Attach 4 SABER Tech Prop Checklist 1 Feb 11.pdf

PDF 199 KB Posted

Attached to
SABER - Moody AFB, GA Federal contract opportunity
Solicitation number
FA4830-10-R-0002
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 4 SABER Technical Proposal Checklist

View the file

Other files for this federal contract opportunity

Other files attached to SABER - Moody AFB, GA, newest first.
File Type Posted
FA4830-10-R-0002-0002.doc DOC document
ROOF PLAN.pdf PDF
QSEU97-0103 Repair Fire Alarms.pdf PDF
QSEU81-0104.pdf PDF
FLOOR PLAN B 104.pdf PDF
104 Plumbing —
Amend_1.pdf PDF
104 Interion Wall(2).pdf PDF
Floorplans.pdf PDF
104 plumbing —
EAST ELEVATION.pdf PDF
North and South Elevation.pdf PDF
QSEU94-0107 Floor Plan.pdf PDF
104 1st floor.pdf PDF
FIRE PLACE.pdf PDF
West Elevation.pdf PDF
104 2sd floor.pdf PDF
Upload.zip ZIP file
Upload1.zip ZIP file
Attach 1 - WastePlan.xls XLS spreadsheet
Attach 3 WDs.pdf PDF
Attach 2 - Disclosure of Lobbying Activities.pdf PDF
FA4830-10-R-0002 RFP 1 Feb 11.pdf PDF
Attach 3 WDs.pdf PDF
Attach 1 - WastePlan.xls XLS spreadsheet
Upload1.zip ZIP file
FA4830-10-R-0002 Moody SABER Technical Proposal Checklist Revised.pdf PDF
Upload.zip ZIP file
Draft RFP.pdf PDF
Attach 2 - Disclosure of Lobbying Activities.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A B C D E F

SABER TECHNICAL PROPOSAL CHECKLIST

Proposed Contractor:___________________________________________ Date:

YES NO

DOES THE PROPOSED DRAWING PACKAGE CONTAIN THE FOLLOWING:

1 COVER SHEET

2 SITE PLAN

3 FOUNDATION DRAWINGS

4 FLOOR PLAN

5 NOTES

6 STRUCTURAL DRAWINGS

7 ELEVATIONS AND SECTIONS

8 MECHANICAL (HVAC, PLUNBING & FIRE PROTECTION)

9 ELECTRICAL and COMMUNICATIONS

10 Does drawings have NORTH indicated on the drawing?

11 Are the drawings drawn to scale?

12 Is the scale displayed on drawings?

13 Do drawings address items in the Statement of Objectives (SOO)?

14 Is Project information shown on drawings? (Project Name, Project number, Date of Design and ect)

15 Do drawings address asbestos issues?

16 Are Life Safety Codes addressed?

17 Is Handicap accessibly addressed?

18 Was a code analysis completed?

ESTIMATE

19 Is the estimate presented in e-4clicks/RS Means?

20 Are the line items compatible to the SOO?

21 Is Project information shown on estimate? (Project Name, Project number, Type of estimate, Scope of Work Estimators name)

22 Does the estimate line items and quantities reflect what's shown on the drawing?

23 Are the asbestos line items sufficient for this project?

24 Are the line item cost in Contractors estimate RS Means bare cost found in the Master Composite data base?

25 Are the following line items excluded from the Contractors estimate?

Subdivision 01-11 – Summary of Work

Subdivision 01-21 – Allowances

Subdivision 01-31 – Project Management and Coordination

Subdivision 01-32 – Construction Progress Documentation

Subdivision 01-32 – Regulatory Requirements

Subdivision 01-52 – Construction Facilities

Subdivision 01-54-39 – Construction Equipment

26 Are the appropriate Specification Sections indicated?

27 Are minutes of the Scoping Meeting provided?

28 Is a proposed performance time and justification provided?