This document outlines specifications for a pre-engineered building to be constructed at Malmstrom Air Force Base. The contract requires design, fabrication, and delivery of all components for a 20,000 square foot pre-engineered metal building, including structural steel, insulated wall and roof panels, roll-up doors, personnel doors, gutters, downspouts and overhangs. The building dimensions are specified as 100 feet wide, 200 feet long and 28 feet high, and components are to be delivered within 60 days of award. Additional requirements include seismic, wind, and snow load design criteria according to referenced standards, as well as floor loading capacity and references to applicable building codes.
Key components and specifications are defined such as wall and roof panel materials and colors, door quantities and features, insulation standards, and delivery instructions. The related solicitation is for the referenced pre-engineered building and is issued by the Department of the Air Force Global Strike Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QnA Sheet_Revised_Cumulative.pdf | ||
| Amendment _001.pdf | ||
| Atch_1_RH Maintenance Facility PEB Specs_Amend 1_2July 2020.pdf | ||
| Conformed_COMBO.pdf | ||
| Atch_3_AF Form 66 Submittal Schedule_Amend 1_2 July 2020.xls | XLS spreadsheet | |
| QnA Sheet.pdf | ||
| Atch_1_Maintenance Facility PEB Specs.pdf | ||
| Atch_3_AF Form 66 Submittal Schedule 20200124.pdf | ||
| Atch_2_Maintenance_Facility_PEB_30_20200129.pdf | ||
| COMBO.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
7-1
MALMSTROM AIR FORCE BASE PRE-ENGINEERED BUILDING SPECIFICATIONS /
SALIENT CHARACTERISTICS
1. SYNOPSIS
• Contract to design, fabricate, and deliver components for a 20,000 square foot, Pre-Engineered
Building (PEB) facility intended to store RED HORSE maintenance functions at Malmstrom AFB, MT. Components for the PEB shall include structural steel, insulated metal roof/wall panels, associated flashing, gutters, downspouts, roll-up doors, personnel doors, and overhangs. Delivery of all required materials is required to be delivered no later than 60 days after date of contract (ADC).
• Vendor’s proposal must properly address each characteristic as evaluation criteria. Unless otherwise stated (i.e. range of values, minimum, maximum), the following specifications are mandatory. Pre- Engineered Building will come as a package unit (1 kit) of all components to construct this facility.
• Vendor shall provide column reactions to the 819th RHS in order for the 819th to accomplish the foundation design.
2. DIMENSIONS / DESCRIPTION
• Dimensions are 100’ Width x 200’ Length x 28’ Height (eave height) for a PEB maintenance materials storage warehouse.
• Wall panels shall be insulated, 26 gauge, and come with all associated hardware, clips, fasteners, flashing, etc. Color of all wall panels shall be Antique Linen (Federal Standard Color No. 23578) with Dark Bronze trim. Vendor shall submit physical color samples of product with proposal (see submittal schedule).
• Building shall have four down spouts on one long side and four on the other (eight total), attached to gutters and spaced equally down eave side walls. Flashing, gutters, and downspouts shall be Dark Bronze (Federal Standard Color No. 37056).
• Roof of building shall be insulated, 24 gauge, standing seam metal panels with all associated hardware, clips, fasteners, flashing, etc. necessary to install to building framework. Roof panels shall be Mellow Brown with Ultra Brown trim. Vendor shall submit physical color samples of product with proposal (see submittal schedule). Pitch of roof shall be 4:12. Contractor shall provide and deliver the required roof panel seaming machine as a four week rental that will be returned/shipped by the Government at no additional cost to the Government.
• 10 roll-up doors (no windows) shall be 20’ Width x 20’ Height and insulated. Doors will come with three phase electric motor door openers (1 Horsepower) with chain back-up. The door color will be Dark Bronze. Vendor shall submit physical color samples of product with proposal (see submittal schedule). Roll-up doors shall come with an interior shroud and must have a charging wheel on the drum. Drum head plates must mount to door tracks. Doors will be field-installed.
• Four personnel doors shall be (standard US measurement) 3070 exterior metal doors and should swing outward from the building (right handed for personnel door). Each door shall have one 2’ Width x 3’ Height window and have tinted, energy efficient glazing. Each window shall be laminated to prevent excessive fragmentation. Personnel door and associated trim shall be Dark Bronze anodized aluminum to match remainder of building. All personnel doors shall include panic hardware, sweeps, thresholds, and exterior keyed door locks (Best core). Note: Final personnel door locations along the East and West walls will vary between 1-2 feet pending construction of the interior office and bathroom indicated on the attached drawings. Doors will be field-installed.
• Two double personnel door sets shall be (standard US measurement) 3070 exterior metal doors and should swing outward from the building (right hand door is active and left door is passive) with 24” x 18” louvres located 12” from the bottom of the door. All personnel doors shall include sweeps, thresholds, and exterior keyed door locks (Best core). Personnel door sets and associated trim shall be Dark Bronze anodized aluminum to match remainder of building.
• Primary wall insulation shall be insulated panels reaching an R-value of R20. The rigid panel insulation installed in the roof shall be R49. Insulation will include vapor barrier.
7-2
• Incorporate overhangs at personnel doors to minimize water infiltration into the building.
Dimensions for overhangs shall be 4’ x 4’.
• Column reactions should be sent to 819th RHS personnel ASAP so they can accomplish the foundation design in a timely manner.
• Note: All interior office/bathroom walls, electrical, water/wastewater, comm, and HVAC design, material, and labor to be completed by others.
• Include fabrication and delivery of a free-standing mezzanine: 65’- 6” length x 29’ width x 12’ clear height. This will have offices built by others underneath and above, so spans must be able to support this weight without the need for additional support beams in the center. The required live load for the mezzanine shall be 200 psf.
3. SEISMIC DESIGN REQUIREMENTS (Minimum Requirements):
Seismic design of the subject facility shall be performed in accordance with the requirements of UFC 3- 301-01 and UFC 3-310-04, using the following design criteria:
Seismic Use Group I
Short Period Spectral Acceleration, Ss: .17g (Vendor Verify, use higher value) One Second Period Spectral Acceleration, S1: .06g (Vendor Verify, use higher value) Soil Site Class: D (Vendor Verify)
A site specific ground acceleration determination is required for buildings in seismic use groups IIIE and IIIH. (Vendor Verify)
4. WIND LOADS (Minimum Requirements):
Design of the subject facility for wind loads shall be performed in accordance with the requirements of ASCE 7-10 and UFC 3-301-01, using the following criteria:
Wind Velocity, 3-sec gust 90 mph (Vendor Verify) Wind Exposure Category B (Vendor Verify) Building Category II (Vendor Verify)
5. SNOW LOADS (Minimum Requirements):
Design of the subject facility for snow loads shall be performed in accordance with the requirements of ASCE 7-10 and UFC 3-301-01, using the following design criteria:
Ground Snow Load 31 psf (Vendor Verify) Frost Penetration 42 inches (Vendor Verify) Building Category II (Vendor Verify) Roof Snow Load 30 psf (Vendor Verify)
6. FLOOR LOADS for Reference (Loading Parameters):
Per Construction
Dead Load Floor Live Loads:
Slab Live Load Demand 500 psf Heavy Vehicles Reference IBC 1607.7
7-3
Note that the building must be able to support the following interior components (installed by others, not part of contract): high-bay lighting, fire suppression/detection system, minimum two ventilation fans mounted on gable end of building, and potential HVAC ductwork. Additional loading parameters may be indicated and shall be resolved during the design process.
DELIVERY INSTRUCTIONS
• All material on this contract shall be delivered on the same delivery date proposed by the vendor.
• All material on this contract shall be delivered to Malmstrom AFB, MT no later than 60 Days ADC.
Specific time and location will be determined with the Air Force POC after award.
7. REQUIRED REFERENCES (building must comply with the following latest references)
• American Society of Civil Engineers (ASCE), Minimum Design Loads for Buildings and Other
Structures, ASCE 7-10.
• International Building Code (IBC) 2015.
• American Concrete Institute (ACI) 318-14, Building Code Requirements for Structural Concrete.
• American Institute of Steel Construction (AISC) Steel Construction Manual, 15th Addition.
• UFC 1-200-01, General Building Requirements.
• UFC 3-101-01, Architecture.
• UFC 3-301-01, Structural Engineering.
• UFC 3-310-04, Seismic Design.
• UFC 4-440-01, Warehouses and Storage Facilities.
• Luke AFB, AZ Installation Development and Design (ID2).
• NFPA 101, Life Safety Code.
• ASHRAE 90.1.
• ASHRAE 62.1 2016.
• NFPA 70, National Electrical Code (NEC).
• NFPA 72, National Fire Alarm Code.
• AETC First 400 Feet Standard Guidance with Luke Supplement.
• UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings, 10/2013.
8. ATTACHMENTS
• AF66 submittal schedule
• Building Envelope Dimensions
MALMSTROM AIR FORCE BASE PRE-ENGINEERED BUILDING SPECIFICATIONS / SALIENT CHARACTERISTICS