RFI_Response_Sheet.pdf

PDF 151 KB Posted

Attached to
Base Operations Support Services, Avon Park AFR, Florida Federal contract opportunity
Solicitation number
FA4814-16-R-0004
Issued by
Department of the Air Force Air Mobility Command

About this file

Request For Information (RFI) Response Sheet

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Support Services, Avon Park AFR, Florida, newest first.
File Type Posted
3_Appendix_A-5_Target_Maintenance_Historical_Data.pdf PDF
4_Appendix_D_-_Facilities_Systems_Equipment.pdf PDF
7_Pesticide_Product_Summary.pdf PDF
6_Int_Pest_Management_Plan.pdf PDF
5_EESOH-MIS.pdf PDF
2_Appendix_A-Workload.pdf PDF
FA4814-16-R-0004-0003.pdf PDF
9_AF_Real_Property_Report_7115_ASPR.pdf PDF
1_PWS_30_March_2016.pdf PDF
8_AF_Real_Property_Report_7115_ASPQ.pdf PDF
FA4814-16-R-0004-0002.pdf PDF
Sign_In_Sheet.pdf PDF
Avon_Park_Request_for_Information.docx DOCX document
FA4814-16-R-0004-0001.pdf PDF
Attachment_3_Past_Performance_Summary_Sheet_(PPSS).pdf PDF
Attachment_1_PPQ.pdf PDF
Attachment_2_PPI_Tool_Instructions.pdf PDF
Appendix_E_-_Applicable_Publications.pdf PDF
Appendix_B_-_Maps_and_Site_Plans.pdf PDF
Appendix_A_-_Workload.pdf PDF
Appendix_I_-_Minimum_Essential_Level_Vehicles.pdf PDF
Appendix_F_-_Support_Agreements _MOAs_and_Contracts.pdf PDF
Appendix_C_-_GOVERNMENT_FURNISHED_PROPERTY.pdf PDF
FA4814-16-R-0004.pdf PDF
Appendix_H_-_ABBREVIATIONS_and_ACRONYMS.pdf PDF
1_PWS_BOS_Services.pdf PDF
3_Service_Contract_Act_Wage_Determination.pdf PDF
2_QASP_BOS_Avon_Park.pdf PDF
Appendix_D_-_Facilities_Systems_Equip_for_Ops_Maint_Eng.pdf PDF
4_Davis_Bacon_Wage_Determination.pdf PDF
Appendix_G_-_Contractor_Employee_Certifications.pdf PDF
Appendix_J_-_Forms _Reports _Submittals _and_Technical_Letters.pdf PDF
https //www.fbo.gov/utils/view id 4062ba4be1dfcf0903f51bcf7b0ec97e —
DRAFT Appendix I - Minimum Essential Level Vehicles.pdf PDF
DRAFT Appendix F - Support Agreements MOAs and Contracts.pdf PDF
DRAFT Appendix D - Facilities Systems Equip for Ops Maint Eng.pdf PDF
DRAFT Appendix B - Maps and Site Plans.pdf PDF
DRAFT Appendix G - Contractor Employee Certifications.pdf PDF
DRAFT Appendix E - Applicable Publications_Updated.pdf PDF
DRAFT Appendix A - Workload.pdf PDF
DRAFT Appendix H - ABBREVIATIONS and ACRONYMS.pdf PDF
DRAFT Performance Work Statement.pdf PDF
DRAFT Appendix J - Forms Reports Submittals and Technical Letters.pdf PDF
DRAFT Appendix C - GOVERNMENT FURNISHED PROPERTY.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION – FA4814-16-R-0004

Document

Name

Page# Para#, Section

Referenced Text

Question

Response Solicitation 95 General Instructions (d), The proposal acceptance period is specified in Section A of the solicitation.

The offeror shall make a clear statement in Section A of the proposal documentation volume that the proposal is valid through this date.

Will the government provide Section A? Will the government identify what is the proposal documentation volume so offerors know where to state the proposal validity date?

52.212-1, General Instructions (d) revised, removing the reference to Section A and providing “proposal is valid through 31 October 2016”.

Solicitation

PWS

1.7.1

Provide an adequate process to recruit/retain/replace personnel who have the knowledge, experience, training, language ability, and technical expertise/certification/security clearances commensurate with the requirements of the PWS.

iii. Identify key positions and provide position descriptions which identify the required education and experience levels, requisite security clearances, and other qualifications/certifications showing the key individual’s ability to comply with the minimum requirements of the PWS.

Paragraph 1.7.1 in the PWS states during Transition (Phase In) contractor is responsible for obtaining security clearances.

Please clarify where the requirements for security clearances are identified in the RFP.

Will the government confirm security clearances are required, for which positions, and provide the DD254?

PWS- There are no security clearances required for secret or above. NACI is required for all contractor employees.

Solicitation 102 Each offeror is requested to submit the information shown in Attachment 1 for each relevant contract 5 days prior to the date set for receipt of proposals.

Please confirm that only the past performance questionnaires completed by points of contacts (POCs) the offeror has listed as past performance references are due 5 days prior to the date set for receipt of proposals, and no other parts of Volume II are due early.

This is correct, only past performance questionnaires are due 5 days prior to the date set for receipt of proposals.

Solicitation 102 Each offeror is requested to submit the information shown in Attachment 1 for each relevant contract 5 days prior to the date set for receipt of proposals.

Please confirm that the information is due 5 work days (not calendar days) prior to the rest of the proposal.

The days are 5 calendar days.

Solicitation 102 and

Each offeror is requested to submit the information shown in Attachment 1 for each relevant contract 5 days prior to the date set for receipt of proposals.

BASIS OF AWARD: The evaluation team will review the lowest priced offeror’s technical proposal first. …All higher priced proposals will not be evaluated.

Request the government remove the requirement for Past Performance Information be submitted 5 days prior to the proposal due date.

While past performance is not the first area to be evaluated, it takes time to gather the data. We require the information 5 days prior in order to keep the evaluation process moving in a streamlined manner.

Solicitation 104 Part III, Price Proposal/Contract Documents, Representations and Certifications, Offeror is required to fill out an online provision 52.204-8 Annual Representations and Certifications

The solicitation includes 52.212-3, Offeror Representations and Certifications – Commercial Items. Does the Government want the offeror to also complete 52.204-8? If so, please clarify what is meant by filling out an “online provision.”

No. Reference to 52.204-8 removed.

PWS 1.2.3.1 Provide a Contractor CE Program Manager. Is this position different than the Project Whether a separate position would be needed is a business

Page#

Maintain fully trained and qualified professionals, certifications, and licensing.

Manager identified in PWS 4.4 Contractor Personnel?

Please define what certifications and licensing is required.

decision to be made by the offeror. Refer to Appendix H for certifications. If during the course of performing the responsibilities in the contract a certification or license is required it will be a business decision of the offeror to either have his employee obtain or to obtain via sub- contractor for the service.

PWS 4.4.1,

1.6

Under the heading “Project Manager,” a full-time project manager will be on-site…The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available at all times to meet at APAFR with government personnel…

1.6 Performance Evaluation Meetings. The contract

manager shall meet at least weekly with COR and the CO during the first month of the contract

Is the contract manager the same position as the project manager?

No, reference to the contract manager has been changed in the PWS to read project manager in paragraphs 1.6 & 4.4.1.

Solicitation 82 FAR 52.245-2, Government Property Installation Operation Services; para (e) Government property provided under this clause: Attachment 1 Performance Work Statement

Is Attachment 1 PWS the correct reference?

Please clarify.

Yes. Government Property is listed in the PWS and appendices.

PWS 1.2.2.2.

Fire Alarm and Suppression systems Is there a list of buildings having fire alarm systems?

Added to Appendix D

PWS 1.2.2.2.

Fire Alarm and Suppression systems Is there a device count of fire alarm devices per building

Added to Appendix D

PWS 1.2.2.2.

Fire Alarm and Suppression systems Is there a list of extinguishers including size, type, and quantity of each?

Added to Appendix D

PWS 1.2.2.2.

Fire Alarm and Suppression systems Is there a list of building having fire suppression systems?

Added to Appendix D

PWS 1.2.2.2.

Fire Alarm and Suppression systems Is there a list of the type of fire suppression systems per building?

Added to Appendix D

PWS 1.2.2.2.

7.3

Inspections Is the frequency and type of inspections to be performed under NFPA guidelines or UFC per paragraph 1.2.2.2.7.7?

IAW the UFC and NFPA requirements.

Appendix A

Table A-2-2

Workload Estimates There is listed inspections being done quarterly for a quantity of 21; what fire alarm inspection is being required to be performed quarterly?

IAW UFC 3-601-02, Table 2-1

Attachment

3, SCA

Wage Determinati on of 9

Hazardous pay differential IAW the hazardous pay differential, will the Government certify that there is no hazardous condition while working on the ranges or equipment associated with this contract?

Contractor employees will not be required to work under any hazardous conditions.

Appendix C, Governmen t Furnished

Pages 1-13

Unit Acquisition Cost As Unit Acquisition Cost does not clarify whether the value reflects “new” or “used” equipment, would the Government provide clarification through a definition of Unit

Unit Acquisition Cost represents an estimate of the cost of the item as new at the time it was purchased.

Page#

Property Acquisition Cost, or condition reports or date of purchase for GFP?

PWS Section

1.2.7 “Perspective contractors may review the installation’s historical records of pest activity and abatement actions, survey facilities and grounds.”

We request this information be provided to offerors, to include the Integrated Pest Management Plan.

The IPMP will be made available to offerors via www.fbo.gov.

Additionally, this document will exist and be maintained/updated in the APAFR technical library.

Attachment 2, PPI Tool Instructions

Page 1 “Locate the ppi tool link from the all files column on the solicitation’s notice details tab.”

This has not been provided. Provided 3 March 2016 via www.fbo.gov

RFP Page

The solicitation states that PPQs should be emailed to past performance references.

Please clarify whether the portion of the PPQ completed by the offeror should be submitted as hard copies with the proposal.

PPQs should be sent by your references directly back to the Government. There is no requirement for the offeror to submit any portion of the PPQs with their proposal.

RFP Page 96 Under “Page limitations,” it states that all pages will be counted except the cover page and table of contents.

Please confirm whether glossaries and lists of tables and figures will be counted.

Glossaries and lists of tables and figures WILL NOT be counted against page limitations

PWS Section 1.3.4.3

Government Operated/Government Furnished Vehicles; Government Replaced

(GO/GFVGR)

This PWS reference is followed by 1.3.4.5 rather than 1.3.4.4.

Noted. Paragraph 1.3.4.4 inserted as “Reserved”.

RFP Pages 9 and 10 of 112

ITEM NO 0002 and ITEM NO 0002AA Will the government provide a dollar plug number for these CLIN requirements?

The Government will insert these numbers at the time of award.

Offerors do not need to fill in anything for these CLINS.

RFP Page 11 of 112

ITEM NO 0004 Does this CLIN include vehicles and other mobile equipment, such as tractors, etc.?

Yes, CLIN includes vehicles and special purpose equipment requiring registration and/or insurance coverage.

PWS Section 1,7.1.4

“Access to Government computer systems, airfield and secured facilities requires additional national security checks.”

If all contractor employees are required to undergo a National Agency Check with Inquiries, please clarify what “additional security checks” means.

All contractor personnel will only require a NACI. Additional security checks may be physical checking of the employees’ credentials before entry to airfield or secured facilities.

PWS Section 1.2.1.1.

7.5

“The contractor shall develop and operate a computerized hazardous waste tracking system or, if required, and Air Force-approved system.”

Please provide the system that is currently used at APAFR.

The Enterprise Environmental Safety and Occupational Health - Management Information System (EESOH-MIS) will be made available to offerors via www.fbo.gov. Additionally, this document will be available in the APAFR technical library.

PWS Section 1.1

“Repair can be done by replacement depending on the degree of required repairs as determined by Director of Operations (DO) or designated government representative.”

How will the determination to repair or replace a target be made? Is there a limit/estimate on the number of targets to be repaired annually?

Is there a limit/estimate on the dollar amount of repair materials required by the contractor?

Repair or replacement will be at the discretion of the Range Operations Officer or designated government representative based on factors such as the how much the target has been damaged by training activities, visiting/deployed unit feedback/training requirements, and environmental conditions.

The number of targets to be repaired annually is limited by the quantity of target materials - vehicles, shipping containers, and paint listed in para. 1.1.4 of the PWS and the time available to conduct range maintenance listed in para 1.1.2.1 and 1.1.2.2.

An Appendix A-5 listing the historical target complex typical tasks for a year has been added to the PWS workload. The cost of consumables such as, but not limited to welding rods, cutting tips, paint brushes and/or other painting equipment, and screws, are the responsibility of the contractor and shall be included in http://www.fbo.gov/ http://www.fbo.gov/

Page# the firm fixed price.

Appendix D-10

Page 39-41

“(Includes all facilities in Real Property Record AF form 7115 not listed above)”

Is appendix D-10 all inclusive? Please provide

AF7115.

No. The AF Real Property Reports 7115 for APAFR facilities will be made available to offerors via www.fbo.gov.

Additionally, this document will be available in the APAFR technical library and updated as needed by the Real Property Officer throughout the life of the contract.

RFP Page 96 i)

Page

i) Pricing Related Data - All pricing data shall be addressed ONLY in the Price Proposal and Contract Documentation Volumes. Price trade-off information, work estimates, and material kinds and quantities may be used in other volumes only as appropriate for presenting rationale for alternatives or design and trade-off decisions. All pricing information shall be addressed in the Contract Documentation volume, in Section B of the Schedule of the RFP. Information shall be limited to Contract Line Item Number (CLIN) or SubCLIN including unit and extended pricing, as specified in Section B of the RFP.

Price Reasonableness This section is to assist you in submitting pricing data that is required to evaluate the reasonableness of your proposed price. Compliance with these requirements is mandatory and failure to comply may result in rejection of your proposal.

Unbalanced pricing poses an unacceptable risk to the Government and may be a reason to reject an offeror’s proposal. Offers should be sufficiently detailed to demonstrate their reasonableness. The burden of proof for credibility of proposed prices rests with the offeror.

… Price reasonableness will be determined based on a comparison of each offeror’s total evaluated price.

The RFP states Cost or Pricing data is not required due to anticipated sufficient competition. The RFP further states, “All pricing information shall be addressed in the Contract Documentation volume, in Section B of the Schedule of the RFP. Information shall be limited to Contract Line Item Number (CLIN) or SubCLIN including unit and extended pricing, as specified in Section B of the RFP.”

The RFP also states, “Offers should be sufficiently detailed to demonstrate their reasonableness. The burden of proof for credibility of proposed prices rests with the offeror.” But the RFP further states, “Price reasonableness will be determined based on a comparison of each offeror’s total evaluated price.”

Will the Government please clarify what, if any, information offerors should provide in Volume 3 to demonstrate reasonableness, since cost and pricing data are not required at this time.

RFP revised.

Although certified Cost or Pricing data is not required, Offerors should provide Other than Cost or Pricing data in sufficient detail to demonstrate a clear understanding of the requirement.

PWS Page 8- 9 Para.

1.1.1

References to the Range materials needed to support the entire function

Would the government clarify what bidders are to include for costs of all materials, supplies, labor etc. in the FFP amount for range targets?

Repair or replacement will be at the discretion of the Range Operations Officer or designated government representative based on factors such as the how much the target has been damaged by training activities, visiting/deployed unit feedback/training requirements, and environmental conditions.

The number of targets to be repaired annually is limited by the quantity of target materials - vehicles, shipping containers, and paint listed in para. 1.1.4 of the PWS and the time available to conduct range maintenance listed in para 1.1.2.1 and 1.1.2.2.

Page#

An Appendix A-5 listing the historical target complex typical tasks for a year has been added to the PWS workload. The cost of consumables such as, but not limited to welding rods, cutting tips, paint brushes and/or other painting equipment, and screws, are the responsibility of the contractor and shall be included in the firm fixed price.

PWS Page 11, Para.

1.1.5.3

PS-2

The contractor shall inspect and test all target vehicles for the presence of radiological material in instrumentation, weapon sighting devices, and other on-board systems before placing these vehicles on ranges. The contractor will coordinate with the 23 WG Bio-Environmental Engineer (BEE) for the removal, packaging, storage, and disposal of all radiological material.

PS-2 Implement a process to screen incoming target vehicles/materials for radiological and other hazardous materials

AFI 13-212 ACC Sup 1 (4.18.3.1) states that radiological screening will be conducted in coordination with the Installation Radiation Safety Officer. Radiological detection equipment will be operated by appropriately trained personnel.

APAFR Addendum A to AFI 13-212 (1.2.7) states that the APAFR ROO/DO fills the position of the Installation Radiation Safety Officer.

• Will the IRSO be available to support screening upon target receipt and/or prior to performing sanitizing operations?

• Will training on the detection equipment be provided?

A government employee will be available to conduct screening upon target vehicle receipt and/or prior to sanitization. The contractor will not be required to operate the detection equipment so no training will be provided. Paragraph 1.1.5.3 Has been changed to read – “The government shall inspect and test all target vehicles for the presence of radiological material in instrumentation, weapon sighting devices, and other on-board systems before placing these vehicles on ranges. The government will coordinate with the 23 WG Installation Radiation Safety Officer (IRSO) for the removal, packaging, storage, and disposal of all radiological material.”

PWS Page 11-12, Para.

1.1.5.5

The contractor shall ensure that interstitial spaces of storage tanks, boilers, transport trailers, etc., are free of asbestos or asbestos bearing material before placing these items on the range. The contractor shall manage and dispose of any asbestos found during target preparation IAW the APAFR Asbestos Management and Operations Plans.

Should the cost for disposal or remediation of unsuitable targets (i.e., those found with fiberglass, asbestos) be included in the FFP proposal?

Costs for disposal of asbestos and/or fiberglass will not be included in the FFP proposal. The last sentence of para 1.1.5.5 has been changed to read – “The government shall manage and dispose of any suspected asbestos found by the contractor during target preparation IAW the APAFR Asbestos Management and Operations Plans.” Fiberglass will be handled as a solid waste in the refuse program.

PWS Page 41, Para.

1.2.3.2.

3, Environ mental Plannin g

Environmental Planning/National Environmental Policy Act and Environmental Impact Analysis Process (NEPA/EIAP):

Will the government provide workload data associated with NEPA Environmental Planning/National Environmental Policy Act (NEPA) and Environmental Impact Analysis Process (EIAP)?

Workload added to Appendix A-2-1

RFP Attach ment 2, Past Performance Information Tool The government posted 3 files on 17 Feb 2016.

One file is the Past Performance Questionnaire, the 2nd file is the Instructions for the PPI Tool, and the 3rd is the Past Performance Summary Sheet. In the PPI Tool instructions, bidders are directed to the “All Files” column on the Notice Details Tab.

Would the government please provide the PPI Tool for this requirement?

Provided 3 March 2016 via www.fbo.gov

Page#

However, that does not appear on the FBO site.

PWS Pages 20-21;

1.2.2.1.

1.2.1 & Page 43, 1.2.3.2.

4.3.8

The PWS includes Facility Condition Assessments that specify CERL BUILDER methodology and tools.

Section 1.2.3.2.4.3.8 includes annually assessing 20% of facilities and infrastructure.

Is this requirement one in the same? No, Para 1.2.2.1.1.2.1 would be a detailed assessment of the condition of building system components and entered into BUILDER as such. Para 1.2.3.2.4.3.8 is for development of FSRM project programming packages

Appendix G, Contractor Employee Certificatio ns

State Certified Storm Water Management Inspector

(PWS 1.2.3.4.4.5)

The PWS reference for the certification under Programming and Engineering Services does not exist. Please clarify.

Correct reference is 1.2.3.4.13.5

RFP Page 9 of 112

ITEM No. 0002 For CLIN 0002 and option years, will the Government provide a dollar value, and if the materials are cost reimbursable, is the reference to FFP for this CLIN in error?

The Government will insert these numbers at the time of award.

Offerors do not need to fill in anything for these CLINS. The CLIN will be changed to a Cost Reimbursement CLIN instead of a FFP CLIN.

RFP Page 1 Geographic Information Systems Professional (GISP) certification (PWS 1.2.3.6)

The PWS reference for the certification under Programming and Engineering Services does not exist. Please clarify.

Assuming the PWS reference is to Appendix G, Contractor Employee Certifications, the paragraph reference should be paragraph 1.2.3.4.14.3.

Updated Appendix G is provided.

RFP Page 103 of

Organizational Structure Change History Please clarify whether major subcontractors are required to respond to this requirement in

Volume II.

There is no requirement to provide this information for subcontractors, but having this information will assist in determining relevant past performance.

PWS Section 1.2.1.1.

7.5

Hazardous Waste Tracking System Will the Government define the system currently in use and/or Air Force-approved systems?

The Enterprise Environmental Safety and Occupational Health - Management Information System (EESOH-MIS) is the system currently in use and will be made available to offerors via www.fbo.gov. Additionally, this document will be available in the APAFR technical library.

RFP Page 102 of

Part II – Past Performance Information The requirements for past performance information do not reference the Government’s provided Attachment 3 – Past Performance Summary Sheet. Please clarify.

Reference to Attachment 3 will be added

PWS Section 1.2.2.3.

The contractor shall inspect, repair, and maintain road surfaces, bridges, curbs, and gutters, sidewalks, parking lots, drives and driveways, guard rails and parking blocks, paths, and jogging tracks to ensure full life expectancy. Primary access road surfaces include asphalt, crushed concrete and seashell and asphalt millings.

Which bridges require inspection in accordance with the UFC requirements? Are all bridges on a 24 -month interval or have some frequencies been adjusted in accordance with UFC procedures? When was the last inspection for all bridges and when is the next required inspection? Is the cost of the engineering support to perform the required Bridge Inspections included in the FFP or as cost reimbursable?

All listed bridges are on a 24 month cycle and require inspection IAW UFC requirements by designated AF contract.

Last inspection IAW UFC was done in Oct 2014. Next UFC required inspection is due Oct 2016. BOS contractor will need to identify funding requirement to AFIMSC. Any non-UFC inspections of the bridges to determine bridge condition after a storm event or for BUILDER input would be part of the FFP proposal.

Page#

PWS Section s 1.3.1.1 and 1.3.2

Office and Administration Supplies Supply/Fuels

PWS 1.3.1.1 indicates that administration and office supplies are to be ordered through

Supply/Fuels in PWS 1.3.2. Are the Office and Administration supplies under the material reimbursable CLIN or a fixed price item?

Office and Administration supplies are a firm fixed price item.

RFP Page 1, Block

95, para para (o

DELIVER TO

598TH RANGE SQUADRON

AZARD BAKSH

598TH RANGE SQUADRON

29 SOUTH BLVD BLDG 236

AVON PARK AFR FL 33825-9381

TEL: 813-828-7282 FAX:

Receipt of Offers. Offers are due no later than the date/time stated in Block 8 of the SF 1449 to the 6th Contracting Squadron, 2610 Pink Flamingo Ave, Bldg 147, MacDill AFB, FL 33621.

Submission of Proposal: Proposals shall only be accepted if they are delivered by mail or hand carried. All other means of delivery will not be accepted. Proposals can be mailed or hand delivered to:

Christopher Tuck 6th Contracting Squadron 2610 Pink Flamingo Ave, Room 310 MacDill AFB, Florida 33621 Or Adam Stern 6th Contracting Squadron 2610 Pink Flamingo Ave, Room 310 MacDill AFB, Florida 33621

Please confirm the correct delivery address and contact name(s) for proposal.

Page 1 Block 15 is the delivery location for the services of the contract once the award has been made. All documents required to be submitted in response to the solicitation need to be submitted to the address stated on page 95 and 97

RFP Page 58, para

[Offeror to identify the applicable paragraphs at (c) through (p) of this provision that the offeror has completed for the purposes of this solicitation only, if any.) These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer. Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted electronically on ORCA.]

Regarding a newly-formed, unpopulated JV, would this requirement be fulfilled if each JV partner submits their own Reps and Certs, as opposed to Reps and Certs for the JV?

The Reps and Certs for the JV will need to be submitted.

Ensure the JV has complied with the requirements in 13 CFR

RFP Page 95, Para

(d)

The proposal acceptance period is specified in Section A of the solicitation.

RFP Section A (page 104, paragraph 1) does not include this information. Please advise as to the proposal acceptance / validity period.

52.212-1, General Instructions (d) revised, removing the reference to Section A and providing “proposal is valid through 31 October 2016”.

http://www.ecfr.gov/cgi-bin/text-idx?SID=25fcdbfc1fbc62b4db43b8b3d937b505&mc=true&node=se13.1.124_1513&rgn=div8 http://www.ecfr.gov/cgi-bin/text-idx?SID=25fcdbfc1fbc62b4db43b8b3d937b505&mc=true&node=se13.1.124_1513&rgn=div8

Page#

RFP Page

97, Para (n)

Past Performance Information (PPI) Tool. In addition to the CD-R or DVD-R, Offerors must also use the PPI Tool (use latest version from FBO.gov) in order to electronically submit the Past Performance Volume IAW the RFP. Please see Attachment 6 for instructions.

PPI Tool Instructions were found in Attachment

2. Please advise if there is an Attachment 6 with additional instructions.

There is no Attachment 6. Instructions revised to reference Attachment 2, PPI Tool Instructions.

RFP Page 102, PART

II, para

#1, General

Along with the information required in this paragraph, the offeror shall submit a consent letter executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing release of adverse past performance information to the offeror so the offeror can respond to such information. For each identified effort for a commercial customer, the offeror shall also submit a client authorization letter, authorizing release to the Government of requested information on the offeror's performance.

Please confirm the Consent Letter and Client Authorization Letters are not included in the page count of Vol II—Past Performance.

Consent Letters and Client Authorization Letters WILL NOT be counted against page limitations

RFP Page 102, PART

II, para #2, Past Perform ance Report

Each offeror is requested to submit the information shown in Attachment 1 for each relevant contract 5 days prior to the date set for receipt of proposals.

Please confirm this is 5 calendar days as opposed to 5 business days.

The days are 5 calendar days.

RFP Page 102, PART

II, para #2, Past Perform ance Report

Each offeror is requested to submit the information shown in Attachment 1 for each relevant contract 5 days prior to the date set for receipt of proposals.

Please confirm the PPQs (Attachment 1) are the only items due early.

That is correct.

RFP Page 103, para #3

Organizational Structure Change History Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. In many cases, these changes have taken place during the time of performance of relevant past efforts or between conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this acquisition. To facilitate this relevancy determination, include in this proposal volume a "roadmap" describing all such changes in the organization of your company. A pamphlet or other

Please confirm the change history explanation is not included in the page count of Vol II— Past Performance.

Change history explanations WILL NOT be counted against page limitations

Page# commercial document describing such reorganizations may suffice. As part of this explanation, show how these changes impact the relevance of any efforts you identify for past performance evaluation/performance confidence assessment. Since the Government intends to consider past performance information provided by other sources as well as that provided by the offeror(s), your "roadmap" should be both specifically applicable to the efforts you identify and general enough to apply to efforts on which the Government receives information from other sources.

PWS Pages 20-21;

1.2.2.1.

1.2.1 and Page 43, 1.2.3.2.

4.3.8

Facility Condition Assessments - includes Facility Condition Assessments that specify CERL BUILDER methodology and tools used to assess 100% of facilities at least 120 days from completion of BOS contract transition period.

Section 1.2.3.2.4.3.8 includes annually assessing a minimum of 20% of APAFR facilities and infrastructure, completing 100% within 5 years from contract start date.

PWS 1.2.2.1.1.2.1 states bidders shall use BUILDER to assess 100% of facilities at least 120 days from transition completion. PWS

1.2.3.2.4.2.8 states bidders shall use BUILDER for at least 20% of APAFR facilities and infrastructure each year so that 100% is achieved over the 5 years from contract start date? Please clarify which is correct.

Para 1.2.2.1.1.2.1 would be a detailed assessment of the condition of building system components and entered into BUILDER as such. Para 1.2.3.2.4.3.8 is for development of FSRM project programming packages

RFP Pg.

100, Para B

“Engineering Design: The offeror shall provide a detailed technical approach for the design as identified below, as the Prime Contractor, equal to or greater than $300,000, similar scope and magnitude of effort and complexities this solicitation requires.”

“The offeror shall provide a detailed technical approach for DoD Project Design for construction projects of varying disciplines equal to or greater than $300,000 in scope on DoD military installations.”

These two paragraphs are nearly identical.

Should one of these be listed as projects of equal or lesser than $300,000?

No.

Under Subfactor 3:

B. Engineering Design:

1. Refers to any Engineering Design effort meeting the stated criteria.

Under Subfactor 3:

B. Engineering Design:

2. Refers to any Project Design effort meeting the stated criteria on DoD military installations.

RFP Pg.

100, Para C and D

“C. General Project Construction Management:

The offeror shall provide a detailed technical approach for construction management of construction projects, as identified below, as the Prime Contractor equal to or greater than $300,000, similar scope and magnitude of effort and complexities this solicitation requires.”

“D. DoD Project Construction Management: The offeror shall provide a detailed technical approach for construction management for construction

These two paragraphs are nearly identical.

Should one of these be listed as projects of equal or lesser than $300,000?

No.

Under Subfactor 3:

C. General Project Construction Management:

Refers to any construction management effort meeting the stated criteria.

Under Subfactor 3:

D. DoD Project Construction Management:

Refers to any construction management effort meeting the stated criteria on DoD military installations.

Page# projects of varying disciplines equal to or greater than $300,000 in scope on DoD military installations. The Department includes U.S.

Department of the Army, the U.S. Department of the Navy, the U.S. Department of the Air Force, U.S. Marine Corps, and U.S. Coast Guard.

RFP Pg. 97.

Para o)

Submission of Proposal: Proposals shall only be accepted if they are delivered by mail or hand carried. All other means of delivery will not be accepted. Proposals can be mailed or hand delivered…

Please clarify if “mail” means USPS only, or whether any standard commercial carrier

(Fedex, UPS) is acceptable.

Any standard commercial carrier is acceptable.

RFP Pg. 96

Table 2.2

“1 CD-R or DVD-R” With the exception of the pricing Excel files and the PPI tool files, will Adobe .pdf files be acceptable for the CD-R/DVD-R?

Yes.

RFP Pg. 102

Part II Past

Perform ance

Informa tion

Each offeror shall submit a past performance volume with its proposal, containing past performance information in accordance with the format contained in Attachment 1.

Attachment 1 is the Past Performance Questionnaire. Is it the Government’s intent that we provide questionnaires for each contract with just the first section filled in?

No. Per the instructions:

Offerors shall complete Section 1 of the attached Past Performance Questionnaire (Attachment 1) and e-mail it to all points of contacts (POCs) the offeror has listed as past performance references. The POCs listed in the proposal should represent the individuals most knowledgeable about the offeror’s performance on the identified contract or program, such as the following: (1) Contracting Officer’s Technical Representative; (2) Program/Project Manager; (3) Contracting Officer. For commercial contracts, send the questionnaires to the commercial equivalents of these individuals. The POCs will complete the questionnaires and forward them by email directly to the Attention of Christopher Tuck and Adam D.

Stern, RESPONDENTS TO THE QUESTIONNAIRES

SHALL NOT SEND THE COMPLETED INFORMATION

SHEETS BACK TO THE OFFEROR!

Attachment

Pg. 1 Downloading the PPI Tool The PPI Tool can be downloaded by performing the following steps (if you are unable to download the Tool, contact the contracting officer for assistance):

1. Access the FedBizOpps (https://www.fbo.gov/) website.

2. Find the solicitation posting.

3. Locate the “ppi tool” link from the “All Files” column on the solicitation’s “Notice Details” tab .

4. Select the link and save the “ppi tool” to your computer.

There is no link to the PPI tool on the solicitation posting, as indicated by the instructions. Can the Government add a link to the PPI tool?

Provided via www.fbo.gov on 3 March 2016

RFP Pg 103 Relevant Contracts Submit information in accordance with Attachment

There is no “Attachment A: Past Performance Information.” Can the Government please

52.212-1 revised eliminating reference to Attachment A

Page#

A: Past Performance Information on a maximum seven (7) recent contracts… provide this attachment?

RFP 96 of

Maximum 7 contracts for prime and major subcontractors, 3 pages per contract listed

As the PPI tool is required to create the contract references for past performance IAW

Attachment 2 instructions, please clarify whether the three-page limit includes the PPI tools’ “business relationships” along with “past performance.”

The 3-page limit will not include the PPI tools.