MiniMACCSolicitationAmendment.rtf
RTF text file 930 KB Posted
- Attached to
- Mini-Multiple Award Construction Contract Federal contract opportunity
- Solicitation number
- FA4690-08-R-K100
About this file
Mini MACC Solicitation Released
Text of this file
file_0.wmf file_1.wmf file_2.wmf file_3.wmf
FA4690-08-R-K100
Section B - Supplies or Services and Prices
ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
100,000 Each
Basic Year 1 May 08 - 30 Apr 09
FFP
This contract will be utilized to execute a broad range of minor maintenance, repair, and construction projects on real property at Ellsworth AFB, South Dakota (EAFB). The projects will include tasks in a variety of trades such as demolition, excavation, cast-in-place concrete, masonry, structural steel, mechanical (including HVAC), millwork, and other specialty and general contracting work in family housing as well as industrial/office buildings on Ellsworth AFB and Dakota Ridge Government housing located approximately 12 miles southwest of Ellsworth AFB in Rapid City. (NOTE: Extent of work to be accomplished under this contract concerning military family housing on both Ellsworth AFB and Dakota Ridge does not include normal maintenance, repair, painting, heating, air conditioning, some mechanical, etc., which is covered under the Military Family Housing contract.). The minimum guarenteed amount for the life of the contract with or without options exercised is $1,000.00 per contract awarded.
NET AMT
FOB: Destination
QUANTITY
UNIT
UNIT PRICE
AMOUNT
First Option Year 1 May 09 - 30 Apr 10
This contract will be utilized to execute a broad range of minor maintenance, repair, and construction projects on real property at Ellsworth AFB, South Dakota (EAFB). The projects will include tasks in a variety of trades such as demolition, excavation, cast-in-place concrete, masonry, structural steel, mechanical (including HVAC), millwork, and other specialty and general contracting work in family housing as well as industrial/office buildings on Ellsworth AFB and Dakota Ridge Government housing located approximately 12 miles southwest of Ellsworth AFB in Rapid City. (NOTE: Extent of work to be accomplished under this contract concerning military family housing on both Ellsworth AFB and Dakota Ridge does not include normal maintenance, repair, painting, heating, air conditioning, some mechanical, etc., which is covered under the Military Family Housing contract.). The minimum guarenteed amount for the life of the contract with or without options exercised is $1,000.00 per contract awarded.
QUANTITY
UNIT
UNIT PRICE
AMOUNT
Second Option Year 1 May 10 - 30 Apr 11
This contract will be utilized to execute a broad range of minor maintenance, repair, and construction projects on real property at Ellsworth AFB, South Dakota (EAFB). The projects will include tasks in a variety of trades such as demolition, excavation, cast-in-place concrete, masonry, structural steel, mechanical (including HVAC), millwork, and other specialty and general contracting work in family housing as well as industrial/office buildings on Ellsworth AFB and Dakota Ridge Government housing located approximately 12 miles southwest of Ellsworth AFB in Rapid City. (NOTE: Extent of work to be accomplished under this contract concerning military family housing on both Ellsworth AFB and Dakota Ridge does not include normal maintenance, repair, painting, heating, air conditioning, some mechanical, etc., which is covered under the Military Family Housing contract.). The minimum guarenteed amount for the life of the contract with or without options exercised is $1,000.00 per contract awarded.
QUANTITY
UNIT
UNIT PRICE
AMOUNT
Third Option Year 1 May 11 - 30 Apr 12
This contract will be utilized to execute a broad range of minor maintenance, repair, and construction projects on real property at Ellsworth AFB, South Dakota (EAFB). The projects will include tasks in a variety of trades such as demolition, excavation, cast-in-place concrete, masonry, structural steel, mechanical (including HVAC), millwork, and other specialty and general contracting work in family housing as well as industrial/office buildings on Ellsworth AFB and Dakota Ridge Government housing located approximately 12 miles southwest of Ellsworth AFB in Rapid City. (NOTE: Extent of work to be accomplished under this contract concerning military family housing on both Ellsworth AFB and Dakota Ridge does not include normal maintenance, repair, painting, heating, air conditioning, some mechanical, etc., which is covered under the Military Family Housing contract.). The minimum guarenteed amount for the life of the contract with or without options exercised is $1,000.00 per contract awarded.
QUANTITY
UNIT
UNIT PRICE
AMOUNT
Eacht
Fourth Option Year 1 May 12 - 30 Apr 13
This contract will be utilized to execute a broad range of minor maintenance, repair, and construction projects on real property at Ellsworth AFB, South Dakota (EAFB). The projects will include tasks in a variety of trades such as demolition, excavation, cast-in-place concrete, masonry, structural steel, mechanical (including HVAC), millwork, and other specialty and general contracting work in family housing as well as industrial/office buildings on Ellsworth AFB and Dakota Ridge Government housing located approximately 12 miles southwest of Ellsworth AFB in Rapid City. (NOTE: Extent of work to be accomplished under this contract concerning military family housing on both Ellsworth AFB and Dakota Ridge does not include normal maintenance, repair, painting, heating, air conditioning, some mechanical, etc., which is covered under the Military Family Housing contract.). The minimum guarenteed amount for the life of the contract with or without options exercised is $1,000.00 per contract awarded.
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$1,000.00
$100,000.00
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
Basic Year 1 May 2008-30 Apr 2009
This contract will be utilized to execute a broad range of minor maintenance, repair, and construction projects on real property at Ellsworth AFB, South Dakota (EAFB). The projects will include tasks in a variety of trades such as demolition, excavation, cast-in-place concrete, masonry, structural steel, mechanical (including HVAC), millwork, and other specialty and general contracting work in family housing as well as industrial/office buildings on Ellsworth AFB and Dakota Ridge Government housing located approximately 12 miles southwest of Ellsworth AFB in Rapid City. (NOTE: Extent of work to be accomplished under this contract concerning military family housing on both Ellsworth AFB and Dakota Ridge does not include normal maintenance, repair, painting, heating, air conditioning, some mechanical, etc., which is covered under the Military Family Housing contract.). The minimum guarenteed amount for the life of the contract with or without options exercised is $1,000.00 per contract awarded.
SIGNAL CODE: AA
MAX
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
OPTION
First Option 1 May 2009-30 Apr 2010
FFP
This contract will be utilized to execute a broad range of minor maintenance, repair, and construction projects on real property at Ellsworth AFB, South Dakota (EAFB). The projects will include tasks in a variety of trades such as demolition, excavation, cast-in-place concrete, masonry, structural steel, mechanical (including HVAC), millwork, and other specialty and general contracting work in family housing as well as industrial/office buildings on Ellsworth AFB and Dakota Ridge Government housing located approximately 12 miles southwest of Ellsworth AFB in Rapid City. (NOTE: Extent of work to be accomplished under this contract concerning military family housing on both Ellsworth AFB and Dakota Ridge does not include normal maintenance, repair, painting, heating, air conditioning, some mechanical, etc., which is covered under the Military Family Housing contract.). The minimum guarenteed amount for the life of the contract with or without options exercised is $1,000.00 per contract awarded.
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
Second Option 1 May 2010-30 Apr 2011
FFP
This contract will be utilized to execute a broad range of minor maintenance, repair, and construction projects on real property at Ellsworth AFB, South Dakota (EAFB). The projects will include tasks in a variety of trades such as demolition, excavation, cast-in-place concrete, masonry, structural steel, mechanical (including HVAC), millwork, and other specialty and general contracting work in family housing as well as industrial/office buildings on Ellsworth AFB and Dakota Ridge Government housing located approximately 12 miles southwest of Ellsworth AFB in Rapid City. (NOTE: Extent of work to be accomplished under this contract concerning military family housing on both Ellsworth AFB and Dakota Ridge does not include normal maintenance, repair, painting, heating, air conditioning, some mechanical, etc., which is covered under the Military Family Housing contract.). The minimum guarenteed amount for the life of the contract with or without options exercised is $1,000.00 per contract awarded.
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
Third Option 1 May 2011-30 Apr 2012
FFP
This contract will be utilized to execute a broad range of minor maintenance, repair, and construction projects on real property at Ellsworth AFB, South Dakota (EAFB). The projects will include tasks in a variety of trades such as demolition, excavation, cast-in-place concrete, masonry, structural steel, mechanical (including HVAC), millwork, and other specialty and general contracting work in family housing as well as industrial/office buildings on Ellsworth AFB and Dakota Ridge Government housing located approximately 12 miles southwest of Ellsworth AFB in Rapid City. (NOTE: Extent of work to be accomplished under this contract concerning military family housing on both Ellsworth AFB and Dakota Ridge does not include normal maintenance, repair, painting, heating, air conditioning, some mechanical, etc., which is covered under the Military Family Housing contract.). The minimum guarenteed amount for the life of the contract with or without options exercised is $1,000.00 per contract awarded.
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
Fourth Option 1 May 2012-30 Apr 2013
FFP
This contract will be utilized to execute a broad range of minor maintenance, repair, and construction projects on real property at Ellsworth AFB, South Dakota (EAFB). The projects will include tasks in a variety of trades such as demolition, excavation, cast-in-place concrete, masonry, structural steel, mechanical (including HVAC), millwork, and other specialty and general contracting work in family housing as well as industrial/office buildings on Ellsworth AFB and Dakota Ridge Government housing located approximately 12 miles southwest of Ellsworth AFB in Rapid City. (NOTE: Extent of work to be accomplished under this contract concerning military family housing on both Ellsworth AFB and Dakota Ridge does not include normal maintenance, repair, painting, heating, air conditioning, some mechanical, etc., which is covered under the Military Family Housing contract.). The minimum guarenteed amount for the life of the contract with or without options exercised is $1,000.00 per contract awarded.
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) - ALTERNATE I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within identified with each delivery order calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than (negotiated with each delivery order). The time stated for completion shall include final cleanup of the premises.
*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by (per each delivery order). The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
(End of clause)
52.216-18 Ordering. (OCT 1995)
(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from 1 May 08 through 30 April 09.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.
(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
Destination Government Destination Government Destination Government Destination Government Destination Government Destination Government Destination Government Destination Government Destination Government Destination Government
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within (negotiated with each delivery order calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than (negotiated with each delivery order). The time stated for completion shall include final cleanup of the premises.
*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) - ALTERNATE I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within identified with each delivery order calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than (negotiated with each delivery order) The time stated for completion shall include final cleanup of the premises.
*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by (per each delivery order). The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
POP 01-MAY-2008 TO
30-APR-2009
N/A
28 CES/CEOHV - F40903
MIKE EMERSON
8115 SCOTT DRIVE
ELLSWORTH AFB SD 57706
605-385-4197
F40903
POP 01-MAY-2009 TO
30-APR-2010
N/A
(SAME AS PREVIOUS LOCATION)
POP 01-MAY-2010 TO
30-APR-2011
N/A
(SAME AS PREVIOUS LOCATION)
POP 01-MAY-2011 TO
30-APR-2012
N/A
(SAME AS PREVIOUS LOCATION)
POP 01-MAY-2012 TO
30-APR-2013
N/A
(SAME AS PREVIOUS LOCATION)
52.247-34 F.O.B. DESTINATION (NOV 1991)
(a) The term "f.o.b. destination," as used in this clause, means--
(1) Free of expense to the Government, on board the carrier's conveyance, at a specified delivery point where the consignee's facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and
(2) Supplies shall be delivered to the destination consignee's wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the Contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or "constructive placement" as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including "piggyback") is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for "heavy or bulky freight." When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarded for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery, when required, if transfer to truck is required to complete delivery to consignee.
(b) The Contractor shall--
(1)(i) Pack and mark the shipment to comply with contract specifications; or
(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;
(2) Prepare and distribute commercial bills of lading;
(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;
(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;
(5) Furnish a delivery schedule and designate the mode of delivering carrier; and
(6) Pay and bear all charges to the specified point of delivery.
(End of clause)
Section G - Contract Administration Data
CONTRACT ADMINISTRATION
G-1. CONTRACT ADMINISTRATION (IAW FAR 4.000)
This contract will be administered by the 28th Contracting Squadron (28 CONS/LGCB), Ellsworth AFB, SD:
NOTE: IAW DFARS 252.232.7003 Electronic Submission of Payment Requests, Wide Area Work Flow submission of invoices shall take precedence in submitting invoices for payment.
a. INVOICES:
(1) All invoices will be submitted to:
28 CONS/LGCB
1000 Ellsworth St., Suite 1200 Ellsworth AFB SD. 57706-4904
(2) All invoices shall include the following information (as a minimum):
(a) Contractor’s name and address.
(b) Contractor’s phone number.
(c) Date of Invoice.
(d) Contract Number and delivery order number (If applicable).
(e) Description of work.
(f) Payment Statement IAW FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts.
(g) Payment to be made to (Name of Bank).
(h) Point of Contact to be notified encase of a defective invoice.
(i) An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment requested.
(j) A listing of the amount included for work performed by each subcontractor under the contract.
(k) A listing of the total amount of each subcontract under the contract.
(l) A listing of the amounts previously paid to each such subcontractor under the contract.
(m) Previous payments if any.
(n) Retainage withheld on sub-contractor and prime contractor.
(o). Total amount of invoice.
b. ASSOCIATED DOCUMENTS: The following documents shall also be submitted with the copy of the invoice to 28 CONS/LGCB:
(1) Invoice certification that all suppliers and subcontractors have been paid.
(2) AF Form 3065 certified by Government inspector (if applicable).
(3) Stored material invoices with proof of payment (if applicable).
(4) Proof of bond payment (if applicable).
(5) Unit prices by contract line item.
(6) Certified payrolls to include all subcontractors.
(7) Release of Claims on final payment.
Section H - Special Contract Requirements
SPECIAL CONTRACT REQUIREMENTS
H-1. INSURANCE-WORK ON A GOVERNMENT INSTALLATION (IAW FAR 28.306)
Reference FAR clause entitled "Insurance . . ." the Contractor shall, at its own expense, procure and thereafter maintain the following kinds of insurance with respect to performance under the contract.
a. Workmen’s Compensation and Employers Liability Insurance as required by law except that if this contract is to be performed in a State which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such State will be satisfactory. The required Workmen's Compensation insurance shall extend to cover employer's liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.
b. General Liability Insurance. Bodily injury liability insurance in the minimum limits of $500,000 per occurrence shall be required on the comprehensive form of policy.
c. Automobile Liability Insurance. This insurance shall be required on the comprehensive form of policy and shall provide bodily injury liability and property damage liability covering the operation of all automobiles used in connection with the performance of the contract. At least the minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage shall be required.
H-2. CONTRACTORS GUIDE FOR FLIGHTLINE OPERATIONS
a. The Prime Contractor shall keep the Airfield Manager, extension 385-1052 or 385-2861, informed of intended work schedule (daily arrival and departure times), performance strategies, milestones, and status. The contractor will be required to attend the Airfield Construction meeting, normally held each Thursday, at 1:00 p.m., in the Civil Engineer Conference Room located at 2116 Scott Drive
b. The Airfield Manager will be the contractor’s point-of-contact on airfield related issues. Airfield Management Operations will assist with relaying radio instructions or directions.
c. When performing work on the runway or within 100 feet of the runway edge it is mandatory to obtain permission from the control tower. The contractor will stop at the runway hold markings and request permission onto the runway. A flightline driving trained government representative shall escort and maintain contact with the control tower when contractors are working within 100 feet of the runway. The contractor will coordinate 24 hours in advance before working within 100 feet of the runway.
d. The control tower will require the contractor to evacuate all men and equipment from the runway, or within 100 feet of the runway edge, for arriving and departing aircraft traffic, and on all in-flight emergencies.
e. Contractor shall remain outside the 100-foot distance requirement until authorized to return to their work areas (on or next to the runway) by the control tower. This ensures that workers are in a safe environment free from any potential aircraft mishap.
f. It is the contractor’s responsibility to ensure that the radio is operational and that the battery is properly charged.
g. Failure to comply with radio instructions and direction from the control tower can result in the contractor being escorted off the airfield and work suspended until a meeting is established with the contracting office, airfield management, safety, and the contractor.
h. When performing work on or near the runway edge it is imperative that the runway surface remains free from any foreign object damage (FOD), e.g., small pebbles, rocks, and debris, which includes; mud, dirt, metal (pop cans), plastic or paper products. FOD ingested into an aircraft engine can result in an aircraft crash or engine malfunction.
i. The Airfield Manager will establish the contractor’s traffic route to the work site and any required vehicular or excavation staging areas. These routes will be the most direct method possible in order to reduce potential FOD created on taxiways or aprons and to de-conflict aircraft operations with heavy equipment operators. Random travel is not authorized.
j. The contractor is responsible for ensuring drivers and all subcontractor drivers fully understand and comply with the rules outlined in the flightline driver’s regulation. An airfield management representative will ensure all drivers are licensed to drive on the flightline and that all drivers are thoroughly aware of the flightline rules: (Note: Depending on the location of the construction site, drivers may be required to successfully complete a flightline driving examination prior to commencement of work.)
1. Maximum speed limit on the entire flightline is 15 mph.
2. Private owned vehicles must have company logo (magnetic signs/logos are not authorized on the flightline) and a POV pass (issued by an Airfield Management representative).
3. Contractors must have assigned escorts when working in a Restricted Area. Airfield Management will not provide escorts.
4. Drivers will physically inspect and remove FOD from tires, bumpers, and undercarriage of any vehicle that enters the flightline at an Entry Control Point (ECP) or moves from an unimproved surface to a hardened surface anywhere on the airfield. Criteria will be provided in the POV/Contractor Vehicle Inspection Guide (which will be provided to the prime contractor during initial FOD training). The number to the FOD office is 385-2726.
5. Contractors are responsible for cleaning any FOD created on the airfield from either the products hauled or from debris falling off of the vehicle. Airfield Management may require a dedicated cleaning crew at critical aircraft crossing points.
6. Aircraft have right-of-way at all times. Vehicles will be moved to the taxiway edge or onto an aircraft-parking apron (whichever provides the most clearance) to ensure at least a 25-foot clearance distance from an aircraft’s wingtip.
7. Vehicles will not pass in front of or pass a taxiing aircraft. Drivers will remain at a complete stop until the aircraft has passed. Turn off headlights until the aircraft is passed.
8. Before traveling behind a taxiing aircraft, drivers will ensure that there is at least 500-foot clearance.
9. Drivers will not drive closer than 25 feet of a parked aircraft.
10. Drivers will yield to all emergency vehicles. Depending on the type of emergency, personnel may be required to evacuate the work site. Contractors will adhere to the directions given by the Fire Chief or Security Forces.
11. Contractors shall not interfere with aircraft operations or the flying mission.
k. Airfield Management Representative can suspend the contractor’s operation and evacuate all personnel from the airfield for failure to comply with the flightline driving regulation, or for performing work in an unsafe manner.
l. 28 CONS/LGCB will submit a letter to Airfield Management and the FOD Office identifying contractor business name, contract number, project title, performance period, work location, number of vehicles, and license number of each vehicle the contractor will utilize in the performance of work (to include all subcontractors and their vehicles). Prior to the issuance of a flightline pass by Airfield Operations, vehicles shall be inspected by the FOD office.
H-3. PRECONSTRUCTION CONFERENCE SCHEDULE
Any contractor awarded a contract resulting from this solicitation shall be required to attend a pre-construction conference to be held in the Contracting Squadron, Ellsworth AFB SD, at a date and time designated by the Contracting Officer.
H-4. PREPARATION OF MATERIAL APPROVAL SUBMITTALS
The submittals contemplated by the clause entitled "Material and Workmanship" shall be accomplished on and in accordance with instructions pertaining to AF Form 3000, Material Approval Submittal.
H-5. PREPARATION OF PROGRESS SCHEDULES AND REPORTS
The reports contemplated by the clause entitled "Schedules for Construction Contracts" should be accomplished on and in accordance with instructions pertaining to AF Form 3064, Contract Progress Schedule (or a similar contractor generated form containing the same information as the AF Form 3064), and AF Form 3065, Contract Progress Report (or a similar contractor generated form containing the same information as the AF Form 3065) . The AF Form 3064 (or contractor generated form) should be submitted to the Contracting Officer within five (5) calendar days after commencing work or as specified by the Contracting Officer; these will be submitted in original and two copies. After approval/disapproval by the Contracting Officer, two copies shall be retained by the Government and one copy returned to the Contractor. The AF Form 3065 (or contractor generated form) shall be submitted monthly as work proceeds. These reports will be required for all delivery orders/work orders over $100,000 and 60 days performance.
H-6. MATERIAL PAYMENTS
a. Payment for materials stored off site will not be subject to reimbursement.
b. Payment for major, high value materials stored off-site may be considered if sound procedures (such as a bonded warehouse) are established for their accountability and control, subject to the same procedures outlined in "(5)" below.
c. Payment for major high value materials stored on Ellsworth AFB, SD, may be made subject to the following:
(1) Materials to be requested for payment in advance of installation must be shown as a percentage of the work and included on AF Form 3064, Contract Progress Schedule, submitted for approval. In order to properly evaluate this item, a complete breakdown by quantity, item description, and cost for each major, high value item must be furnished with the proposed progress schedule. Once the progress schedule is approved, no changes will be allowed to include additional material for payment.
(2) A joint inventory and inspection of such items approved for payment on the progress schedule must be made by the contractor and the technical representative of the Contracting Officer to ensure that the quantities are valid, the items are as described, and sufficient security measures have been taken to prevent damage or theft.
(3) Although material paid becomes the property of the Government, the contractor remains responsible for all materials delivered and work performed until completion and acceptance of the construction work. The contractor is responsible for safeguarding materials until final inspection and inspection rests.
(4) The contractor must prove he has title to the materials (i.e., paid invoices) and will use them to perform the contract.
(5) When requesting payment for approved materials, the contractor must provide a certificate, substantially as shown below, in addition to submitting paid invoices:
(Contractor's Name) transfers and assigns to Ellsworth AFB all its rights, titles, and interest of every kind and character in and to all of the goods described in the attached List of Materials. Those who have furnished materials or supplied such goods to us have executed a waiver of claim and lien, a copy of which is attached.
(Contractor's Name) acknowledges that, despite transfer of title, until such goods have been delivered to the job site, incorporated into the work, inspected, and accepted, (Contractor's Name) shall remain responsible for:
(a) Cost and expenses of storage, as applicable
(b) Insurance premiums
(c) Deterioration of such goods
(d) Such portion of goods not in accordance with the contract requirements
(Contractor's Name) hereby acknowledges that it has no interest in such goods by virtue of retained possession, and states that it keeps such goods for Ellsworth AFB, SD, and disclaims any claims against such goods for storage cost, for unpaid contract retainage, or for any other reason.
H-7. POLLUTION PREVENTION (P2)
a. In accordance with Air Force Pollution Prevention Strategy, Ellsworth AFB intends to effectively promote pollution prevention by minimizing or eliminating the use of hazardous materials and the release of pollution into the environment. As part of this initiative, contractors shall comply with all federal, state, and local environmental laws, regulations, and guidelines. In addition, the following special requirements shall apply:
(1) The provision at H-8, 5352.223-9000, Elimination of Use of Class I Ozone Depleting Substances
(2) The provision at H-9, Environmental Compliance
b. Contractors are encouraged to participate in the following voluntary programs:
(1) Affirmative Procurement - Purchasing of supplies and services using recycled products (buying green products).
(2) Recycling of waste products to the maximum extent possible.
(3) Energy Conservation.
H-8. ELIMINATION OF USE OF CLASS I OZONE DEPLETING SUBSTANCES (ODS) (As prescribed by AFFARS 5323.890-7 and IAW AFFARS 5352.223-9000)
a. It is Air Force policy to preserve mission readiness while minimizing dependency on Class I Ozone Depleting Substances (ODS), and their release into the environment, to help protect the Earth's stratospheric ozone layer.
(1) Unless a specific waiver has been approved, Air Force procurements:
May not include any specification, standard, drawing, or other document that requires the use of a Class I ODS in the design, manufacture, test, operation, or maintenance of any system, subsystem, item, component, or process; and
(2) May not include any specification, standard, drawing, or other document that establishes a requirement that can only be met by use of a Class I ODS.
b. For the purposes of Air Force policy, the following are Class I ODS:
(1) Halons: 1011, 1202, 1211, 1301, and 2402.
(2) Chlorofluorocarbons (CFCs): CFC-11, CFC-12, CFC-13, CFC-111, CFC-112, CFC-113, CFC-114, CFC-115, CFC-211, CFC-212, CFC-213, CFC-214, CFC-215, CFC-216, and CFC-217, and the blends R-500, R-501, R-502, and R-503.
(3) Other Controlled Substances: Carbon Tetrachloride, Methyl Chloroform, and Methyl Bromide.
c. The Air Force has reviewed the requirements specified in this contract to reflect this policy. Where considered essential, specific approval has been obtained to require use of the following substances:
Substance Application/Use Quantity (lbs) [List each Class I ODS, its applications or use and the approved quantities. If "None," so state.]
d. To assist the Air Force in implementing this policy, the offeror/contractor is required to notify the contracting officer if any Class I ODS not specifically listed above is required in the performance of this contract.
H-9. ENVIRONMENTAL COMPLIANCE (IAW FAR 23.302)
a. HAZARDOUS MATERIAL IDENTIFICATION. The latest version of the Federal Standard No. 313 (Material Safety Data Sheet, Preparation and Submission of) includes criteria for identification of hazardous materials. Hazardous material data (Material Safety Data Sheets (MSDS)) are required:
(1) As specified in the latest version of Federal Standard No. 313 (including revisions adopted during the term of the contract);
(2) For any other material designated by a Government technical representative as potentially hazardous and requiring safety controls.
(3) MSDSs must be submitted by the apparent successful offeror prior to contract award, unless the offeror certifies that the supplies are not hazardous. Failure to provide MSDSs or certificate when requested could result in the offeror being considered non-responsive.
b. HAZMART. The Government (HAZMART personnel) will inventory all chemicals that the contractor brings on to Ellsworth AFB or any property under the control of Ellsworth AFB. Any products that meet the criteria for "Hazardous Waste" must be bar coded and tracked until permanently removed from Government property. The inventory will be performed prior to commencement of work. Criteria for identifying hazardous waste, is contained in Subpart C of 40 CFR, Part 261.
c. SPILL RESPONSE. The contractor will be briefed on Ellsworth AFB spill response procedures at the pre-construction conference. The contractor is responsible to report and promptly cleanup all spills in a manner consistent with current environmental regulations. In the event that it is necessary to utilize Government material, equipment or personnel to clean up a contractor caused spill, the contractor shall be required to reimburse the Government for all associated costs.
d. HAZARDOUS MATERIAL / WASTE MANAGEMENT. The contractor will be briefed on Ellsworth AFB’s Hazardous Material / Waste Management Plan at the pre-construction conference.
H-10. HAZARDOUS MATERIAL HANDLING
a. The contractor shall have approval from the Base Bio-Environmental (BEE) and HAZMART sections prior to purchasing, handling, using, and storing any chemicals, solvents, lubricants, and other products that require Material Safety Data Sheets (MSDS). The contractor shall identify these materials and products on Air Force Form (AF Fm) 3952 - Chemical/Hazardous Material Authorization Request, Process Identification Form, and Shop Disposal Form. The contractor shall provide one copy of the Material Safety Data Sheet (MSDS) for each item to BEE and HAZMART sections for review prior to any chemicals being brought onto Ellsworth AFB (EAFB). The contractor shall maintain one copy of the Material Safety Data Sheets (MSDS) for each hazardous material line item used within the work center.
b. The contractor shall use environmentally safe products when available. The contractor shall submit justification for the use of any Class I Ozone Depleting Substances (ODS). The justification shall include at a minimum: (1) the name of the ODS; (2) the ODS quantity to be used; (3) the frequency of ODS usage; (4) the purpose for using the ODS; and (5) reasons why the ODS cannot be substituted. The contractor shall request waivers for usage of any ODS, and receive approval from the contracting officer in writing prior to using any ODS.
c. The contractor shall ensure all employees complete the local Air Force Hazardous Communication, HAZMART, and Hazardous Waste training. The government will provide training for the local Air Force programs that were mentioned above at no cost to the contractor. Unless otherwise stated in the specifications, the contractor shall provide all other employee training as required in the performance of this contract at no cost to the government. The contractor shall appoint a primary and alternate HAZMART and Hazardous Waste monitor. Monitors shall track hazardous material usage and report consumption data weekly to HAZMART. Monitors are responsible for training all personnel within work center regarding HAZMART procedures. The contractor shall ensure HAZMART Tracking Labels are placed on each hazardous material container maintained within work center and complete Hazardous Material Inventory Sheet immediately upon receipt of new chemicals, products, or materials. The contractor shall submit inventory sheets to HAZMART as required.
d. The contractor shall immediately remove and properly dispose of (in coordination with the contracting officer) any item considered excess by any of the following designated government officials: (in order of precedence) the 28th CES/CC (BCE), the Chief of the 28 CES/CEV Flight, the 28 CES Hazardous Waste Manager, the 28th Supply HAZMART Manager, and the Base Bio-Environmental Engineer.
e. Limit radioactive material (RM) use consistent with AF needs. No items shall remain for AF disposal. Plated or encapsulated sources must meet ANSI or ASTM standards. All of the following should be provided to the base Radiation Safety Officer (RSO) at the Bioenvironmental Engineering Flight, 28 MDOS/SGOBE, 30 calendar days prior to use of RM on base:
(1) A copy of the NRC license or the agreement state license and NRC Form 241. [Reiterated in the EAFB Supplement to AFI 48-101, para A11.3.6.4]
(2) Brief description of proposed activities.
(3) Name, local address, and telephone number for responsible local representative and for the contractors RSO.
(4) Inclusive dates of RM use on base.
(5) Acknowledgment that the installation RSO can make periodic or unannounced checks to ensure contract personnel follow safety requirements to prevent exposures to AF personnel and avoid contamination. In addition, the installation RSO can suspend contractor operations believed to be unsafe.
H-11. TAXES
It is the responsibility of contractors, particularly out of state contractors, to investigate the South Dakota state sales, use, and excise taxes. It is highly recommended that you contact the South Dakota Department of Revenue, Rapid City Regional Office, 4447 S. Canyon Rd., Suite 6, Rapid City SD 57702-1889. Telephone: 605-394-2332 for information. As a reminder, the contract price includes all applicable federal, state, and local taxes and duties as stated in Contract Clause titled Federal, State, and local Taxes.
H-12. UTILITIES
The following utilities will be furnished at the job site at no cost to the contractor (Check all that apply):
X Electricity X Water
Natural Gas
H-13. BASE CIVIL ENGINEER WORK CLEARANCE REQUEST (AF FORM 103), “DIGGING PERMIT.” (if applicable)
1. Digging Permits: The contractor will be responsible for coordinating a government supplied, Base Civil Engineer Work Clearance Request (AF Form 103) prior to performing digging of any type. The contractor shall process the digging permit by coordinating with and obtaining signatures from responsible representatives of the organizations listed on the AF Form 103 prior to obtaining final approval from the Air Force Base Civil Engineer or his approved representative. The area requested for clearance for each individual permit shall be limited to a maximum of two (2) weeks production for an individual permit. The contractor will be given assistance, by the government, in the execution of the initial two (2) Work Clearance Requests. Thereafter, government assistance will be limited to an as-needed basis in the event of unusual circumstances. It will be the contractor’s responsibility to coordinate the completion of the necessary AF Form 103 and arrange to have existing utilities located as indicated on the completed form, prior to the beginning of digging operations in the individual areas. This coordination is anticipated to take approximately three (3) working days to complete per request, and may require coordination with as many as twenty (20) individuals located on or near the base. A blank copy of the AF Form 103 is available fromhttp://www.e-publishing.af.mil/forms/formlist.asp?puborg=AF&series=0100-0199 . Any unusual delay in obtaining approval from any particular organization will be reported immediately to the Chief of Construction Management.
a. Utility Staking Requirements: The contractor shall layout and mark his intended utility routing before calling for field coordination by utility personnel. This shall be done a minimum of five (5) working days in advance of when digging is expected to begin. Once all responsible utility representatives have field located crossover and/or interference points between the new utility route and existing utilities, they will sign off on the digging permit to signify completion of the field coordination of the digging permit. The permit must then be presented to Civil Engineering Construction Management for final coordination before digging in the area represented by the digging permit may begin. Any utility service markers or markings established by the utility representatives must be maintained by the contractor through the completion of the digging operations.
b. Digging Operations: Digging near established interference or crossover points shall be done by hand, five (5) feet either side of the point along the intended route, in order to prevent disturbing the existing utility. If the existing utility is uncovered in the new excavation, it shall be protected from damage and movement while in the open excavation and during backfill. The contractor shall be responsible for the repairs and associated costs for repairs of any utility damaged by construction, whose location was made known to the contractor.
2. UTILITY OUTAGES: The contractor shall be responsible for coordination of all utility outages at individual facilities. This will include execution of a government-furnished utility outage form which must be reviewed and signed by representatives of all appropriate base organizations prior to approval by the Contracting Officer for the outage. The contractor will be provided a list of building managers and other appropriate points of contact and will be given assistance by the Government, in the execution of the initial two (2) outage forms. Thereafter, government assistance in the execution of the outage clearances will be limited to an “as needed” basis, in the event of unusual circumstances. It shall be the contractor’s responsibility to initiate and coordinate utility outage forms. Coordination of the outage form must be completed a minimum of fourteen (14) calendar days, prior the requested outage date, and require coordination with as many as twenty (20) individuals located on or near the base. A blank copy of the utility outage form is available from Civil Engineering. Any unusual delay in obtaining clearance from any particular organization will be reported immediately to the Contracting Officer’s representative for assistance.
Water service interruptions to the users shall be limited to one day between the hours of 8:30 a.m. and 4:30 p.m. unless otherwise approved by the Contracting Officer.
3. WELDING PERMIT. Contractor must obtain a welding permit from base Fire Department Technical Services prior to any work utilizing an open flame.
H-14. VENDOR INSTRUCTIONS FOR ONLINE REPRESENTATIONS AND CERTIFICATIONS APPLICATION (ORCA) VENDOR INSTRUCTIONS.
1. Prepare for registration:
a. Before you can enter ORCA you must:
(1) Have an active registration in Central Contractor Registration (CCR)
(2) Have the MPIN from your active registration
(3) Know your DUNS number
b. Registration in CCR: Before entering ORCA you must have an active registration in CCR. To determine if you have an active registration visit CCR’s homepage at www.ccr.gov and click on “Search CCR” found on the left side of your screen. If you do not have an existing active registration in CCR then complete one at the same website before beginning your ORCA records. Reminder: There is no cost involved and it should take approximately 30- 45 minutes to finish and submit.
c. Marketing Partner Identification Number (MPIN): The Marketing Personal Identification Number (MPIN) is a 9-digit code containing at least one alpha character and one number (no special characters or spaces). The MPIN is created, by you, in your company’s CCR record and acts as a password for other various government systems, including ORCA. The MPIN is the last data field in the “Points of Contact” section of the CCR registration. Once you’ve entered your new MPIN into CCR, it will take 24-48 hours to update. After that, you can begin your registration in ORCA. Go to www.ccr.gov if you need more information on setting up your MPIN.
d. *Data Universal Numbering System (DUNS) Number: The Data Universal Numbering System (DUNS) number is a unique nine-character identification number provided by the commercial company Dun & Bradstreet (D&B). Call D&B at 1-866-705-5711 if you do not have a DUNS number. The process to request a DUNS number takes about 10 minutes and is free of charge. If you already have a DUNS number, the D&B representative will advise you over the phone.
2. How to Enter Your Application:
a. If you are familiar with the current Representations and Certifications this application should take no more that 20 – 30 minutes to complete.
(1) Start at www.bpn.gov/orca
(2) Enter your DUNS number and MPIN, click “Submit.” Please note that after 20 minutes of inactivity on one page your registration will time out and all data will be lost. Reminder: The MPIN takes 24-48, after registration in CCR, to be updated in ORCA.
(3) If you entered a valid DUNS number/MPIN combination your existing information from CCR is pulled and displayed for your review.
(4) Review the displayed CCR information. If correct, click “Continue.” If the CCR data is incorrect then visit www.ccr.gov and update your registration. Reminder: updates to CCR take 24-48 hours to complete and be displayed on ORCA.
(5) Enter your ORCA POC. Click “Continue.”
(6) Questionnaire begins. All questions must be answered in order to continue. Click “Continue” when finished.
| (1) In any questions that requires text to be entered be sure to click “Add” so the information will saved in the questionnaire. |
| (2) In a few places throughout the questionnaire, you may find questions are marked with ‘Reserved’. As a result of certain company information provided in your CCR record the question normally asked is no longer applicable to you. |
(3) Review your answers by reading your information in context of the full FAR provisions. If you would like to make any changes click on the check box or ‘return to questionnaire’ to be brought back to the original question. When finished making the changes click “Continue” to get finish reviewing the full provisions. Remember to review and click the check boxes on the read-only clauses of 52.203-11, 52.227-6, and 52.222-38. These are the first three clauses on the review page.
(4) When satisfied with all your answers, scroll to the bottom of the screen and be sure to certify that your answers are true by clicking the time/date stamp check box. When finished, click “Submit Certification.”
(5) If desired, download a PDF copy of your completed Reps and Certs record for you files.
This is the start of the file's text. The full file is on GovTribe.
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment0002.pdf | ||
| Amendment0001.pdf | ||
| Attachment4.rtf | RTF text file | |
| TaskOrder.doc | DOC document | |
| Attachment3.rtf | RTF text file | |
| LiftsTechOrder35D5-3-2-1.pdf | ||
| LiftsTechOrder35D5-3-2-4.pdf | ||
| SOW.doc | DOC document | |
| LiftsTechOrder135D5-3_2_1.pdf | ||
| Attachment1Mini-MACCGeneralandEnvironmentalProvisions-11Feb08.do | — | |
| Atch15toConstructionAcquisitionPlan-PastPerformanceQuestionnaire | — | |
| Attachment13NAFProvisions.pdf | ||
| MiniMACCSolicitation.rtf | RTF text file | |
| attachment6.rtf | RTF text file | |
| attachment7.rtf | RTF text file | |
| attachment5.rtf | RTF text file | |
| attachment2.rtf | RTF text file | |
| BidScheduleVehicleLiftsandGov'tEstimateBidSchedule.doc | DOC document |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .