Atch_3_AF Form 66 Submittal Schedule_Amend 1_2 July 2020.xls
XLS spreadsheet 42 KB Posted
- Attached to
- RHS Vehicle Maintenance Pre-Engineered Building Federal contract opportunity
- Solicitation number
- FA4626-20-Q-0031
About this file
This document contains a submittal schedule for a pre-engineered vehicle maintenance building project for the Air Force. The schedule outlines 21 required submittals including preliminary designs, material delivery dates, structural designs, component shop drawings, samples, warranties, and installation guides. Key due dates include submissions with the proposal, 2 weeks after award for 65% designs, 4 weeks after award for component shop drawings and samples, and 5 weeks after award for final designs. The solicitation number is FA4626-20-Q-0031 and is for the purchase of one pre-engineered building at Rhineland Housing Maintenance Facility for the Department of the Air Force Global Strike Command. The schedule provides a template for tracking material submittals through the design, fabrication, and construction process to support the project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QnA Sheet_Revised_Cumulative.pdf | ||
| Amendment _001.pdf | ||
| Atch_1_RH Maintenance Facility PEB Specs_Amend 1_2July 2020.pdf | ||
| Conformed_COMBO.pdf | ||
| QnA Sheet.pdf | ||
| Revised RH Maintenance Facility PEB Specs.pdf | ||
| Atch_1_Maintenance Facility PEB Specs.pdf | ||
| Atch_3_AF Form 66 Submittal Schedule 20200124.pdf | ||
| Atch_2_Maintenance_Facility_PEB_30_20200129.pdf | ||
| COMBO.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions to Project Manager for Completing the AF 66 | |
| 1 | Save this Template Form 66 in your project folder as "AF 66 - FTQW XX-XXXX." |
| 2 | Enter project number and title/bldg number in the orange cells. |
| 3 | Review the schedule items not highlighted in yellow. If any item is not applicable to your project, select the row number and right-click to delete it. |
| 4 | Do not remove any of the yellow schedule items - these are required for every project. |
| 5 | When you have removed all unneeded schedule items, click on the light green cell. Grab the bottom right corner and "drag" your cursor to the last schedule item. This will re-number the items. |
| 6 | When you are finished, remove the highlighting from the sheet. (Hit Ctrl-A and then select "none" for Fill Color.) |
| 7 | Save your changes and email the file to the CONS administrator when you submit your package. |
AF 66
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | PROJECT TITLE | SOLICITATION/ CONTRACT NUMBER | ||||||||||||||||||||
| 1058520 | RH Maintenance Facility | ||||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED = | 3 | REQUIRED SUBMISSION DATE | |||||||||||||||||||||
| Line Number | ITEMS OR DESCRIPTION | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | MSDS | OTHER | PLANS | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBER | DATE CONTRACTOR | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |||
| OF ITEM, CONTRACT REFERENCE, TYPE OF | NOTIFIED | ||||||||||||||||||||||
| SUBMITTAL | APPROVED | DIS-APPROVED | |||||||||||||||||||||
| 1 | 35% Designs (Preliminary Designs) | x | With Proposal | ||||||||||||||||||||
| 2 | Proposed Material Delivery Date | x | With Proposal | ||||||||||||||||||||
| 3 | 65% Designs | ||||||||||||||||||||||
| *To include foundation | x | x | 2 weeks after award | ||||||||||||||||||||
| 4 | Insulated Roof Panels, Flashing, and Hardware | x | x | x | x | x | 4 weeks after award | ||||||||||||||||
| 5 | Insulated Wall Panels, Flashing, and Hardware to include gutters, downspouts, and overhangs | x | x | x | x | x | 4 weeks after award | ||||||||||||||||
| 6 | Personnel Doors and Hardware | x | x | 4 weeks after award | |||||||||||||||||||
| 7 | Roll-Up Doors and Hardware | x | x | x | x | 4 weeks after award | |||||||||||||||||
| 8 | 95% Designs | ||||||||||||||||||||||
| *To include foundation | x | x | 4 weeks after award | ||||||||||||||||||||
| 9 | Anchor bolt layout and design loads | x | x | 4 weeks after award | |||||||||||||||||||
| 10 | 100% Designs (Final Designs) | ||||||||||||||||||||||
| *To include foundation | x | x | 5 weeks after award | ||||||||||||||||||||
| 11 | Structural Steel Delivery, with relevant inventory lists and installation guides | X | 7 weeks after award | ||||||||||||||||||||
| 12 | Material Inventory List | x | x | NLT 3 weeks prior to proposed delivery date | |||||||||||||||||||
| 13 | Installation Guides | x | x | NLT 3 weeks prior to proposed delivery date | |||||||||||||||||||
| 14 | Remaining steel delivery | X | NLT150 days after award | ||||||||||||||||||||
| 15 | |||||||||||||||||||||||
| 16 | |||||||||||||||||||||||
| 17 | |||||||||||||||||||||||
| 17 | |||||||||||||||||||||||
| 19 | x | ||||||||||||||||||||||
| 18 | |||||||||||||||||||||||
| 19 | |||||||||||||||||||||||
| 20 | |||||||||||||||||||||||
| 21 | |||||||||||||||||||||||
| Schedule of Material Submittals, MAR 05 (SAF/AQCP) / PREVIOUS FORM IS OBSOLETE |