Attach_2 Submittal Schedule.pdf
PDF 283 KB Posted
- Attached to
- Repair E-01 MAF Water Well Federal contract opportunity
- Solicitation number
- FA4626-20-R-0006
About this file
This document is a submittal schedule for a federal contract solicitation to repair a domestic water well at Malmstrom Air Force Base in Montana. The solicitation number is FA4626-20-R-0006 and involves abandoning the existing well, installing a new water treatment system, new wastewater handling equipment, and related electrical and control systems. The submittal schedule outlines 147 line items requiring various submittals such as shop drawings, product data, samples, test reports, qualifications, manuals, and closeout documents. Submittals are due prior to specified events like notice to proceed, start of work, or final inspection. The schedule includes columns for the contractor and government to track submission dates and status of approvals. Funds are presently unavailable and the government's obligation is contingent on appropriated funds availability for payment.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MALMSTROM AFB, MONTANA
SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.
FA4626-20-R-0006
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E R
'S
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
W A
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
IN
G
S
T R
U C
T
IO
N S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
D
U
B M
IS
S
IO
N
D A
T
(B Y
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D I
N
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
S U
B M
IT
T
L
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPRO
VED
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements - 1.8.1 Contractor Design Drawings 3
30d
PTSW
2 01 00 00 General Requirements - 1.8.1 Shop Drawings 3 30d
PTSW
3 01 00 00 General Requirements - 1.8.1 Final As-Built Drawings 3 45d - AFI
01 00 00 General Requirements - 3.3.1 Schedule of Materials
Submittal
10 d -
ANP
01 00 00 General Requirements - 3.4.1 Manufacturer's Product
Brochures & Catalog Data, Components and Materials to be Installed
30d -
PTSW
6 01 00 00 General Requirements - 3.6.4 Overall Project Schedule 3 30d -
PTSW
7 01 00 00 General Requirements - 3.8.1 Start of Work Notification 3 5 d - PTE
8 01 00 00 General Requirements - 3.11 Utility Outages 3 10d - PTE
01 00 00 General Requirements - 3.13 Quality Control Plan and
Specified Quality Control Submittals
10d -
ANP
10 01 00 00 General Requirements - 3.16 As-Built Field Data 3 30d - AFI
01 00 00 General Requirements - 3.16.4 &3.16.5 As-Built Field
Drawings 4 30d - AFI AutoCAD CD
12 01 00 00 General Requirements - 3.17 O&M Instructions/Manual 5
4 20d -
AFI; 1
10d -
PTFI
1 hardcopy, 2 CD's
Number of Copies Required
NZAS 16-6006
Repair MAF E-01 Domestic Water
Well
DATE CONTRACTOR
NOTIFIED
AF Form 66
Submittal Schedule MAF E-01-6/13/2019
01330a-1
REQUIRED TECHNICAL SUBMITTALS
FA4626-19-R-A011
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
T R
U C
T
IO
N S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
B M
IS
S
IO
N
D A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPRO
VED
Number of Copies Required
NZAS 16-6006
Repair MAF E-01 Domestic Water
Well
DATE CONTRACTOR
NOTIFIED
01 00 00 General Requirements - 3.20.3 Size of Storage Area
Requested
30d -
PTSW
01 00 00 General Requirements - 3.23.1 Work Clearance Request (AF
Form 103)
14d -
PTSW
AF Form 103 Work Clearance
15 01 00 00 General Requirements - 3.26 Nuclear Densometers 3 30d -
PTSW
16 01 00 00 General Requirements - 3.28 Notice of Final Inspection 3 14d - PTE
Red line “As-Built” dwgs shall be provided by the Contractor at final inspection.
01 10 00 Site Security - 1.3 Contractor Entry Authorization List
(CEAL)
14d -
PTSW
EAL
18 01 10 00 Site Security - 1.8.3 Weekly Entry and Exit Times 1 7d - AE
01 36 00 Environmental Protection - 1.2.3 Copies of Environmental
Permits 3 5d - AE
01 36 00 Environmental Protection - 1.8.1 List of Hazardous
Materials (1360-5) with MSDSs
30d -
PTSW
01 36 00 Environmental Protection - 1.8.1.4 Actual Hazardous
Materials Used 3 30d - AFI
22 01 36 00 Environmental Protection - 1.11.6 Waste Management Plan 3 10d -
PTFI
01 36 00 Environmental Protection - 1.12.5 Recycled Material Use
Report
10d -
PTFI
24 01 73 29 Cutting and Patching - 1.4 Cutting and Patching Proposal 3 15d - PTE
25 01 73 29 Cutting and Patching - 2.1 Patching Material Product Data 3 30d -
PTSW
AF Form 66
Submittal Schedule MAF E-01-6/13/2019
01330a-2
FA4626-19-R-A011
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
T R
U C
T
IO
N S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
B M
IS
S
IO
N
D A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPRO
VED
Number of Copies Required
NZAS 16-6006
Repair MAF E-01 Domestic Water
Well
DATE CONTRACTOR
NOTIFIED
DIVISION 03 - CONCRETE
26 03 30 00 Cast-in-Place Concrete - 1.2A Shop Drawings 3 30d -
PTSW
27 03 30 00 Cast-in-Place Concrete - 1.2B Concrete Mix Design Data 3 30d -
PTSW
28 3 30 00 Cast-in-Place Concrete - 1.2C Test Reports 3 7d & 28d -
ATT
29 3 30 00 Cast-in-Place Concrete - 1.2D Certificates 3 30d -
PTSW
30 3 30 00 Cast-in-Place Concrete - 1.3B Installation Plan 3 30d -
PTSW
DIVISION 05 - METALS
05 05 23 Metal Fastenings - 1.2A Procedure Specifications and
Procedure Qualification Test Results 5 7d - ATT
05 05 23 Metal Fastenings - 1.2B Performance Qualifications of
Welders and Welding Officers
30d -
PTSW
33 05 05 23 Metal Fastenings - 1.2C Welder's Certificates 3 30d -
PTSW
34 05 05 23 Metal Fastenings - 1.2E Welder's Record 3 30d - AFI
35 05 05 23 Metal Fastenings - 2.1 Electrodes Product Data 3 30d -
PTSW
AF Form 66
Submittal Schedule MAF E-01-6/13/2019
01330a-3
FA4626-19-R-A011
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
T R
U C
T
IO
N S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
B M
IS
S
IO
N
D A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPRO
VED
Number of Copies Required
NZAS 16-6006
Repair MAF E-01 Domestic Water
Well
DATE CONTRACTOR
NOTIFIED
36 05 05 23 Metal Fastenings - 2.2 Stainless Steel Fastener Product Data 3 30d -
PTSW
DIVISION 09 - PAINT
37 09 90 00 Paints and Coatings - 1.2 Shop Drawings 3 30d -
PTSW
38 09 90 00 Paints and Coatings - 1.2 Product Certification 3 30d -
PTSW
39 9 90 00 Paints and Coatings - 1.2 Product Materials 3 30d -
PTSW
40 9 90 00 Paints and Coatings - 1.2 Manufacturer Tech Sheet 3 30d -
PTSW
41 9 90 00 Paints and Coatings - 1.2 Color Samples 3 30d -
PTSW
42 09 90 00 Paints and Coatings - 1.2 Certificates 3 30d -
PTSW
43 9 90 00 Paints and Coatings - 1.2 Application Instructions 3 30d -
PTSW
44 9 90 00 Paints and Coatings - 1.2 Manufacturer's Safety Data Sheets 3 30d -
PTSW
AF Form 66
Submittal Schedule MAF E-01-6/13/2019
01330a-4
FA4626-19-R-A011
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
T R
U C
T
IO
N S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
B M
IS
S
IO
N
D A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPRO
VED
Number of Copies Required
NZAS 16-6006
Repair MAF E-01 Domestic Water
Well
DATE CONTRACTOR
NOTIFIED
45 9 90 00 Paints and Coatings - 1.2 Closeout Submittals 3 30d - AFI
46 09 90 00 Paints and Coatings - 1.3 Qualifications Data 3 30d -
PTSW
DIVISION 22 - PLUMBING
22 05 53 Identification for Plumbing Piping and Equipment - 1.2
Pipe Label Samples for Color, Letter Style, and Graphic
Representation
30d -
PTSW
22 05 53 Identification for Plumbing Piping and Equipment - 2.1
Pipe Label Product Data
30d -
PTSW
22 11 00 Facility Water Distribution - 1.1A Detailed Plans of
Departure from this Section
45d -
PTSW
50 22 11 00 Facility Water Distribution - 1.2 Shop Drawings 3 30d -
PTSW
51 22 11 00 Facility Water Distribution - 1.3 Certifications 3 30d -
PTSW
22 11 00 Facility Water Distribution - 2.1 Pipe and Pipe Fittings
Product Data
30d -
PTSW
22 11 00 Facility Water Distribution - 2.2A Product Data for Ball
Valves
30d -
PTSW
AF Form 66
Submittal Schedule MAF E-01-6/13/2019
01330a-5
FA4626-19-R-A011
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
T R
U C
T
IO
N S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
B M
IS
S
IO
N
D A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPRO
VED
Number of Copies Required
NZAS 16-6006
Repair MAF E-01 Domestic Water
Well
DATE CONTRACTOR
NOTIFIED
22 11 00 Facility Water Distribution - 2.2B Product Data for Check
Valves
30d -
PTSW
22 11 00 Facility Water Distribution - 2.2C Product Data for Pressure
Reducing Valve
30d -
PTSW
22 11 00 Facility Water Distribution - 2.2D Product Data for
Pressure Tank
30d -
PTSW
22 11 00 Facility Water Distribution - 2.2E Product Data for Pressure
Switch
22 11 00 Facility Water Distribution - 2.2F Product Data for Other
Minor Components
30d -
PTSW
22 11 00 Facility Water Distribution - 2.3 Product Data for
Electromagnetic Flow Meter
30d -
PTSW
22 11 00 Facility Water Distribution - 2.4 Product Data for Sample
Taps
30d -
PTSW
22 11 00 Facility Water Distribution - 2.5 Product Data for Hose
Bibs
30d -
PTSW
22 11 00 Facility Water Distribution - 2.6 Product Data Pex Pipe
Insulation Product Data
30d -
PTSW
AF Form 66
Submittal Schedule MAF E-01-6/13/2019
01330a-6
FA4626-19-R-A011
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
T R
U C
T
IO
N S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
B M
IS
S
IO
N
D A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPRO
VED
Number of Copies Required
NZAS 16-6006
Repair MAF E-01 Domestic Water
Well
DATE CONTRACTOR
NOTIFIED
DIVISION 26 - ELECTRICAL
26 00 00 General Provisions for Electrical Work - 1.2.B
Qualifications
15d
ANTP
26 05 19 Low Voltage Electrical Power Cables and Conductors - 1.3
Product Data
30d -
PTSW
26 05 19 Low Voltage Electrical Power Cables and Conductors -
1.4.A. Qualifications
15d
ANTP
26 05 19 Low Voltage Electrical Power Cables and Conductors -
1.4.B. Quality control test reports
3d
ATT
26 05 26 Grounding and Bonding for Electrical Systems - 1.3.A & B
Product Data and Shop Drawings 3 3
15d
ANTP
26 05 26 Grounding and Bonding for Electrical Systems - 1.3.C Test
Reports
3d
ATT
69 26 05 33 Raceways and Boxes for Electrical Systems - 1.4A 3 3 15d
ANTP
70 26 05 53 Identification for Electrical Systems - 1.3. Product Data 3 15d
ANTP
71 26 29 13 Enclosed Controllers - 1.4.A. Product Data 3 15d
ANTP
72 26 29 13 Enclosed Controllers - 1.4.B.1. Tabulations 3 15d
ANTP
AF Form 66
Submittal Schedule MAF E-01-6/13/2019
01330a-7
FA4626-19-R-A011
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
T R
U C
T
IO
N S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
B M
IS
S
IO
N
D A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPRO
VED
Number of Copies Required
NZAS 16-6006
Repair MAF E-01 Domestic Water
Well
DATE CONTRACTOR
NOTIFIED
73 26 29 13 Enclosed Controllers - 1.4.B.2. Wiring Diagrams 3 15d
ANTP
74 26 29 13 Enclosed Controllers - 1.4.C. O&M Data 3 3 PTFI
DIVISION 31 - EARTHWORK
75 31 00 00 Earthwork - 2.1 Borrow Material Product Data 3 30d -
PTSW
76 31 00 00 Earthwork - 2.2 Backfill Product Data 3 30d -
PTSW
77 31 00 00 Earthwork - 2.3A Field Density Testing Results 3 7d - ATT
78 31 00 00 Earthwork - 2.3B Moisture-Density Curves 3 30d - AFI
31 23 33 Trench Excavation and Backfill for Pipelines and
Appurtenant Structures - 1.2 Excavator Model to be Used
30d -
PTSW
31 23 33 Trench Excavation and Backfill for Pipelines and
Appurtenant Structures - 1.3 Test Results for Pipe Bedding Sieve and
Proctor, Pipe Bedding Compaction, Type A Trench Backfill
Compaction, Type B Trench Backfill Compaction, and Controlled
Low Strength Material
3 1d - ATT
31 23 33 Trench Excavation and Backfill for Pipelines and
Appurtenant Structures - 1.5 Written Statement of Method of
Maintenance
30d -
PTSW
AF Form 66
Submittal Schedule MAF E-01-6/13/2019
01330a-8
FA4626-19-R-A011
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
T R
U C
T
IO
N S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
B M
IS
S
IO
N
D A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPRO
VED
Number of Copies Required
NZAS 16-6006
Repair MAF E-01 Domestic Water
Well
DATE CONTRACTOR
NOTIFIED
31 23 33 Trench Excavation and Backfill for Pipelines and
Appurtenant Structures - 1.8 A. Utility Notices
10d -
PTSW
31 23 33 Trench Excavation and Backfill for Pipelines and
Appurtenant Structures - 2.1 Type I Bedding Material Product Data
30d -
PTSW
31 23 33 Trench Excavation and Backfill for Pipelines and
Appurtenant Structures - 2.2 Type II Bedding Material Product Data
30d -
PTSW
31 23 33 Trench Excavation and Backfill for Pipelines and
Appurtenant Structures - 2.3 Pipe Bedding
30d -
PTSW
31 23 33 Trench Excavation and Backfill for Pipelines and
Appurtenant Structures - 2.4 Trench Backfill
30d -
PTSW
31 23 33 Trench Excavation and Backfill for Pipelines and
Appurtenant Structures - 2.6 Plastic Marking Tape
30d -
PTSW
31 23 33 Trench Excavation and Backfill for Pipelines and
Appurtenant Structures - 2.5 Tracer Wire
30 d -
PTSW
31 23 33 Trench Excavation and Backfill for Pipelines and
Appurtenant Structures - 3.3 H. Written Permission for Off-Site
Disposal from Owner of Property upon which Material is to be
Disposed
7d -
PTSW
AF Form 66
Submittal Schedule MAF E-01-6/13/2019
01330a-9
FA4626-19-R-A011
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
T R
U C
T
IO
N S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
B M
IS
S
IO
N
D A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPRO
VED
Number of Copies Required
NZAS 16-6006
Repair MAF E-01 Domestic Water
Well
DATE CONTRACTOR
NOTIFIED
DIVISION 32 - EXTERIOR
IMPROVEMENTS
32 92 19 Seeding - 2.1 Certificate of Composition and Weed-Free
Certification
30d -
PTSW
91 32 92 19 Seeding - 2.2 Topsoil 3 30d -
PTSW
92 32 92 19 Seeding - 2.3 Fertilizer 3 30d -
PTSW
93 32 92 19 Seeding - 2.4 Fiber Mulch 3 30d -
PTSW
94 32 92 19 Seeding - 3.4 Warranty 3 30d -
PTSW
DIVISION 33 - UTILITIES
95 33 01 10.81 Well Abandonment - 1.1 Proof of Variance 3 30d -
PTSW
96 33 01 10.81 Well Abandonment - 1.1 Well Abandonment Plan 3 30d -
PTSW
97 33 01 10.81 Well Abandonment - 1.2 Well Abandonment Log 3 30d - AFI
AF Form 66
Submittal Schedule MAF E-01-6/13/2019
01330a-10
FA4626-19-R-A011
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
T R
U C
T
IO
N S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
B M
IS
S
IO
N
D A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPRO
VED
Number of Copies Required
NZAS 16-6006
Repair MAF E-01 Domestic Water
Well
DATE CONTRACTOR
NOTIFIED
98 33 01 10.81 Well Abandonment - 2.1 Bentonite Grout Product Data 3 30d -
PTSW
33 05 07.13 Utility Directional Drilling - 1.2 Horizontal Driller
Qualifications
30d -
PTSW
33 05 07.13 Utility Directional Drilling - 1.3 Drilling and Excavation
Plan
30d -
PTSW
33 05 07.13 Utility Directional Drilling - 2.1 Carrier Pipe Product
Data
30d -
PTSW
33 05 07.13 Utility Directional Drilling - 2.2 Casing Pipe Product
Data
30d -
PTSW
33 14 16 Polyethylene Pipe and Fittings for Water - 2.1 A
Polyethylene Compounds
30d -
PTSW
33 14 16 Polyethylene Pipe and Fittings for Water - 2.1 B Pipe
System Components
30d -
PTSW
105 33 14 16 Polyethylene Pipe and Fittings for Water - 2.2 Fittings 3 30d -
PTSW
33 14 16 Polyethylene Pipe and Fittings for Water - 2.4B Closed Cell
Foam Insulation
30d -
PTSW
33 14 16 Polyethylene Pipe and Fittings for Water - 3.5 Qualifications of Person to Perform Work
30d -
PTSW
AF Form 66
Submittal Schedule MAF E-01-6/13/2019
01330a-11
FA4626-19-R-A011
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
T R
U C
T
IO
N S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
B M
IS
S
IO
N
D A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPRO
VED
Number of Copies Required
NZAS 16-6006
Repair MAF E-01 Domestic Water
Well
DATE CONTRACTOR
NOTIFIED
33 21 00 Water Supply Wells - 1.2 All Necessary Permits and
Certificates 3 3
7d -
PTSW
109 33 21 00 Water Supply Wells - 1.4 Well Report 3 60d -
ATT
110 33 21 00 Water Supply Wells - 1.7 Documentation of Competence 3 30d -
PTSW
33 21 00 Water Supply Wells - 1.8 Qualifications of Geologist and
Geophysicist
30d -
PTSW
112 33 21 00 Water Supply Wells - 1.12 A. Drawings, Diagrams, Etc. 3 3 30d -
PTSW
33 21 00 Water Supply Wells - 1.12 B. Name of Laboratory Used for
Water Sample Analysis
30d -
PTSW
114 33 21 00 Water Supply Wells - 1.12 D. Manufacturer's Certificates 3 30d -
PTSW
33 21 00 Water Supply Wells - 1.12 E Qualification Statements of
Subcontractors
30d -
PTSW
33 21 00 Water Supply Wells - 1.12 G Drilling Equipment Product
Data
30d -
PTSW
117 33 21 00 Water Supply Wells - 1.12 H Closeout Submittals 3 30d - AFI
AF Form 66
Submittal Schedule MAF E-01-6/13/2019
01330a-12
FA4626-19-R-A011
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
T R
U C
T
IO
N S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
B M
IS
S
IO
N
D A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPRO
VED
Number of Copies Required
NZAS 16-6006
Repair MAF E-01 Domestic Water
Well
DATE CONTRACTOR
NOTIFIED
118 33 21 00 Water Supply Wells - 2.1 Drilling Fluids Product Data 3 30d -
PTSW
119 33 21 00 Water Supply Wells - 2.2 Well Casing Product Data 3 30d -
PTSW
120 33 21 00 Water Supply Wells - 2.3 Conductor Pipe Product Data 3 30d -
PTSW
121 33 21 00 Water Supply Wells - 2.4 Well Screen Product Data 3 30d -
PTSW
122 33 21 00 Water Supply Wells - 2.5 Sealing Grout Product Data 3 30d -
PTSW
123 33 21 00 Water Supply Wells - 2.6 Well Pump Product Data 3 30d -
PTSW
124 33 21 00 Water Supply Wells - 2.7 Pitless Adaptor Unit Product Data 3 30d -
PTSW
AF Form 66
Submittal Schedule MAF E-01-6/13/2019
01330a-13
FA4626-19-R-A011
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
T R
U C
T
IO
N S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
B M
IS
S
IO
N
D A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPRO
VED
Number of Copies Required
NZAS 16-6006
Repair MAF E-01 Domestic Water
Well
DATE CONTRACTOR
NOTIFIED
125 33 21 00 Water Supply Wells - 2.8 Well Cap Product Data 3 30d -
PTSW
126 33 21 00 Water Supply Wells - 2.9 Drop Pipe Product Data 3 30d -
PTSW
127 33 21 00 Water Supply Wells - 2.10 Check Valves Product Data 3 30d -
PTSW
128 33 21 00 Water Supply Wells - 2.11 Torque Arrestor Product Data 3 30d -
PTSW
129 33 21 00 Water Supply Wells - 2.12 Coupler Product Data 3 30d -
PTSW
130 33 21 00 Water Supply Wells - 3.2 Drilling Fluid Properties Log 3 30d - AFI
131 33 21 00 Water Supply Wells - 3.3 Borehole Log 3 30d - AFI
132 33 21 00 Water Supply Wells - 3.4 Results of Water Sampling 3 60d -
ATT
133 33 21 00 Water Supply Wells - 3.5 Well Log 3 30d - AFI
134 33 21 00 Water Supply Wells - 3.6 Rate of Penetration Log 3 30d - AFI
AF Form 66
Submittal Schedule MAF E-01-6/13/2019
01330a-14
FA4626-19-R-A011
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
T R
U C
T
IO
N S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
B M
IS
S
IO
N
D A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPRO
VED
Number of Copies Required
NZAS 16-6006
Repair MAF E-01 Domestic Water
Well
DATE CONTRACTOR
NOTIFIED
135 33 21 00 Water Supply Wells - 3.7 Geophysical Log 3 30d - AFI
136 33 21 00 Water Supply Wells - 3.8 Stratigraphic Log 3 30d - AFI
137 33 21 00 Water Supply Wells - 3.14 Video Inspection 3 30d - AFI
138 33 21 00 Water Supply Wells - 3.15 Well Development Records 3 30d - AFI
33 21 00 Water Supply Wells - 3.16 Performance Testing Records and
Reports 3 30d - AFI
DIVISION 46 - WATER AND
WASTEWATER EQUIPMENT
46 07 01 Water Treatment Equipment - 1.3E Modification
Requirements
3 3 30 - PTB
46 07 01 Water Treatment Equipment - 1.4A Product Data for
Sediment Filter, Carbon Filters, Zeolite Filter, RO System and
Components, Calcite System, Hypochlorite Disinfection System, Charcoal Filter, and Pressure Gauges
30d -
PTSW
46 07 01 Water Treatment Equipment - 1.4B Dimensions and
Installation Requirements of Water Treatment Equipment
30d -
PTSW
46 07 01 Water Treatment Equipment - 1.4C Proof of Experience of
Manufacturer
30d -
PTSW
AF Form 66
Submittal Schedule MAF E-01-6/13/2019
01330a-15
FA4626-19-R-A011
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
M A
N U
F A
C T
U R
E
R R
A N
T Y
C A
T A
L O
G D
A T
A
O P
E R
A T
T R
U C
T
IO
N S
N O
T
IF
IC
A
T
IO
N
O T
H E
R
R E
Q U
IR
B M
IS
S
IO
N
D A
C O
N T
R A
C T
O R
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
S U
B M
IT
T
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPRO
VED
Number of Copies Required
NZAS 16-6006
Repair MAF E-01 Domestic Water
Well
DATE CONTRACTOR
NOTIFIED
144 46 07 01 Water Treatment Equipment - 1.4D Skid Design 3 3 30d -
PTSW
145 46 07 01 Water Treatment Equipment - 1.4E Water Sample Results 3 30d - AFI
46 07 01 Water Treatment Equipment - 1.4F User's Manual for RO system 3 30d - AFI
147 46 07 01 Water Treatment Equipment - 3.5 Instruction and Training 3 7d - ATT
AFI = After Final Inspection BD= Before Delivery
ANP= After Notice to Proceed PTB= Prior To Bid
ATT= After Test Taken PTE=Prior to Event
AE= After Event PTFI= Prior to Final Inspection
BBCW= Before Beginning Concrete Work PTSW= Prior to Start of Work
Schedule of Abbreviations:
AF Form 66
Submittal Schedule MAF E-01-6/13/2019
01330a-16
File details come from the government source that posted it. Updated .