Attach 1 - WastePlan.xls
XLS spreadsheet 23 KB Posted
- Attached to
- SABER - Moody AFB, GA Federal contract opportunity
- Solicitation number
- FA4830-10-R-0002
About this file
Attachment 1 Waste Plan
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4830-10-R-0002-0002.doc | DOC document | |
| 104 1st floor.pdf | ||
| FIRE PLACE.pdf | ||
| West Elevation.pdf | ||
| 104 2sd floor.pdf | ||
| Amend_1.pdf | ||
| 104 Interion Wall(2).pdf | ||
| Floorplans.pdf | ||
| 104 plumbing | — | |
| EAST ELEVATION.pdf | ||
| North and South Elevation.pdf | ||
| QSEU94-0107 Floor Plan.pdf | ||
| ROOF PLAN.pdf | ||
| QSEU97-0103 Repair Fire Alarms.pdf | ||
| QSEU81-0104.pdf | ||
| FLOOR PLAN B 104.pdf | ||
| 104 Plumbing | — | |
| Attach 3 WDs.pdf | ||
| Attach 2 - Disclosure of Lobbying Activities.pdf | ||
| FA4830-10-R-0002 RFP 1 Feb 11.pdf | ||
| Attach 4 SABER Tech Prop Checklist 1 Feb 11.pdf | ||
| Upload.zip | ZIP file | |
| Upload1.zip | ZIP file | |
| FA4830-10-R-0002 Moody SABER Technical Proposal Checklist Revised.pdf | ||
| Upload.zip | ZIP file | |
| Draft RFP.pdf | ||
| Attach 2 - Disclosure of Lobbying Activities.pdf | ||
| Upload1.zip | ZIP file | |
| Attach 3 WDs.pdf | ||
| Attach 1 - WastePlan.xls | XLS spreadsheet |
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Attachment 1 | SABER | Waste Management Report | |||||
| I. Total Project Waste | |||||||
| Total cost of disposal, | From: ___________________ | ||||||
| Quantity (tons) | Landfill Site | Tip fee/ton | including hauling, | Total cost/ton | Project: _________________ | ||
| container rental, tip fees | Date: ____________________ | ||||||
| II. Alternatives to Landfilling | |||||||
| Type of Material | Quantity | Destination and | Cost to | Expected revenue | Net | Cost if | Comparison |
| (tons) | means of transportation | handle and transport | & tip fee earnings | cost | landfilled | cost (+) / savings (-) | |
| Examples | |||||||
| Cardboard | |||||||
| Dimensional wood | |||||||
| Beverage containers | |||||||
| Land debris | |||||||
| Concrete | |||||||
| CMU | |||||||
| Asphalt | |||||||
| Metals - all types | |||||||
| Gypsum board | |||||||
| Paint | |||||||
| Carpet | |||||||
| Insulation | |||||||
| Glass | |||||||
| Cast stone | |||||||
| Wood materials | |||||||
| Electric cable | |||||||
| PVC piping | |||||||
| Rubber flooring | |||||||
| Raised flooring | |||||||
| III. Total net cost (+) or savings (_) from all | |||||||
| alternatives to landfilling all project waste | |||||||
| INSTRUCTIONS: Contractors will track and maintain records of materials utilized that contain recycled materials and data for debris that was recycled/removed from the demolition waste stream. The completed form will be submitted to the contracting officer in the contract closeout process. | |||||||
| REFERENCES: Contract clause 52.223-4 and 9; FAR 23 part 4; EPA CPG (EPA Website: EPA.gov); Resource Conservation Recovery Act (RCRA); Executive Order 13101; DoD Green Procurement Strategy (Green Purchasing Program - GPP) |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .