FA4659-R-15-0003 SF30 Amendment 0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA465915R0003-Amendment_0005.pdf | ||
| FA465915R0003-Amendment_0003.pdf | ||
| FA465915R0003-Amendment_0002.pdf | ||
| FA4659-15-R-0003-0001 _SF_1442_Conformed_Solicitation.pdf | ||
| FA4659-15-R-0003-0001 _SF_30_Amendment.pdf | ||
| FA465914R0003-Financial_Institution_Reference_Sheet.pdf | ||
| FA465915R0003-Drawings.pdf | ||
| FA465915R0003-SF1442_Solicitation.pdf | ||
| FA465915R0003-Solicitation_Cover_Letter.pdf | ||
| FA465915R0003-Climatological_Summary_Data.pdf | ||
| FA465915R0003-Past_and_Present_Performance_Questionnaire.pdf | ||
| FA465915R0003-Schedule_of_Material_Submitals.pdf | ||
| FA465915R0003-_Technical_Specifications.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F2A3E15055A001 JFSD201215
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment to solicitation FA4659-15-R-0003 Maintain Airf ield Striping is to:
A. Provide answ ers to contractor questions.
B. The proposal due date shall be extended to 20 May 2015
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-May-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4659-15-R-0003
X 9B. DATED (SEE ITEM 11)
09-Apr-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-May-2015
CODE
319 CONTRACTING FLIGHT
575 TUSKEGEE AIRMEN BLVD
GRAND FORKS AFB ND 58205 6436
FA4659 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4659-15-R-0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
ANSWERS TO QUESTIONSS
1. Is there a possibility of further clarification of work scope inside of Hangars? (Surface prep, removal, marking, void repairs?)
Ensure existing paint is not flaking and clean surface to be painted. Paint can be placed on existing surface. Mark as shown on the drawings. The scope of the work inside the hangars is to paint the markings on the floor, as depicted in the drawings. This is item 2.3 of the Technical
Specification document.
2. Can you please clarify the intent for complete removal?
Certain markings conflict with each other, the intent is to remove conflicting markings.
See 3.3 - "Removal of marking shall be as complete as possible without damage to the surface.
Aggregate shall not be exposed by the removal process. After the markings are removed, the cleaned pavement surfaces shall exhibit adequate texture for remarking as specified in paragraph
SURFACE PREPARATION. Demonstrate removal of pavement marking in an area designated by the Contracting Officer. The demonstration area will become the standard for the remainder of the work."
3. Can you please clarify the types of barricades and signs desired and the extent of the closure requirements?
Barricades do not need to be used on the airfield. Barricades may need to be used around the hangars to ensure they are not disrupted before fully dry. Barricades need to be lighted.
Barricades to be construction barrels with rope and lights, to keep people out of the general area while the paint dries. The closure requirements are to coordinate with Base Operations (319
OSS) to work around flying schedules to ensure adequate dry time.
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 14-May-2015 02:00 PM to 20-May-2015 02:00 PM.