QnA Sheet_Revised_Cumulative.pdf
PDF 85 KB Posted
- Attached to
- RHS Vehicle Maintenance Pre-Engineered Building Federal contract opportunity
- Solicitation number
- FA4626-20-Q-0031
About this file
This document provides questions and answers regarding a solicitation for a pre-engineered vehicle maintenance building for the Department of the Air Force Global Strike Command. The solicitation requires the purchase of a pre-engineered building to comply with specifications for foam core insulated wall and roof panels with an R-value matching requirements. The contractor must unload the building shipment at the government's designated location and comply with Buy American Act requirements. The response deadline is not provided, though Amendment 1 should be referenced for an updated delivery schedule.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment _001.pdf | ||
| Atch_1_RH Maintenance Facility PEB Specs_Amend 1_2July 2020.pdf | ||
| Conformed_COMBO.pdf | ||
| Atch_3_AF Form 66 Submittal Schedule_Amend 1_2 July 2020.xls | XLS spreadsheet | |
| QnA Sheet.pdf | ||
| Revised RH Maintenance Facility PEB Specs.pdf | ||
| Atch_1_Maintenance Facility PEB Specs.pdf | ||
| Atch_3_AF Form 66 Submittal Schedule 20200124.pdf | ||
| Atch_2_Maintenance_Facility_PEB_30_20200129.pdf | ||
| COMBO.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWER DOCUMENT
Requirement: RHS Vehicle Maintenance Pre-Engineered Building
9 July 2020
NOTE: In accordance with the Combined Synopsis-Solicitation FAR 52.121-1 Addenda – Please don’t forget to provide an itemized price breakout of your submission.
Q1: Can the delivery schedule be changed to 150 days after date of contract?
A1: PLEASE SEE AMENDMENT 1 FOR UPDATED DELIVERY SCHEDULE.
Q2: How much Collateral Load is needed for this project?
A2: The Collateral Loads will be a fire protection sprinkler system, HVAC ductwork for heating and ventilation, roll-up doors, and LED lighting.
Q3: Will there be any future requirement for an overhead crane?
A3: No there will not. See answer for question 2 on the Collateral Load for details.
Q4: Is it the contractor’s responsibility to unload the shipment, or the Government’s?
A4: It is the responsibility of the contractor to unload the shipment at a location determined by the Government.
Q5: Can the Buy American Requirements be clarified?
A5: Please comply with the Buy American Act as detailed in clauses:
DFARS 252.225-7001, Buy American and Balance of Payments Program (Dec 2017) DFARS 252.225-7012, Preference For Certain Domestic Commodities (Dec 2017)
Q6: Is the intent for foam core insulated panels to be for the walls and roof?
A6: Foam core insulated panels for the wall and roof is required.
Q7: Will a designed insulation panel system be acceptable?
A7: As long as color matches and the R-Value matches the required specifications.
Q8: Can I submit a quote if I am not registered under the applicable NAICS?
A8: No, you must be registered under the applicable NAICS.
Q9: Can the blast loads be defined?
A9: Ensure the blast loads conform with UFC 4-010-01 DoD Anti-terrorism Reference.