Attach 1 - WastePlan.xls

XLS spreadsheet 23 KB Posted

Attached to
SABER - Moody AFB, GA Federal contract opportunity
Solicitation number
FA4830-10-R-0002
Issued by
Department of the Air Force Air Combat Command

About this file

Draft Moody SABER RFP Attachment 1 Waste Management Plan

View the file

Other files for this federal contract opportunity

Other files attached to SABER - Moody AFB, GA, newest first.
File Type Posted
FA4830-10-R-0002-0002.doc DOC document
104 1st floor.pdf PDF
FIRE PLACE.pdf PDF
West Elevation.pdf PDF
104 2sd floor.pdf PDF
ROOF PLAN.pdf PDF
QSEU97-0103 Repair Fire Alarms.pdf PDF
QSEU81-0104.pdf PDF
FLOOR PLAN B 104.pdf PDF
104 Plumbing —
Amend_1.pdf PDF
104 Interion Wall(2).pdf PDF
Floorplans.pdf PDF
104 plumbing —
EAST ELEVATION.pdf PDF
North and South Elevation.pdf PDF
QSEU94-0107 Floor Plan.pdf PDF
Attach 1 - WastePlan.xls XLS spreadsheet
Attach 3 WDs.pdf PDF
Attach 2 - Disclosure of Lobbying Activities.pdf PDF
FA4830-10-R-0002 RFP 1 Feb 11.pdf PDF
Attach 4 SABER Tech Prop Checklist 1 Feb 11.pdf PDF
Upload.zip ZIP file
Upload1.zip ZIP file
FA4830-10-R-0002 Moody SABER Technical Proposal Checklist Revised.pdf PDF
Upload.zip ZIP file
Draft RFP.pdf PDF
Attach 2 - Disclosure of Lobbying Activities.pdf PDF
Attach 3 WDs.pdf PDF
Upload1.zip ZIP file
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Attachment 1SABERWaste Management Report
I. Total Project Waste
Total cost of disposal,From: ___________________
Quantity (tons)Landfill SiteTip fee/tonincluding hauling,Total cost/tonProject: _________________
container rental, tip feesDate: ____________________
II. Alternatives to Landfilling
Type of MaterialQuantityDestination andCost toExpected revenueNetCost ifComparison
(tons)means of transportationhandle and transport& tip fee earningscostlandfilledcost (+) / savings (-)
Examples
Cardboard
Dimensional wood
Beverage containers
Land debris
Concrete
CMU
Asphalt
Metals - all types
Gypsum board
Paint
Carpet
Insulation
Glass
Cast stone
Wood materials
Electric cable
PVC piping
Rubber flooring
Raised flooring
III. Total net cost (+) or savings (_) from all
alternatives to landfilling all project waste
INSTRUCTIONS: Contractors will track and maintain records of materials utilized that contain recycled materials and data for debris that was recycled/removed from the demolition waste stream. The completed form will be submitted to the contracting officer in the contract closeout process.
REFERENCES: Contract clause 52.223-4 and 9; FAR 23 part 4; EPA CPG (EPA Website: EPA.gov); Resource Conservation Recovery Act (RCRA); Executive Order 13101; DoD Green Procurement Strategy (Green Purchasing Program - GPP)

Sheet2

Sheet3

File details come from the government source that posted it. Updated .