_from_Industry_Day_posting.pdf PDF
Appendix_C_-_AFI_CAFI_ANG_Comp_Matrix_16_Jun_16_Sources_Sought.pdf PDF
Appendix_D_-_Publications_Forms_and_Websites_16_Jun_16_Sources_Sought.pdf PDF
Appendix_H_-_RPA_Service_Summary_16_Jun_16_Sources_Sought.pdf PDF
Appendix_G_-_QMS_16_Jun_16_Sources_Sought.pdf PDF
Appendix_A_-_Definitions _Abbreviations _and_Acronyms_16_Jun_16_Sources_Sought.pdf PDF
Appendix_B_-_Reports_16_Jun_16_Sources_Sought.pdf PDF
Atch_1_-_RPA_FA4890-16-R-0032_Sources_Sought_Questionnaire.pdf PDF
Show all 50

Remotely Piloted Aircraft (RPA) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation: FA4890-16-R-0032 16 Jun 16

N-1

Appendix N

Operational Requirements

Operational requirements below reflect the maximum projected level of effort to support RPA requirements. Fiscal years operational requirements are projections and there is no guarantee these projections will match actual operational requirements. Specific requirements and performance periods will be addressed in individual task order requirements.

1.0. RQ-4 OCONUS Requirements:

1.1 FY18-End

Location Supported

E/RQ-4

Aircraft

Average Sorties/ Month

(ASM)

Average Sortie

Duration

(ASD)

Hours/ Month Aircraft LRE

GCS*

Andersen AB Guam** 0-3 20 24 ~500 Blk 30 1 0-3 18 24 ~450 Blk 40 1

Misawa AB Japan** 2-3 20 24 ~500 Blk 30 1 2-3 18 24 ~450 Blk 40 1

Sigonella NAS Italy 3 30 24 ~725 Blk 30 1 0-3 0-18 24 ~450 Blk 40 N/A

Operating locations: Andersen AB Guam, Sigonella NAS Italy, Misawa AB Japan, ASD: Average Sortie Duration The Average Sorties/Day, ASD, Hours/Month, Aircraft, and LRE GCS represent maximum numbers the contractor is expected to support. Operations at Andersen AB and NAS Sigonella are based on 24/7 scheduling but actual mission will be generated in accordance with the GFMAP. Actual requirements may vary and are defined in the task orders.

Notes: Capital Assets are not available for training (aircraft/LRE GCS)

* LRE GCSs are configureable and shared between Blks of aircraft ** Aircraft assigned to Andersen AFB, Guam will deploy to Misawa, the PACOM locations will have a maximum of 5 aircraft at any one location.

2.0 RQ-4 Deployed Requirements: The actual number of sites, Orbits per site, and total number of

Orbits will vary as dictated by mission requirements but will not exceed maximum requirements identified below. Support at all locations shall provide 24 hour/7 day coverage.

2.1 FY18-End

Supported RPA Up to # of Locations Maximum Orbits

RQ-4 3 3

DRAFT 16

JU

N 16

N-2

3.0 MQ-1/9 ANG Support Requirements:

3.1 FY18-FY19

Location # Aircraft Type GCSs Combat Lines

Avgerage Daily

Training Lines

AR ANG N/A 2 1 1

AZ ANG (Ft. Huachuca) 4 MQ-9 2 N/A 1

IA ANG N/A 2 1 1

NY ANG (Niagara) N/A 2 1 1

OH ANG N/A 2 1 1

PA ANG N/A 2 1 1

TN ANG N/A 2 1 1

MI ANG N/A 2 1 1

NOTE: Combat Lines are 24/7; Daily Training Lines 18/7. AZ ANG will transition to military maintenance support at the end of FY19.

3.2 FY20-End

Location GCSs Combat Lines Avg Daily Trng Lines

AR ANG 2 1 1

IA ANG 2 1 1

NY ANG (Niagara) 2 1 1

OH ANG 2 1 1

PA ANG 2 1 1

TN ANG 2 1 1

MI ANG 2 1 1

NOTE: Combat Lines are 24/7; Daily Training Lines 18/7

4.0 MQ-1/9 CONUS Requirements:

4.1 FY18 Base Year:

Lines

Daily Training - Test Lines

Creech AFB (432WG) 8 MQ-1 5 N/A 1

8 MQ-9* 3

Ellsworth AFB N/A 5 4 N/A Whiteman AFB N/A 5 4 N/A

Nellis AFB (57WG) N/A 4 N/A 2 Holloman AFB (49WG) 10 MQ-1 4 N/A 2

NOTE: Combat Lines are 24/7; Training Lines are M-F, 18 Hr ASD; *Aircraft mix will change during FY18, transitioning from 8xMQ-1 to 8xMQ-9

DRAFT 16

N-3

4.2 FY19 Option Year 1:

Lines

Daily Training - Test Lines

Creech AFB 8 MQ-9 5 N/A 4 Ellsworth AFB N/A 5 4 N/A Whiteman AFB N/A 5 4 N/A

Nellis AFB (57WG) N/A 4 N/A 2 Holloman AFB (49WG) 10 MQ-9 4 N/A 2

Base X N/A 5 4 1 NOTE: Combat Lines are 24/7; Training Lines are M-F, 18 Hr ASD; Base X is CPIP-directed MCE only Group location, exact standup TBD *Aircraft mix will change during FY19, transitioning from 8xMQ-1 to 8xMQ-9

4.3 FY20-End:

Lines

Daily Training - Test Lines

Creech AFB 8 MQ-9 5 N/A 4 Ellsworth AFB N/A 5 4 N/A Whiteman AFB N/A 5 4 N/A

Nellis AFB (57WG) N/A 4 N/A 2 Holloman AFB (49WG) 10 MQ-9 4 N/A 2

Base X N/A 5 4 1 Base Y 10/MQ-9 10 8 2

NOTE: Combat Lines are 24/7; Training Lines are M-F, 18 Hr ASD; Base X is CPIP-directed MCE only Group location, exact standup TBD; Base Y is CPIP-directed Wing with both aircraft and GCSs, standup TBD based on basing timelines.

5.0 MQ-1/9 OCONUS Requirements:

5.1 FY18 Base Year:

Location # Aircraft Type Combat Lines GCSs

DP-14 12 MQ-9 6 2

DP-31 12 MQ-1 5 2

DP-32 12 MQ-1 5 2

DP-XX 8 MQ-1 3 3 8 MQ-9

DP-A (GOCO) 6 MQ-9 3 3

DP-B (GOCO) 8 MQ-9 4 4

DP-Opt 1 8 MQ-9 4 2 DP-Opt 2 8 MQ-9 4 2

NOTE: Combat Lines 24/7; DP-XX transitioning from MQ-1 to MQ-9 3QFY18, number of aircraft and GCSs is unaffected; DP-A/B support GOCO operations from TBD locations; DP Opt1/2 are optional DPs to cover emerging requirements

DRAFT 16

N-4

5.2 FY19-End:

Location # Aircraft Type Combat Lines GCSs

DP-14 12 MQ-9 6 2

DP-31 12 MQ-9 5 2

DP-32 12 MQ-9 5 2

DP-XX 8 MQ-9 3 3

DP-A (GOCO) 6 MQ-9 3 3

DP-B (GOCO) 8 MQ-9 4 4

DP-Opt 1 8 MQ-9 4 2 DP-Opt 2 8 MQ-9 4 2

NOTE: Combat Lines 24/7; DP-A/B support GOCO operations from TBD locations; DP Opt1/2 are optional DPs to cover emerging requirements

6.0 MQ-1/9 Aircrew Requirements

6.1 FY18 – FY19

Aircrew Member Quantity # of Deployed Locations Pilot 14 Up to 7

Sensor Operator 14 Up to 7

6.2 FY20

Pilot 14 Up to 8 Sensor Operator 14 Up to 8

6.3 FY21

Pilot 16 Up to 9

Sensor Operator 16 Up to 9

6.4 FY22-End

Pilot 18 Up to 10 Sensor Operator 18 Up to 10

DRAFT 16

File details come from the government source that posted it. Updated .