Q A_for_Fence.docx

DOCX document 23 KB Posted

Attached to
Fence Demolition Services Federal contract opportunity
Solicitation number
FA4855-15-T-0002
Issued by
Department of the Air Force Special Operations Command

About this file

Questions and Answers 1

View the file

Other files for this federal contract opportunity

Other files attached to Fence Demolition Services, newest first.
File Type Posted
Combo_MAFR_Version2(Amendment).docx DOCX document
Attachment_5_DFARS.pdf PDF
Amendment_002_Summary_of_Changes.docx DOCX document
Q A_for_Fence_2.docx DOCX document
DoubleFence.JPG JPG image
CornerBrace.JPG JPG image
Gate.JPG JPG image
Tumbleweedgate.JPG JPG image
Vegetation.JPG JPG image
FencelineTerrain.JPG JPG image
Combo_Sample_MAFR)Riehn)_NEW.docx DOCX document
Atch_4_Wage_Determination.pdf PDF
Map_Attachement_2.pdf PDF
27_SOAOS_0I_13_(Attachment_3)NOPHONE.docx DOCX document
Att._1PERFORMANCE_WORK_STATEMENT(Complete).docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAFR Fence Demolition Questions and Responses Dated 2 February 2015

1. What type of terrain will the services be performed?

Answer: Most of the terrain is level. There are some elevation changes on the south and west sides of the range of less than 200’.

2. How many strands of barbed wire fence is it 3, 4, 5 or 6?

Answer: Mostly 5-strand with mixtures of 3 and 4-strand fencing

3. Do we have a minimum of 20 feet right of way to work?

Answer: Yes.

4. On the solicitation found on fbo.gov, there is mention of a link to the drawings to be found, but after review I was unable to find any drawings or a link to them.

Answer: The mention of Drawings is in reference to the Map in Attachment 2 of the Performance Work Statement. This document is included in an attachment package to the solicitation on fbo.gov.

5. Does the government have a price magnitude for the completion of the fence project?

Answer: No. This is a service requirement, not a construction project therefore it does not require a price magnitude.

6. What is the height of the fence? Could you please supply pictures of a section of the fence?

Answer: Posts are 6 feet tall. Pictures have been attached to this ammendment.

7. When are the bids due?

Answer: Bids are due by 10:00 am MST 13 February 2015. Bids must be submitted electronically to samuel.riehn.1@us.af.mil, dawn.armant@us.af.mil, and derek.slack@us.af.mil

8. Is there a DRMO expected to be utilized on post for metals? If so will items be expected to be separated?

Answer: Please see Paragraph 1.2 of the Performance Work Statement attached to this solicitation.

9. Can you please send our firm all documents relating to this project to be eligible to submit a quote?

Answer: All documents relating to this project have been uploaded and attached to this solicitation on fbo.gov. We will not be sending documents to any firms.

10. Is there current “real-life” photographs available for the sites requiring demolition?

Answer: Photographs have been attached to this ammendment.

11. Is FA4855-15-T-0002 a replacement to an old MAFR Fence Demolition Solicitation released under Solicitation # FA4855-14-B-0024? If so, was the contract awarded to Waterfall Construction Contract Number FA4855-14-C-0032 no longer valid?

Answer: The contract (FA4855-14-C-0032) that resulted from solicitation FA4855-14-B-0024 has been Terminated for Convenience by the government. Therefore this is a new solicitation for MAFR Fence Demolition for the same requirement. The new solicitation number is FA4855-15-T-0002.

12. When is the deadline to submit more questions?

Answer: The deadline to submit questions is February 10th 2015. All questions must be submitted by email to samuel.riehn.1@us.af.mil, dawn.armant@us.af.mil, and derek.slack@us.af.mil