Amendment 0001 to FA4659-15-R-0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA465915R0003-Amendment_0005.pdf | ||
| FA465915R0003-Amendment_0004.pdf | ||
| FA465915R0003-Amendment_0003.pdf | ||
| FA465915R0003-Amendment_0002.pdf | ||
| FA4659-15-R-0003-0001 _SF_1442_Conformed_Solicitation.pdf | ||
| FA465915R0003-_Technical_Specifications.pdf | ||
| FA465915R0003-Climatological_Summary_Data.pdf | ||
| FA465915R0003-Past_and_Present_Performance_Questionnaire.pdf | ||
| FA465915R0003-Schedule_of_Material_Submitals.pdf | ||
| FA465915R0003-SF1442_Solicitation.pdf | ||
| FA465915R0003-Solicitation_Cover_Letter.pdf | ||
| FA465914R0003-Financial_Institution_Reference_Sheet.pdf | ||
| FA465915R0003-Drawings.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F2A3E15055A001 JFSD201215
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment to FA4659-15-R-0003 is to correct the extended description for CLIN 0002, CLIN 0003 , CLIN 0006 and CLIN 0007.
See SF30 Block 14 for summary of changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Apr-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4659-15-R-0003
X 9B. DATED (SEE ITEM 11)
09-Apr-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Apr-2015
CODE
319 CONTRACTING FLIGHT
575 TUSKEGEE AIRMEN BLVD
GRAND FORKS AFB ND 58205 6436
FA4659 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4659-15-R-0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0002
The CLIN extended description has changed from Airfield Painting, Non-Reflective - Line item includes costs and workassociated with airfield non-reflective painting, to include but not limitedto surface preparation, painting, masking and layout. to Airfield Painting, Reflective - Line item includes costs and work associated with airfield reflective painting, to include but not limited to surface preparation, painting, masking and layout..
CLIN 0003
The CLIN extended description has changed from Airfield Restricted Area Warning Pavement Markings
- Line itemincludes costs and work associated with restricted area warning pavement markings, to include but not limited to surface preparation,painting, masking and layout. to Airfield Painting, Non-Reflective - Line item includes costs and workassociated with airfield non-reflective painting, to include but not limitedto surface preparation, painting, masking and layout..
CLIN 0006
The CLIN extended description has changed from Airfield Sandblasting Existing Markings - Line item includes all costs associated with airfield sandblasting to remove the existing pavement markings, to include but not limited to the sandblasting, sweeping/vacuuming and cleaning up of all FOD generated as part of the removal process. to Airfield Water Blasting Existing Markings - Line item includes all costs associated with airfield water blasting to remove the existing pavement markings, to include but not limited to water-blasting, sweeping/vacuuming and cleaning all FOD generated as part of the removal process. This work will take place on the main runway and consist of removing the existing markings to 10 ft. past the edgelines.
CLIN 0007
The CLIN extended description has changed from Airfield Construction Limits Signs and Barricades -
Line itemncludes costs and work associated with airfield construction limit sign and barricades, to include but not limited to all coordination, planning, preparation, materials, labor, and equipment equired to implement and maintain the approved signage and barricades. to Airfield Construction Limits Signs and Barricades - Line item includes costs and work associated with airfield construction limit sign and barricades, to include but not limited to all coordination, planning, preparation, materials, labor, and equipment required to implement and maintain the approved signage and barricades.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .