F2A3E14115A001 JFSD200143/JFSD9499
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment to solicitation FA4659-14-R-0011, Repair Communication Squadron Headquarters Building 314, is to:
A) Answ er questions in response to the soliciation.
B) Add Fire supression as-built draw ings and the Asbetos and Lead Report to section J as a seperate external attachment.
C) Replace the entirety of Section J of the SF 1442 Solicitation w ith the attached section J.
See Summanry of Changes
1. CONTRACT ID CODE PAGE OF PAGES
J 1 20
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Jul-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4659-14-R-0011
X 9B. DATED (SEE ITEM 11)
03-Jun-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Jul-2014
CODE
319 CONTRACTING FLIGHT
575 TUSKEGEE AIRMEN BLVD
GRAND FORKS AFB ND 58205 6436
FA4659 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
FA4659-14-R-0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
ATTACHMENTS
LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
ITEM # of Pages
1. Schedule of Drawings 4
2. Technical Specification Table of Contents 3
3. Building Wage Decision ND140003, Dated 01/03/2014 4
4. Highway Wage Decision ND140002, Dated 01/10/2014 7
LIST OF EXTERNAL ATTACHMENTS
1. JFSD200143 A/B & JFSD949951 A/B/C 1198
Technical Specifications
2. JFSD200143 A/B & JFSD949951 A/B/C 145
Drawings
3. JFSD200143 A/B & JFSD949951 A/B/C 53
Material Submittal Schedule
4. Climatological Summary for Grand Forks AFB, ND 5
5. Waiver Green Procurement Form 1
6. Past Performance Questionnaire 5
7. Financial Institution Reference Sheet 1
8. Asbestos and lead Report 47
9. Fire Suppression As Built Drawings 4
SCHEDULE OF DRAWINGS
Reference Number Drawing Name Sheet # Date
G-001 Title Page and Drawing Index 1 5/15/13 G-002 Project Phasing and Staging 2 5/15/13 C-001 Location Plan and Vicinity Map 3 5/15/13 C-002 Legend and General Notes 4 5/15/13 C-100 Existing Site Plan 5 5/15/13 C-101 Demolition Site Plan 6 5/15/13 C-102 Site Plan 7 5/15/13 C-103 Site Layout Plan 8 5/15/13 C-104 Grading and Drainage Plan 9 5/15/13 C-105 Erosion and Sediment Control Plan 10 5/15/13 C-106 Utility Plan 11 5/15/13 C-300 Profiles and Schedule 12 5/15/13 C-400 Enlarged Plan – Sidewalks and Entry 13 5/15/13 C-500 Standard Civil Details Sheet 1 14 5/15/13 C-501 Standard Civil Details Sheet 2 15 5/15/13 C-502 Standard Civil Details Sheet 3 16 5/15/13 C-503 Standard Civil Details Sheet 4 17 5/15/13 L-100 Overall Landscape Site Plan 18 5/15/13 L-101 Landscape Plan 19 5/15/13 L-102 Landscape Plan 20 5/15/13 L-500 Landscape Notes, Details & Plant Schedule 21 5/15/13 S-001 Structural Legends and Notes 22 5/15/13 S-110 Foundation Plan Demolition 23 5/15/13 S-111 Foundation Plan 24 5/15/13 S-112 Slab Plan - Demolition 25 5/15/13 S-113 Slab Plan 26 5/15/13 6/25/14 S-114 Roof Framing Plan Demolition 27 5/15/13 S-115 Roof Framing Plan 28 5/15/13 6/25/14 S-500 Structural Details Sheet 1 29 5/15/13 S-501 Structural Details Sheet 2 30 5/15/13 S-502 Structural Details Sheet 3 31 5/15/13 S-503 Structural Details Sheet 4 32 5/15/13 A-100 Orentation Plan 33 5/15/13 6/25/14 A-110 Floor Plan – Area A - Demolition 34 5/15/13 6/25/14 A-111 Floor Plan – Area A 35 5/15/13 6/25/14 A-112 Reflected Ceiling Plan – Area A 36 5/15/13 6/25/14 A-113 Roof Plan – Area A - Demolition 37 5/15/13 A-114 Roof Plan – Area A 38 5/15/13 A-120 Floor Plan – Area B - Demolition 39 5/15/13 A-121 Floor Plan – Area B 40 5/15/13 6/25/14 A-122 Reflected Ceiling Plan – Area B 41 5/15/13 6/25/14
A-123 Roof Plan – Area B - Demolition 42 5/15/13 A-124 Roof Plan – Area B 43 5/15/13 A-130 Floor Plan – Area C – Demolition 44 5/15/13 A-131 Floor Plan – Area C 45 5/15/13 A-132 Reflected Ceiling Plan – Area C 46 5/15/13 A-133 Roof Plan – Area C - Demolition 47 5/15/13 A-134 Roof Plan – Area C 48 5/15/13 A-200 Exterior Elevations Sheet 1 49 5/15/13 A-201 Exterior Elevations Sheet 2 50 5/15/13 A-300 Wall Sections Sheet 1 51 5/15/13 A-301 Wall Sections Sheet 2 52 5/15/13 A-302 Wall Sections Sheet 3 53 5/15/13 A-303 Wall Sections Sheet 4 54 5/15/13 A-400 Enlarged Plans and Details Sheet 1 55 5/15/13 A-401 Enlarged Plans and Details Sheet 2 56 5/15/13 A-402 Enlarged Plans and Details Sheet 3 57 5/15/13 A-403 Enlarged Plans and Details Sheet 4 58 5/15/13 A-404 Enlarged Plans and Details Sheet 5 59 5/15/13 A-405 Enlarged Plans and Details Sheet 6 60 5/15/13 A-406 Enlarged Plans and Details Sheet 7 61 5/15/13 A-407 Enlarged Plans and Details – Exterior 62 5/15/13 Dumpster Enclosure A-500 Wall Types 63 5/15/13 A-501 Door and Frame Details 64 5/15/13 A-502 Window Frame Details 65 5/15/13 A-600 Room and Door Schedules 66 5/15/13 6/25/14 A-601 Room Sign Schedules 67 5/15/13 M-001 Mechanical Legends 68 5/15/13 M-110 HVAC Plan – Area A – Demolition 69 5/15/13 M-111 HVAC Plan – Area A 70 5/15/13 6/25/14 M-112 Piping Plan – Area A – Demolition 71 5/15/13 M-113 Piping Plan – Area A 72 5/15/13 6/25/14 M-114 Plumbing Plan – Area A – Demolition 73 5/15/13 M-115 Plumbing Plan – Area A 74 5/15/13 6/25/14 M-116 Mechanical Roof Plan – Area A 75 5/15/13 M-120 HVAC Plan – Area B – Demolition 76 5/15/13 M-121 HVAC Plan – Area B 77 5/15/13 M-122 Piping Plan – Area B – Demolition 78 5/15/13 M-123 Piping Plan – Area B 79 5/15/13 M-124 Plumbing Plan – Area B – Demolition 80 5/15/13 M-125 Plumbing Plan – Area B 81 5/15/13 M-126 Mechanical Roof Plan – Area B 82 5/15/13 M-130 HVAC Plan – Area C – Demolition 83 5/15/13 M-131 HVAC Plan – Area C 84 5/15/13 M-132 Piping Plan – Area C – Demolition 85 5/15/13 M-133 Piping Plan – Area C 86 5/15/13
M-500 Mechanical Details 87 5/15/13 M-501 Mechanical Enlarged Plan, Sections and 88 5/15/13 Details M-600 Piping Riser Diagram – Area A 89 5/15/13 M-601 Piping Riser Diagram – Area B Demolition 90 5/15/13 M-602 Piping Riser Diagram – Area B 91 5/15/13 M-610 HVAC Air Flow and Controls Diagram 92 5/15/13 Sheet 1 M-611 HVAC Air Flow and Controls Diagram 93 5/15/13 Sheet 2 M-612 HVAC Piping Diagram 94 5/15/13 M-613 HVAC Sequence of Operations 95 5/15/13 M-620 Mechanical Schedules – Sheet 1 96 5/15/13 M-621 Mechanical Schedules – Sheet 2 97 5/15/13 F-001 Line Safety Narrative and Legend 98 5/15/13 F-002 Fire Alarm/Mass Notification General 99 5/15/13 Notes, Legend, and Matrix F-003 Sprinkler General Notes, Legends and 100 5/15/13 Details F-100 Fire Safety – Overall Plan 101 5/15/13 6/25/14 F-110 Fire Alarm/Mass Notification Plan Area A 102 5/15/13 6/25/14 F-111 Fire Suppression Plan – Area A 103 5/15/13 6/25/14 F-120 Fire Alarm/Mass Notification Plan Area B 104 5/15/13 6/25/14 F-121 Fire Suppression Plan – Area B 105 5/15/13 6/25/14 F-130 Fire Alarm/Mass Notification Plan Area C 106 5/15/13 F-131 Fire Suppression Plan – Area C 107 5/15/13 E-100 Electrical Legends 108 5/15/13 E-100 Electrical Site Plan – Demolition 109 5/15/13 E-101 Electrcial Utility Plan 110 5/15/13 E-102 Electrcial Sight Lighting Plan 111 5/15/13 E-103 Building 314 Existing Grounding Plan 112 5/15/13 E-110 Lighting Plan – Area A – Demolition 113 5/15/13 E-111 Lighting Plan – Area A 114 5/15/13 6/25/14 E-112 Power Plan – Area A – Demolition 115 5/15/13 E-113 Power Plan – Area A 116 5/15/13 6/25/14 E-114 Systems Plan – Area A – Demolition 117 5/15/13 E-115 Systems Plan – Area A 118 5/15/13 6/25/14 E-116 Lighting Protection Plan – Area A – 119 5/15/13 Demolition E-117 Lighting Protection Plan – Area A 120 5/15/13 E-118 Electrcial Roof Plan – Area A 121 5/15/13 E-120 Lighting Plan – Area B – Demolition 122 5/15/13 E-121 Lighting Plan – Area B 123 5/15/13 6/25/14 E-122 Power Plan – Area B – Demolition 124 5/15/13 E-123 Power Plan – Area B 125 5/15/13 6/25/14 E-124 Systems Plan – Area B – Demolition 126 5/15/13
E-125 Systems Plan – Area B 127 5/15/13 6/25/14 E-126 Lighting Protection Plan – Area A 128 5/15/13 E-130 Lighting Plan – Area C – Demolition 129 5/15/13 E-131 Lighting Plan – Area C 130 5/15/13 E-132 Power Plan – Area C – Demolition 131 5/15/13 E-133 Power Plan – Area C 132 5/15/13 E-134 Systems Plan – Area C – Demolition 133 5/15/13 E-135 Systems Plan – Area C 134 5/15/13 E-136 Existing Lighting Protection Plan – Area C 135 5/15/13 E-400 Enlarged Plans Skylight Lighting 136 5/15/13 E-401 Enlarged Plans Communications Closet RM 137 5/15/13 E-500 Electrical Details 138 5/15/13 E-501 Electrical Detail 139 5/15/13 E-600 Electrical Riser Diagram 140 5/15/13 E-601 Panelboard Schedules – Area A 141 5/15/13 E-602 Panelboard Schedules – Area A 142 5/15/13 E-603 Panelboard Schedules – Area B 143 5/15/13 E-604 Panelboard and MCC Switchboard 144 5/15/13 Schedules – Area C E-605 Light Fixture Schedule 145 5/15/13
TECHNICAL SPECIFICATION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01000 TECHNICAL PROVISIONS
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 42 19 COMPOSITE PANELS
07 51 13 BUILT-UP ASPHALT ROOFING
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 – OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 33 13 METAL ROLLING COUNTER DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 62 26 TUBULAR DAYLIGHTING DEVICES
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
DIVISION 09 – FINISHES
09 06 90 COLOR SCHEDULE
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
mn142 PROJECT TABLE OF CONTENTS - 1 Repair Communications Squadron Building 314 and Parking Lot Grand Forks Air Force Base
09 29 00 GYPSUM BOARD
09 30 00 CERAMIC TILE AND PORCELAIN TILE
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPET
09 72 00 WALL COVERINGS
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 10 00 VISUAL COMMUNICATIONS SPECIALTIES
10 14 00.20 INTERIOR SIGNAGE
10 14 01 EXTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 13 WALL AND CORNER GUARDS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 93 00 SITE FURNISHINGS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 07 19.00 40 PLUMBING PIPING INSULATION
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 15 COMMON PIPING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS
23 09 23 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER LOCAL BUILDING
SYSTEMS
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 31 13 METAL DUCTS
23 34 23.00 40 HVAC POWER VENTILATORS
23 36 00 AIR TERMINAL UNITS
23 37 13 DIFFUSERS, REGISTERS, AND GRILLS
23 54 19 BUILDING HEATING SYSTEMS, WARM AIR
23 81 47 WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS
DIVISION 26 - ELECTRICAL
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
26 60 13.00 40 LOW-VOLTAGE MOTORS
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
mn142 PROJECT TABLE OF CONTENTS - 2 Repair Communications Squadron Building 314 and Parking Lot Grand Forks Air Force Base
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING AND GRUBBING
31 23 00.00 20 EXCAVATION AND FILL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 GRADED-CRUSHED AGGREGATE BASE COURSE
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 14 CONCRETE PAVEMENTS FOR SMALL PROJECTS
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 24.00 10 PAVEMENT MARKINGS
32 32 23 SEGMENTAL RETAINING WALLS
32 92 19 SEEDING
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
32 96 00 TRANSPLANTING EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 40 00 STORM DRAINAGE UTILITIES
33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
SCHEDULE OF MATERIAL SUBMITTALS
-- End of Project Table of Contents --
General Decision Number: ND140003 01/03/2014 ND3
Superseded General Decision Number: ND20130003
State: North Dakota
Construction Type: Building
County: Grand Forks County in North Dakota.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including four stories)
Modification Number Publication Date 0 01/03/2014
* BRND0003-001 05/01/2013
Rates Fringes
BRICKLAYER.......................$ 30.58 11.69
* IRON0512-003 06/09/2013
Rates Fringes
IRONWORKER.......................$ 27.30 22.05
* SHEE0010-037 06/17/2013
Rates Fringes
Sheet Metal Worker
SHEET METAL WORKERS
(including setting the HVAC unit, installing the ductwork and performing the testing & balancing)...$ 28.33 8.96
SUND1999-002 12/21/1999
Rates Fringes
CARPENTER
CARPENTERS (including form setting, Cabinet installation, & drywall hanging, excluding acoustical ceiling installation)...............$ 11.33
DRYWALL FINISHER/TAPER...........$ 13.92
ELECTRICIAN
ELECTRICIAN (including low voltage of computer & telephone lines, doorbells & system controls)..........$ 14.68 2.97
Fire Sprinkler Fitter............$ 14.05 1.51
INSULATOR - MECHANICAL
(Duct, Pipe & Mechanical System Insulation)...............$ 15.43 1.93
Laborers:
Common......................$ 8.44 Mason Tender................$ 9.00
PAINTER
PAINTER (including wallpaper hanging, excluding Drywall Finishing)..................$ 10.88 1.34
PIPEFITTER
PIPEFITTER (including HVAC piping).....................$ 15.26 2.37
PLUMBER..........................$ 14.56 1.94
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
General Decision Number: ND140002 01/10/2014 ND2
Superseded General Decision Number: ND20130002
State: North Dakota
Construction Type: Highway
Counties: North Dakota Statewide.
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 01/03/2014 1 01/10/2014
ELEC0714-002 09/29/2013
ADAMS, BILLINGS, BOTTINEAU, BOWMAN, BURKE, BURLIEGH, DIVIDE,
DUNN, EMMONS, GOLDEN VALLEY, GRANT, HETTINGER, MCHENRY,
MCKENZIE, MCLEAN, MERCER, MORTON, MOUNTRIAL, OLIVER, PIERCE,
RENVILLE, ROLLETTE, SHERIDAN, SOIUX, SLOPE, STARK, WARD, &
WILLIAMS COUNTIES:
Rates Fringes
CABLE SPLICER...............$ 34.46 29.5%+5.00
ELECTRICIAN.................$ 34.06 29.5%+5.00
* ELEC0714-003 09/29/2013
LINE CONSTRUCTION:
Rates Fringes
Line Construction
CABLE SPLICER...............$ 34.15 29.5%+5.00
GROUNDMAN...................$ 20.49 29.5%+5.00
LINE EQUIPMENT OPERATOR.....$ 30.74 29.5%+5.00
LINEMAN.....................$ 34.15 29.5%+5.00
ELEC1426-002 06/01/2013
BARNES, BENSON, CAVALIER, DICKEY, EDDY, FOSTER, GRAND FORKS,
GRIGGS, KIDDER, LAMOURE, LOGAN, MCINTOSH, NELSON, PEMBINA,
RAMSEY, RANSOM, RICHLAND, SARGENT, STEELE, STUTSMAN, TOWNER,
TRAILL, WALSH, & WELLS COUNTIES:
Rates Fringes
CABLE SPLICER...............$ 28.30 11.26
ELECTRICIAN.................$ 26.95 11.10
ENGI0049-001 10/01/2013
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 25.55 13.75
GROUP 2.....................$ 24.65 13.75
GROUP 3.....................$ 24.40 13.75
GROUP 4.....................$ 24.25 13.75
GROUP 5.....................$ 23.40 13.75
GROUP 6.....................$ 22.10 13.75
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: All Cranes 60 tons and over, Cranes doing piling, sheeting, dragline/clam work, Derrick(Guy & Stiff), Gentry Crane Operator, Helicopter Operator, Mole Operator or Tunnel Mucking Machine, Power Shovel 3-1/2 CY. and over and Traveling Tower Crane.
GROUP 2: All Cranes 21 tons and up to 59 tons, Backhoe Operator 3 CY. and over, Creter Crane, Dredge Operator 12' and Over, Equipment Dispatcher, Finish Motor Grader, Front End Loader Operator 8 CY. and over, Master Mechanic (When supervising 5 or more Mechanics), Mon-o-rail Hoist Operator, Power Shovel up to and including 3-1/2 CY. and Tugboat.
GROUP 3: Cranes 20 tons and under, Asphalt Paving Machine Operator, Asphalt Plant Operator, Automated Grade Trimmer, Backhoe Operator 1 CY. up to and including 2-1/2 CY., Boom Truck Hydraulic (8 Tons & over), Cableway Operator, Concrete Batch Plant Operator(electronic or manual), Concrete Mixer Paving Machine Operator, Concrete Paver- Bridge Decks, Concrete Pump, Concrete Spreader Operator & Belt Placer, Crushing Plant Operator, Dozer Operator, Dredge Operator or Engineer 11'' and under, Drill Rigs, Heavy Duty Rotary or Chum or Cable Drill, Front End Loader (3-1/2 CY. up to and including 7-1/2 CY.), Gravel Washing & Screening Plant Operator, Locomotive, all types, Mechanic or Welder(heavy duty), Motor Grade Operator, Pavement Breaker (Non-Hydro Hammer type, Pipeline Wrapping, Cleaning & Bending Machine Operator, Power Actuated Auger and Horizontal Boring Machine Operator 6'' and over, Refrigeration Plant Engineer, Roto Milling Machine (Surface Planer) 43'' & over, Scraper Operator, Slip Form Concrete Paving Operator, Tandem Pushed Quad 9 or similar, Tractor with Boom Attachment, Trenching Machine- 100 HP. and over.
GROUP 4: Articulated/Off Road Hauler, Asphalt Dump Person, Asphalt Paving Screed Operator, Backhoe - up to and including 1/2 CY., Boring Machine locator, Console Board Operator, Distributor Operator (Bituminous), Forklift Operator, Front End Loader- 1-1/2 CY. up to and including 3 CY., Grade Person, Gravel Screening Plant Operator (not Crushing or Washing), Greaser, Lazer-Screed Operator, Longitudinal Float and Spray Operator, Micro surfacer Machine, Motor Grade Operator-Hual Roads, Paving Breaker- Hydro Hammer Type, Pugmill Operator, Push Tractor, Roller, Steel & Rubber on Hot Mix Asphalt Paving, Rotomill Machine (Surface Planer), up to and including 42'', Rumble Strip Machine, Sand and Chip Spreader, Self-propelled Sheepsfoot Packer with or without Blade attachment, Self-propelled Traveling Soil Stabilizer, Sheepsfoot Packer with Dozer attatchment- 100 HP and over, Shouldering Machine, Slip Form, Curb & Gutter Operator, Slurry Seal Machine, Tamping Machine Operator, Tie Tamper and Ballast Machine, Trenching
Machine Operator- 46 HP up to and including 99 HP, Truck Mechanic, Well Points, Tub Grinder, Fuel/Lube Operator.
GROUP 5: Boom Truck- A- Frame or Hydraulic 2 tons up to and including 7 tons, Broom-Self propelled, Concrete Saw (Power Operated), Cure Bridge Operator, Front End Loader Operator, less than 1-1/2 CY., Mobile Cement Mixer, Power Actuated Auger & Horizontal Boring Machine Operator up to and including 5", Roller, on other than Hot Mix Asphalt Paving, Oilers, Vibrating Packer Operator (Pad Type) Self-propelled, Water Spraying Equipment-Self Propelled, Skidsteer Operator with Attachments.
GROUP 6: Brakeman or Switchman, Curb Machine Operator (Manuel), Dredge or Tugboat Deckhand, Drill Truck Gravel/Testing Operator, Form Trench Digger (Power), Gunite Operator Gunall, Paint Machine Striping Operator, Pick-up Sweeper, 1CY. & over Hopper Capacity, Scissor Jack-Self Propelled Platform Lift, Straw Mulcher and Blower, Stump Chipper Operator, Tractor Pulling Compaction or Aerating Equipment, Trenching Machine Operator- up to and including 45 HP., Assistant/Apprentice Operator.
TEAM0638-002 10/01/2013
Rates Fringes
TRUCK DRIVER
Euclid over 20 yds..........$ 26.62 10.80 Single Axle Trucks..........$ 24.67 10.80 Tandem Tri Axle Semi, Low Boy and Off Road Heavy Duty End Dumps 20 yds & under.......................$ 25.10 10.80 Tandem Tri/ Axle Truck......$ 24.79 10.80
SUND2002-001 09/06/2013
Rates Fringes
Electrician Cass County.................$ 14.72 3.40
CARPENTER........................$ 26.00 3.90
Cement Mason/Finisher............$ 26.00 3.90
Laborers:
GROUP 1:....................$ 18.40
GROUP 2.....................$ 18.65
GROUP 3.....................$ 18.80
GROUP 4.....................$ 19.55
LABORERS CLASSIFICATIONS
GROUP 1: General Construction Laborers: Sack Shaker (cement and mineral filler): Pipe Handler: Drill Runner Tender:
Salamander Heater and Blower Tender, Light truck, Pickup Driver, Flaggers and Pilot Car Drivers.
GROUP 2: Semi Skilled Laborer: Bulk Cement Handler: Conduit Layer, Telephone or Electrical: Form Setter (pavement): Gas Electric or pneumatic tool operator: Chipping Hammer, Grinders and Paving Brakers (tamper-drit) Concrete Vibrator Operator: Chain Saw Operator: Concrete Saw Operator:
Concrete Curing Man (not water): Bituminous worker (Shoveler, Dumper, Raker and Floated): Kettleman (bituminous or lead): Concrete Bucket Signlman: Power Buggy Operator: Brick and Mason Tender: Multiplate Pipelayer:
Culvert Pipe Layers: Concrete Finishers Tender. Carpenters Tenders.
GROUP 3: Caisson Worker: Bottom Man (sanitary sewer, storm sewer water and gas liners): Concrete Mixer Operator (one bag capacity): Mortar Mixer.
GROUP 4: Pipe Layers (sanitary sewer, storm sewer, water and gas lines): Drill runner (includes Wagon Churn or Air Track) Powderman, Gunite and Sandblast, Nozzleman, Reinforcing Steel Setters/Tiers.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
The following items are applicable to this modification:
QUESTIONS AND ANSWERS
Q. I’m not sure if I missed a note on the plans or specifications but I can’t seem to locate if signs are required at each door, or how to quantify the signage. Could a schedule for signage be provided please?
A: Please see sheet A-601 – Room Sign Schedule.
Q: Has an asbestos / lead paint survey already been completed? Will we be required to provide this if not already completed?
A: Please find project specific testing report attached.
Q: Will the Prime Contractor be responsible for the IHT monitoring per Section 01000, 13.16.2?
A: Yes
Q: Will asbestos removal be required in our proposals? There is no spec section provided A: Removal shall be included in the proposal as appropriate, based on the asbestos and lead report provided.
Q: Can you please provide fire suppression as-built drawings for this project?
A: See attached fire suppression as-built drawings. Please note that the government does not guarantee the accuracy of these drawings.
| LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS |
| SECTION J |
| SCHEDULE OF DRAWINGS |
| Reference Number Drawing Name Sheet # Date |
| G-001 Title Page and Drawing Index 1 5/15/13 |
| G-002 Project Phasing and Staging 2 5/15/13 |
| C-001 Location Plan and Vicinity Map 3 5/15/13 |
| C-002 Legend and General Notes 4 5/15/13 |
| C-100 Existing Site Plan 5 5/15/13 |
| C-101 Demolition Site Plan 6 5/15/13 |
| C-102 Site Plan 7 5/15/13 |
| C-103 Site Layout Plan 8 5/15/13 |
| C-104 Grading and Drainage Plan 9 5/15/13 |
| C-105 Erosion and Sediment Control Plan 10 5/15/13 |
| C-106 Utility Plan 11 5/15/13 |
| C-300 Profiles and Schedule 12 5/15/13 |
| C-400 Enlarged Plan – Sidewalks and Entry 13 5/15/13 |
| C-500 Standard Civil Details Sheet 1 14 5/15/13 |
| C-501 Standard Civil Details Sheet 2 15 5/15/13 |
| C-502 Standard Civil Details Sheet 3 16 5/15/13 |
| C-503 Standard Civil Details Sheet 4 17 5/15/13 |
| L-100 Overall Landscape Site Plan 18 5/15/13 |
| L-101 Landscape Plan 19 5/15/13 |
| L-102 Landscape Plan 20 5/15/13 |
| L-500 Landscape Notes, Details & Plant Schedule 21 5/15/13 |
| S-001 Structural Legends and Notes 22 5/15/13 |
| S-110 Foundation Plan Demolition 23 5/15/13 |
| S-111 Foundation Plan 24 5/15/13 |
| S-112 Slab Plan - Demolition 25 5/15/13 |
| S-113 Slab Plan 26 5/15/13 6/25/14 |
| S-114 Roof Framing Plan Demolition 27 5/15/13 |
| S-115 Roof Framing Plan 28 5/15/13 6/25/14 |
| S-500 Structural Details Sheet 1 29 5/15/13 |
| S-501 Structural Details Sheet 2 30 5/15/13 |
| S-502 Structural Details Sheet 3 31 5/15/13 |
| S-503 Structural Details Sheet 4 32 5/15/13 |
| A-100 Orentation Plan 33 5/15/13 6/25/14 |
| A-110 Floor Plan – Area A - Demolition 34 5/15/13 6/25/14 |
| A-111 Floor Plan – Area A 35 5/15/13 6/25/14 |
| A-112 Reflected Ceiling Plan – Area A 36 5/15/13 6/25/14 |
| A-113 Roof Plan – Area A - Demolition 37 5/15/13 |
| A-114 Roof Plan – Area A 38 5/15/13 |
| A-120 Floor Plan – Area B - Demolition 39 5/15/13 |
| A-121 Floor Plan – Area B 40 5/15/13 6/25/14 |
| A-122 Reflected Ceiling Plan – Area B 41 5/15/13 6/25/14 |
| A-123 Roof Plan – Area B - Demolition 42 5/15/13 |
| A-124 Roof Plan – Area B 43 5/15/13 |
| A-130 Floor Plan – Area C – Demolition 44 5/15/13 |
| A-131 Floor Plan – Area C 45 5/15/13 |
| A-132 Reflected Ceiling Plan – Area C 46 5/15/13 |
| A-133 Roof Plan – Area C - Demolition 47 5/15/13 |
| A-134 Roof Plan – Area C 48 5/15/13 |
| A-200 Exterior Elevations Sheet 1 49 5/15/13 |
| A-201 Exterior Elevations Sheet 2 50 5/15/13 |
| A-300 Wall Sections Sheet 1 51 5/15/13 |
| A-301 Wall Sections Sheet 2 52 5/15/13 |
| A-302 Wall Sections Sheet 3 53 5/15/13 |
| A-303 Wall Sections Sheet 4 54 5/15/13 |
| A-400 Enlarged Plans and Details Sheet 1 55 5/15/13 |
| A-401 Enlarged Plans and Details Sheet 2 56 5/15/13 |
| A-402 Enlarged Plans and Details Sheet 3 57 5/15/13 |
| A-403 Enlarged Plans and Details Sheet 4 58 5/15/13 |
| A-404 Enlarged Plans and Details Sheet 5 59 5/15/13 |
| A-405 Enlarged Plans and Details Sheet 6 60 5/15/13 |
| A-406 Enlarged Plans and Details Sheet 7 61 5/15/13 |
| A-407 Enlarged Plans and Details – Exterior 62 5/15/13 |
| Dumpster Enclosure |
| A-500 Wall Types 63 5/15/13 |
| A-501 Door and Frame Details 64 5/15/13 |
| A-502 Window Frame Details 65 5/15/13 |
| A-600 Room and Door Schedules 66 5/15/13 6/25/14 |
| A-601 Room Sign Schedules 67 5/15/13 |
| M-001 Mechanical Legends 68 5/15/13 |
| M-110 HVAC Plan – Area A – Demolition 69 5/15/13 |
| M-111 HVAC Plan – Area A 70 5/15/13 6/25/14 |
| M-112 Piping Plan – Area A – Demolition 71 5/15/13 |
| M-113 Piping Plan – Area A 72 5/15/13 6/25/14 |
| M-114 Plumbing Plan – Area A – Demolition 73 5/15/13 |
| M-115 Plumbing Plan – Area A 74 5/15/13 6/25/14 |
| M-116 Mechanical Roof Plan – Area A 75 5/15/13 |
| M-120 HVAC Plan – Area B – Demolition 76 5/15/13 |
| M-121 HVAC Plan – Area B 77 5/15/13 |
| M-122 Piping Plan – Area B – Demolition 78 5/15/13 |
| M-123 Piping Plan – Area B 79 5/15/13 |
| M-124 Plumbing Plan – Area B – Demolition 80 5/15/13 |
| M-125 Plumbing Plan – Area B 81 5/15/13 |
| M-126 Mechanical Roof Plan – Area B 82 5/15/13 |
| M-130 HVAC Plan – Area C – Demolition 83 5/15/13 |
| M-131 HVAC Plan – Area C 84 5/15/13 |
| M-132 Piping Plan – Area C – Demolition 85 5/15/13 |
| M-133 Piping Plan – Area C 86 5/15/13 |
| M-500 Mechanical Details 87 5/15/13 |
| M-501 Mechanical Enlarged Plan, Sections and 88 5/15/13 |
| Details |
| M-600 Piping Riser Diagram – Area A 89 5/15/13 |
| M-601 Piping Riser Diagram – Area B Demolition 90 5/15/13 |
| M-602 Piping Riser Diagram – Area B 91 5/15/13 |
| M-610 HVAC Air Flow and Controls Diagram 92 5/15/13 |
| Sheet 1 |
| M-611 HVAC Air Flow and Controls Diagram 93 5/15/13 |
| Sheet 2 |
| M-612 HVAC Piping Diagram 94 5/15/13 |
| M-613 HVAC Sequence of Operations 95 5/15/13 |
| M-620 Mechanical Schedules – Sheet 1 96 5/15/13 |
| M-621 Mechanical Schedules – Sheet 2 97 5/15/13 |
| F-001 Line Safety Narrative and Legend 98 5/15/13 |
| F-002 Fire Alarm/Mass Notification General 99 5/15/13 |
| Notes, Legend, and Matrix |
| F-003 Sprinkler General Notes, Legends and 100 5/15/13 |
| Details |
| F-100 Fire Safety – Overall Plan 101 5/15/13 6/25/14 |
| F-110 Fire Alarm/Mass Notification Plan Area A 102 5/15/13 6/25/14 |
| F-111 Fire Suppression Plan – Area A 103 5/15/13 6/25/14 |
| F-120 Fire Alarm/Mass Notification Plan Area B 104 5/15/13 6/25/14 |
| F-121 Fire Suppression Plan – Area B 105 5/15/13 6/25/14 |
| F-130 Fire Alarm/Mass Notification Plan Area C 106 5/15/13 |
| F-131 Fire Suppression Plan – Area C 107 5/15/13 |
| E-100 Electrical Legends 108 5/15/13 |
| E-100 Electrical Site Plan – Demolition 109 5/15/13 |
| E-101 Electrcial Utility Plan 110 5/15/13 |
| E-102 Electrcial Sight Lighting Plan 111 5/15/13 |
| E-103 Building 314 Existing Grounding Plan 112 5/15/13 |
| E-110 Lighting Plan – Area A – Demolition 113 5/15/13 |
| E-111 Lighting Plan – Area A 114 5/15/13 6/25/14 |
| E-112 Power Plan – Area A – Demolition 115 5/15/13 |
| E-113 Power Plan – Area A 116 5/15/13 6/25/14 |
| E-114 Systems Plan – Area A – Demolition 117 5/15/13 |
| E-115 Systems Plan – Area A 118 5/15/13 6/25/14 |
| E-116 Lighting Protection Plan – Area A – 119 5/15/13 |
| Demolition |
| E-117 Lighting Protection Plan – Area A 120 5/15/13 |
| E-118 Electrcial Roof Plan – Area A 121 5/15/13 |
| E-120 Lighting Plan – Area B – Demolition 122 5/15/13 |
| E-121 Lighting Plan – Area B 123 5/15/13 6/25/14 |
| E-122 Power Plan – Area B – Demolition 124 5/15/13 |
| E-123 Power Plan – Area B 125 5/15/13 6/25/14 |
| E-124 Systems Plan – Area B – Demolition 126 5/15/13 |
| E-125 Systems Plan – Area B 127 5/15/13 6/25/14 |
| E-126 Lighting Protection Plan – Area A 128 5/15/13 |
| E-130 Lighting Plan – Area C – Demolition 129 5/15/13 |
| E-131 Lighting Plan – Area C 130 5/15/13 |
| E-132 Power Plan – Area C – Demolition 131 5/15/13 |
| E-133 Power Plan – Area C 132 5/15/13 |
| E-134 Systems Plan – Area C – Demolition 133 5/15/13 |
| E-135 Systems Plan – Area C 134 5/15/13 |
| E-136 Existing Lighting Protection Plan – Area C 135 5/15/13 |
| E-400 Enlarged Plans Skylight Lighting 136 5/15/13 |
| E-401 Enlarged Plans Communications Closet RM 137 5/15/13 |
| E-500 Electrical Details 138 5/15/13 |
| E-501 Electrical Detail 139 5/15/13 |
| E-600 Electrical Riser Diagram 140 5/15/13 |
| E-601 Panelboard Schedules – Area A 141 5/15/13 |
| E-602 Panelboard Schedules – Area A 142 5/15/13 |
| E-603 Panelboard Schedules – Area B 143 5/15/13 |
| E-604 Panelboard and MCC Switchboard 144 5/15/13 |
| Schedules – Area C |
| E-605 Light Fixture Schedule 145 5/15/13 |
File details come from the government source that posted it. Updated .