Atch_3_AF Form 66 Submittal Schedule 20200124.pdf
PDF 23 KB Posted
- Attached to
- RHS Vehicle Maintenance Pre-Engineered Building Federal contract opportunity
- Solicitation number
- FA4626-20-Q-0031
About this file
This submittal schedule outlines the required submissions for a pre-engineered building project. The contractor must submit 35% and 65% design drawings with their proposal and within two weeks of award, respectively. Shop drawings for insulated roof and wall panels, doors, and roll-up doors are due four weeks after award. 95% and 100% design drawings, including foundation details, are due four and five weeks after award. An anchor bolt layout, material inventory list, and installation guides must be submitted three weeks prior to proposed delivery. The schedule also specifies the number of copies and submission dates for warranty information, operating instructions, and certifications of compliance. The project is for the Department of the Air Force Global Strike Command for a vehicle maintenance facility under solicitation number FA4626-20-Q-0031.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QnA Sheet_Revised_Cumulative.pdf | ||
| Atch_1_RH Maintenance Facility PEB Specs_Amend 1_2July 2020.pdf | ||
| Conformed_COMBO.pdf | ||
| Atch_3_AF Form 66 Submittal Schedule_Amend 1_2 July 2020.xls | XLS spreadsheet | |
| Amendment _001.pdf | ||
| QnA Sheet.pdf | ||
| Revised RH Maintenance Facility PEB Specs.pdf | ||
| Atch_1_Maintenance Facility PEB Specs.pdf | ||
| Atch_2_Maintenance_Facility_PEB_30_20200129.pdf | ||
| COMBO.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEMS OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
APPROVED DIS-APPROVED
35% Designs (Preliminary Designs) x With Proposal
Proposed Material Delivery Date x With Proposal
65% Designs
*To include foundation x x 2 weeks after award
Insulated Roof Panels, Flashing, and
Hardware x x x x x 4 weeks after award
Insulated Wall Panels, Flashing, and
Hardware to include gutters, downspouts, and overhangs x x x x x 4 weeks after award
Personnel Doors and Hardware x x 4 weeks after award
Roll-Up Doors and Hardware x x x x 4 weeks after award
95% Designs
*To include foundation x x 4 weeks after award
100% Designs (Final Designs)
*To include foundation x x 5 weeks after award
Anchor bolt layout and design loads x x 5 weeks after award
Material Inventory List x x NLT 3 weeks prior to proposed delivery date
Installation Guides x NLT 3 weeks prior to proposed delivery date
FI
N
AL
A
PP
R
O
VA
L
REMARKS
NOTIFIED
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SU
BM
IT
TA
L N
U M
BE
R
DATE CONTRACTOR
C O
N
TR
AC
TO
R R
ES
U
BM
IT
TA
L
O
TH
ER
PL
AN
S
D
AT
E R
EC
EI
VE
D
IN
C
O N
TR
AC
TI
N
G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
C
AT
AL
O
G D
AT
A
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
M
SD
S
TO BE COMPLETED BY PROJECT ENGINEER
TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED =
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
Li ne N um be r
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
SH
O
P D
R
AW
IN
G
S
SA
M
PL
ES
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S R
EC
O
M M
EN
D
AT
IO
N S
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER PROJECT TITLE SOLICITATION/ CONTRACT NUMBER
1058520 RH Maintenance Facility
Schedule of Material Submittals, MAR 05 (SAF/AQCP) / PREVIOUS FORM IS OBSOLETE
AF 66
File details come from the government source that posted it. Updated .