Attachment 4 SABER Technical Proposal Checklist
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4830-10-R-0002-0002.doc | DOC document | |
| ROOF PLAN.pdf | ||
| QSEU97-0103 Repair Fire Alarms.pdf | ||
| QSEU81-0104.pdf | ||
| FLOOR PLAN B 104.pdf | ||
| 104 Plumbing | — | |
| Amend_1.pdf | ||
| 104 Interion Wall(2).pdf | ||
| Floorplans.pdf | ||
| 104 plumbing | — | |
| EAST ELEVATION.pdf | ||
| North and South Elevation.pdf | ||
| QSEU94-0107 Floor Plan.pdf | ||
| 104 1st floor.pdf | ||
| FIRE PLACE.pdf | ||
| West Elevation.pdf | ||
| 104 2sd floor.pdf | ||
| Upload.zip | ZIP file | |
| Upload1.zip | ZIP file | |
| Attach 1 - WastePlan.xls | XLS spreadsheet | |
| Attach 3 WDs.pdf | ||
| Attach 2 - Disclosure of Lobbying Activities.pdf | ||
| FA4830-10-R-0002 RFP 1 Feb 11.pdf | ||
| Attach 3 WDs.pdf | ||
| Attach 1 - WastePlan.xls | XLS spreadsheet | |
| Upload1.zip | ZIP file | |
| FA4830-10-R-0002 Moody SABER Technical Proposal Checklist Revised.pdf | ||
| Upload.zip | ZIP file | |
| Draft RFP.pdf | ||
| Attach 2 - Disclosure of Lobbying Activities.pdf |
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A B C D E F
SABER TECHNICAL PROPOSAL CHECKLIST
Proposed Contractor:___________________________________________ Date:
YES NO
DOES THE PROPOSED DRAWING PACKAGE CONTAIN THE FOLLOWING:
1 COVER SHEET
2 SITE PLAN
3 FOUNDATION DRAWINGS
4 FLOOR PLAN
5 NOTES
6 STRUCTURAL DRAWINGS
7 ELEVATIONS AND SECTIONS
8 MECHANICAL (HVAC, PLUNBING & FIRE PROTECTION)
9 ELECTRICAL and COMMUNICATIONS
10 Does drawings have NORTH indicated on the drawing?
11 Are the drawings drawn to scale?
12 Is the scale displayed on drawings?
13 Do drawings address items in the Statement of Objectives (SOO)?
14 Is Project information shown on drawings? (Project Name, Project number, Date of Design and ect)
15 Do drawings address asbestos issues?
16 Are Life Safety Codes addressed?
17 Is Handicap accessibly addressed?
18 Was a code analysis completed?
ESTIMATE
19 Is the estimate presented in e-4clicks/RS Means?
20 Are the line items compatible to the SOO?
21 Is Project information shown on estimate? (Project Name, Project number, Type of estimate, Scope of Work Estimators name)
22 Does the estimate line items and quantities reflect what's shown on the drawing?
23 Are the asbestos line items sufficient for this project?
24 Are the line item cost in Contractors estimate RS Means bare cost found in the Master Composite data base?
25 Are the following line items excluded from the Contractors estimate?
Subdivision 01-11 – Summary of Work
Subdivision 01-21 – Allowances
Subdivision 01-31 – Project Management and Coordination
Subdivision 01-32 – Construction Progress Documentation
Subdivision 01-32 – Regulatory Requirements
Subdivision 01-52 – Construction Facilities
Subdivision 01-54-39 – Construction Equipment
26 Are the appropriate Specification Sections indicated?
27 Are minutes of the Scoping Meeting provided?
28 Is a proposed performance time and justification provided?