Changes_to_drawings_and_specs.pdf
PDF 49 KB Posted
- Attached to
- Repair Monitoring Wells
- Solicitation number
- FA462619RA005
About this file
Changes to drawings and specs.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Changes to project drawings:
1. Page 4 Detail 1 – “ADAPT TO SCHEDULE 80 1-1/4” HDPE PIPE WITH THREADED BRASS FITTING.
a. Changed HDPE to PVC.
2. Page 4 Detail 1 – “INSTALL A 1 ¼” BRASS SWING CHECK VALVE. DRILL A 1/8” HOLE IN THE SWING
CHECK VALVE BEHIND THE SWING FLAPPER TO ALLOW WATER TO DRAIN FROM THE RISER TO
PREVENT FREEZING.
a. Added “BODY” after VALVE and before BEHIND.
3. Page 4 Detail 7 – In the NOTES, changed slotted steel pipe to slotted PVC pipe.
4. Page 5 “SUPPORT BUILDING FLOOR PLAN” – adjusted the arrow from “MOUNT TOP OF….” To the appropriate location & moved the general notes reverences from “2”C. W/ 4#10…” over to “TO NEW DEWATERING WELL DISCONNECT” comment.
Changed to specifications:
1. 33 32 00-2 Section 3.5 – changed stainless steel well screen to Johnson PVC Vee-Wire 0.040” slotted well screen.
2. 33 23 00-6 Section 4.4.3 – removed “Well shall be grouted according to Montana State regulations.”
File details come from the government source that posted it.