Atch_3_AF Form 66 Submittal Schedule 20200124.pdf

PDF 23 KB Posted

Attached to
RHS Vehicle Maintenance Pre-Engineered Building Federal contract opportunity
Solicitation number
FA4626-20-Q-0031
Issued by
Department of the Air Force Global Strike Command

About this file

This submittal schedule outlines the required submissions for a pre-engineered building project. The contractor must submit 35% and 65% design drawings with their proposal and within two weeks of award, respectively. Shop drawings for insulated roof and wall panels, doors, and roll-up doors are due four weeks after award. 95% and 100% design drawings, including foundation details, are due four and five weeks after award. An anchor bolt layout, material inventory list, and installation guides must be submitted three weeks prior to proposed delivery. The schedule also specifies the number of copies and submission dates for warranty information, operating instructions, and certifications of compliance. The project is for the Department of the Air Force Global Strike Command for a vehicle maintenance facility under solicitation number FA4626-20-Q-0031.

View the file

Other files for this federal contract opportunity

Other files attached to RHS Vehicle Maintenance Pre-Engineered Building, newest first.
File Type Posted
QnA Sheet_Revised_Cumulative.pdf PDF
Atch_1_RH Maintenance Facility PEB Specs_Amend 1_2July 2020.pdf PDF
Conformed_COMBO.pdf PDF
Atch_3_AF Form 66 Submittal Schedule_Amend 1_2 July 2020.xls XLS spreadsheet
Amendment _001.pdf PDF
QnA Sheet.pdf PDF
Revised RH Maintenance Facility PEB Specs.pdf PDF
Atch_1_Maintenance Facility PEB Specs.pdf PDF
Atch_2_Maintenance_Facility_PEB_30_20200129.pdf PDF
COMBO.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEMS OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

APPROVED DIS-APPROVED

35% Designs (Preliminary Designs) x With Proposal

Proposed Material Delivery Date x With Proposal

65% Designs

*To include foundation x x 2 weeks after award

Insulated Roof Panels, Flashing, and

Hardware x x x x x 4 weeks after award

Insulated Wall Panels, Flashing, and

Hardware to include gutters, downspouts, and overhangs x x x x x 4 weeks after award

Personnel Doors and Hardware x x 4 weeks after award

Roll-Up Doors and Hardware x x x x 4 weeks after award

95% Designs

*To include foundation x x 4 weeks after award

100% Designs (Final Designs)

*To include foundation x x 5 weeks after award

Anchor bolt layout and design loads x x 5 weeks after award

Material Inventory List x x NLT 3 weeks prior to proposed delivery date

Installation Guides x NLT 3 weeks prior to proposed delivery date

FI

N

AL

A

PP

R

O

VA

L

REMARKS

NOTIFIED

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

DATE CONTRACTOR

C O

N

TR

AC

TO

R R

ES

U

BM

IT

TA

L

O

TH

ER

PL

AN

S

D

AT

E R

EC

EI

VE

D

IN

C

O N

TR

AC

TI

N

G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

C

AT

AL

O

G D

AT

A

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

M

SD

S

TO BE COMPLETED BY PROJECT ENGINEER

TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NUMBER OF COPIES REQUIRED =

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

Li ne N um be r

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S R

EC

O

M M

EN

D

AT

IO

N S

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER PROJECT TITLE SOLICITATION/ CONTRACT NUMBER

1058520 RH Maintenance Facility

Schedule of Material Submittals, MAR 05 (SAF/AQCP) / PREVIOUS FORM IS OBSOLETE

AF 66

File details come from the government source that posted it. Updated .