Draft_-_Appendix_P_UASOCS_9_Apr_2014.docx

DOCX document 32 KB Posted

Attached to
Unmanned Aircraft System Operations Center Support (UASOCS) Federal contract opportunity
Solicitation number
FA4890-14-R-0018
Issued by
Department of the Air Force Air Combat Command

About this file

PWS App P

View the file

Other files for this federal contract opportunity

Other files attached to Unmanned Aircraft System Operations Center Support (UASOCS), newest first.
File Type Posted
FBO_UASOCS_Award_Synopsis_02_Feb_2016.doc DOC document
UASOCS_CLINs_Pricing_Sheet_Updated_rev_7.xlsx XLSX spreadsheet
Amendment_0002_-_UASOCS_Solicitation_FA4890-14-R-0018.pdf PDF
Clarification_on_9_April_2015_Posting.docx DOCX document
DD_Form_254__-_UASOCS_(Draft).pdf PDF
Past_Performance_Questionnaire.doc DOC document
UASOCS_DD254_Continuation_Pages.rtf RTF text file
Appendix__L_UASOCS26Mar15.docx DOCX document
UASOCS_RFP__DD254.pdf PDF
Ramstein_GFP.xlsx XLSX spreadsheet
CDRL_A013_-_Government_Furnished_Property_732_OG_(Sep_14).pdf PDF
PAC_1_GFE_Update_12_Mar_2015.XLS XLS spreadsheet
UASOCS_FBO_posting_Ques_and__-_Govt_Answers_(6_Mar_2015).docx DOCX document
CDRL_A013_-_Government_Furnished_Property_432_WG_(19_Dec_13).xlsx XLSX spreadsheet
Errata_for_Final_RFP_FA4890.docx DOCX document
Appendix_K_UASOCS_12Feb15.docx DOCX document
Appendix_B_UASOCS_5_Mar_15.pdf PDF
WD_2005-2543_Rev_17.pdf PDF
Appendix_F_UASOCS_Award_Fee_Plan-_19_Nov_2014.docx DOCX document
WD_2005-2485_Rev_14.pdf PDF
Appendix_G_UASOCS_12Feb15.docx DOCX document
Appendix_H_UASOCS_5Mar15.docx DOCX document
DRAFT_UASOCS_PWS_16_Dec_14.docx DOCX document
Creech_Industry_Site_Visit_Agenda_(8_Oct_2014).docx DOCX document
Draft_-_Appendix_Q_UASOCS_Sep_14.docx DOCX document
Draft_-_Appendix_A_UASOCS_Sep_14.docx DOCX document
Section_H_Special_Contract_Requirements.docx DOCX document
Draft_Award_Fee_Plan-_15Aug14.docx DOCX document
UASOCS_CLINs_Pricing_Sheet_Updated_rev_1.xlsx XLSX spreadsheet
Draft_-_Appendix_F_UASOCS_15_Aug_2014.docx DOCX document
Ellsworth_WD_05-2485_Rev_12.pdf PDF
Draft_-_Appendix_O_UASOCS_Sep_14.docx DOCX document
Draft_RFP_FA4890-14-R-0018.doc DOC document
Draft_-_Appendix_C_UASOCS__Sep_14.docx DOCX document
EUR1_Event_Log_MayJune2014.pdf PDF
UASOCS_Master_03B_Inventory.xlsx XLSX spreadsheet
UASOCS_OPS_Cell_inventory_(1).xls XLS spreadsheet
EUR-1_Workload_Data.pdf PDF
UASOCS_Industry_Day_Briefing_--final.pdf PDF
UASOCS_Industry_Day_Attendees.pdf PDF
UASOCS_Help_Desk_Tickets_2012-2014.xls XLS spreadsheet
CDRL_A013_-_Government_Furnished_Property_432_WG_(19_Dec_13)(1).xlsx XLSX spreadsheet
Draft_-_Appendix_K_UASOCS_9_Apr_2014.pdf PDF
Draft_-_Appendix_A_UASOCS_9_Apr_14.pdf PDF
Draft_-_Appendix_R_UASOCS_9_Apr_2014.pdf PDF
Draft_-_Appendix_H_UASOCS_9_Apr_2014.pdf PDF
Draft_-_Appendix_N_UASOCS_9_Apr_2014.pdf PDF
Draft_-_Appendix_G_UASOCS_9_Apr_2014.pdf PDF
Draft_-_Appendix_E_UASOCS_9_Apr_2014.pdf PDF
Draft_-_Appendix_O_UASOCS_9_Apr_2014.pdf PDF
Show all 50

Unmanned Aircraft System Operations Center Support (UASOCS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.0 Communications Status (COMSTAT) Report:

1.1. OVERVIEW: (U//FOUO) This appendix provides an unclassified example of a Communications Status Report (COMSTAT). It gives a brief overview of its purpose and describes the content of the information to be included in a COMSTAT.

1.2. PURPOSE: (U//FOUO) COMSTATs are daily reports of all planned and unplanned outages, as well as updates to current significant events. COMSTATs provide general availability oversight of core systems supporting UASOCS customers/users.

1.3. REPORTING: (U//FOUO) The help desk will submit an accurate COMSTAT on all reportable events to the WOC Director and COTR via SIPRNET e-mail, NLT 1700Z, daily. Use secure voice, if SIPRNET access is not available.

1.4. COMMUNICATIONS SYSTEMS DAILY STATUS:

1.4.1. FMC-Fully Mission Capable. This status is defined as all UASOCS systems and subsystems are operating in the correct, safe configuration including full redundancy (where available) and being fully mission capable. Equipment is fully mission capable when it can perform all of its combat missions without endangering the lives of crew or operators.

1.4.2. PMC-Partially Mission Capable. This status is defined as UASOCS systems or subsystems having degraded services or one to multiple redundancies (where available) are not operating, configured correctly or are unsafe. The UASOCS system will be able to perform at least one but not all of its missions because maintenance is required to clear the discrepancy.

1.4.3. NMC-Non Mission Capable. This status is defined as UASOCS systems or subsystems unable to perform any mission.

EXAMPLE:

1 CS/CFP COMSTAT

Langley AFB, Va

1. COMSTAT POC:

Rank/Name: SSgt Doe, Chris Unit/Org: 1 CS Location: Langley AFB, Va Phone: (312) 574-1111 Other: 574-2222 (STE)

C-2: FMC

Video: FMC

UAS

Operations

Center

Support

PWS

Solicitation No.

FA4890-14-R-0018

Contract No.

TBD

DRAFT -

APPENDIX

P

COMMUNICATIONS STATUS

AND

COMMUNICATIONS

POSTURE

REPORTS

Draft 9 Apr 14

UAS

Operations

Center

Support PWS, Appendix P Page of 3

2.0 Communications Posture (COMSPOT) Report:

2.1. OVERVIEW: (U//FOUO) This appendix provides an unclassified example of a Communications Posture (COMSPOT) report. It gives a brief overview of its purpose and describes the content of the information to be included in a COMSPOT.

2.2 PURPOSE: (U//FOUO) COMSPOTs are reports generated when an unscheduled outage occurs, as well as updates to ongoing significant events. COMSPOTs are three phase reports providing information on unscheduled outages in the form of an INITIAL, FOLLOW-UP and FINAL report.

2.3. REPORTING: (U//FOUO) The help desk will generate an accurate INITIAL COMSPOT when an unscheduled outage meets thresholds identified in paragraph 2.4. A FOLLOW-UP COMSPOT will be generated each time the original outage status changes or every 2 hours. A FINAL COMSPOT will be generated once the unscheduled outage has been cleared. All COMSPOTS will be sent to the MCCC via SIPRNET e-mail. Use secure voice if SIPRNET access is not available.

2.4. THRESHOLDS:

2.4.1. A C2 link goes down for more than 15 minutes (with or w/o redundancy)

2.4.2. A video customer is isolated for more than 15 minutes

2.4.3. A feed (video from a UAS to all customers) goes dark for more than 15 minutes

EXAMPLE:

1 CS/CFP COMSPOT (INITIAL, FOLLOW-UP or FINAL) Langley AFB, Va

1. COMPSPOT POC:

Rank/Name: SSgt Doe, Pat Unit/Org: 1 CS/CFP Location: Langley AFB, Va Phone: (312) 574-1111 Other: 574-2222 (STE)

2. OUTAGE DETAILS:

(U) LOCAL TROUBLE TICKET NUMBER:

(U) THIRD PARTY TROUBLE TICKET NUMBER (if applicable): (i.e. I-NOSC, DISA, CITS etc.)

(U) UNSCHEDULED EVENT: (Y,N)

(U) SUBJECT: (BRIEF OUTAGE DESCRIPTION OR EQUIPMENT/SYSTEMS AFFECTED)

(U) CURRENT STATUS: (INDICATE AS INITIAL, FOLLOWUP, OR FINAL)

(U) EXECUTIVE SUMMARY: (SPECIFIC DETAILS)

UAS

Operations

Center

Support

PWS

Solicitation No.

FA4890-09-R-0015

Contract No. FA4890-10-C-0007

APPENDIX

P

COMMUNICATIONS STATUS

AND

COMMUNICATIONS

POSTURE

REPORTS

(U) MISSION IMPACT: (NUMBER OF USERS, FO/GO AFFECTED)

(U) ALTERNATE CAPABILITY: (SELF EXPLANATORY)

(U) FIX ACTION: (DETAILED ACTIONS TAKE TO RESOLVE EVENT)

(U) START TIME: (ZULU)

(U) STOP TIME: (ZULU)

(U) OUTAGE/DOWNTIME DURATION: (SELF EXPLANATORY)

File details come from the government source that posted it. Updated .