Solictiation: FA4626-19-R-A005 Repair Monitoring Wells Attachment 5: Wage Determination
General Decision Number: MT190067 01/04/2019 MT67
Superseded General Decision Number: MT20180068
State: Montana
Construction Type: Heavy
County: Missoula County in Montana.
HEAVY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded
(and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set
Attachment 5: Wage Determination forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/04/2019
BOIL0011-003 08/01/2016
Rates Fringes
BOILERMAKER......................$ 30.25 29.86
CARP0028-011 06/01/2018
CARPENTER (Including Formwork)...$ 30.00 13.07
Zone Definition:
The hourly rate applicable to each project is determined by measuring the road miles over the shortest practical route from the County Courthouse of the following towns to the ceter of the job: Billings, Bozeman, Butte, Great Falls, Helena, Kalispell, Lewiston, Miles City, and Missoula
Zone 1: 0 to 30 miles - Base Rate
Zone 2: 31 to 60 miles - $4.00
Zone 3: over 60 miles - $6.00
ELEC0768-009 06/01/2018
ELECTRICIAN......................$ 30.51 13.83
ENGI0400-006 05/01/2013
POWER EQUIPMENT OPERATOR:
(Zone 1)
(1) A-frame truck Crane, Forklift, oiler (except crane)......................$ 23.47 10.40
Attachment 5: Wage Determination
(2) Excavator, Crane Oiler..$ 23.94 10.40
(3) Mechanic, Scraper.......$ 24.34 10.40
(4) Cranes 25-44 tons.......$ 27.00 11.40
(5) Cranes 45-74 tons.......$ 28.00 11.40
(6) Cranes 75 to 144 tons, whirley cranes..............$ 29.00 11.40
(7) Cranes, 150 tons to including 250 tons (add
$1.00 for every 100 tons over
250 tons); Crane, Stiff-
Leg or
Derrick; Helicopter
Hoist; Crane, Tower (all)...$ 30.00 11.40
ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:
The zone hourly rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the nearest County Court
House of the following listed towns to the center of the job:
BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL,
MISSOULA
Zone 1: 0 to 30 miles - Base Pay
Attachment 5: Wage Determination
Zone 2: 30 to 60 miles - Base Pay + $3.50
Zone 3: Over 60 miles - Base Pay + $5.50
IRON0014-015 07/01/2018
IRONWORKER: Reinforcing and
Structural.......................$ 27.25 24.37
PLUM0459-010 05/01/2018
PLUMBER..........................$ 31.48 14.53
* TEAM0190-001 05/01/2018
TRUCK DRIVER
(2) Water Truck
ZONE A.....................$ 28.88 9.37
(3) Water Truck
ZONE A.....................$ 30.13 9.37
ZONE B (30-60 miles from County Courthouse of listed
Attachment 5: Wage Determination cities*): Add $3.05 per hour to ZONE A rates
ZONE C (over 60 miles from County COurthouse of listed cities*): Add $4.85 per hour to ZONE A rates.
*Zone pay will be calculated from the city center of the following listed cities:
BILLINGS
BOZEMAN
BUTTE
GREAT FALLS
HELENA
KALISPELL
SUMT2011-043 02/07/2011
LABORER: Common or General......$ 16.91 9.08
OPERATOR: Asphalt Roller........$ 22.39 3.96
OPERATOR: Backhoe...............$ 22.12 8.37
OPERATOR: Bobcat/Skid
Steer/Skid Loader................$ 25.67 8.05
OPERATOR: Loader (Front End)....$ 22.67 6.54
PAINTER: Brush and Spray........$ 25.00 0.00
TRUCK DRIVER: Dump Truck........$ 19.38 4.74
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information
Attachment 5: Wage Determination on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or
"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of
Attachment 5: Wage Determination the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
Attachment 5: Wage Determination
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an
Attachment 5: Wage Determination interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
General Decision Number: MT190076 02/08/2019 MT76
Superseded General Decision Number: MT20180077
Counties: Big Horn, Carter, Daniels, Dawson, Fallon, Garfield, McCone, Phillips, Powder River, Prairie, Richland, Roosevelt, Rosebud, Sheridan, Treasure and Wibaux Counties in
Montana.
subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January
1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year
2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the
Davis-Bacon Related Acts, including those set forth at 29 CFR
5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
1 02/08/2019
* ELEC0233-021 06/01/2018
PHILLIPS COUNTY
ELECTRICIAN......................$ 31.50 14.26
ELEC0532-013 06/01/2018
BIG HORN, CARTER, DANIELS, DAWSON, FALLON, GARFIELD, MCCONE,
POWDER RIVER, PRAIRIE, RICHLAND, ROOSEVELT, ROSEBUD, SHERIDAN,
TREASURE, AND WILBAUX COUNTIES
ELECTRICIAN......................$ 34.08 14.59
ENGI0400-010 05/01/2013
(1) A-frame truck Crane, oiler (except crane)..$ 23.47 10.40
(2) Crane
Oiler,Bulldozer, Roller
(Dirt and Grade
Compaction), Backhoe........$ 23.94 10.40
(3) Mechanic................$ 24.34 10.40
(4) Cranes, 25 tons - 44 tons........................$ 27.00 11.40
(5) Cranes, 45 tons to and incl. 74 tons...............$ 28.00 11.40
(6) Cranes, 75 tons to and incl. 149 tons; Cranes, Whirley (All)...............$ 29.00 11.40
(7) Cranes, 150 tons to determined by measuring the road miles over the shortest practical maintained route from the nearest County Court
IRON0732-018 06/01/2018
Structural.......................$ 27.25 21.77
SUMT2011-052 02/08/2011
CARPENTER (Form Work Only).......$ 24.30 7.80
CARPENTER, Excludes Form Work....$ 21.13 7.00
LABORER: Common or General......$ 17.99 5.90
LABORER: Pipelayer..............$ 21.10 5.46
LABORER: Landscape and
Irrigation.......................$ 15.14 1.30
Steer/Skid Loader................$ 23.53 8.05
OPERATOR: Excavator.............$ 23.62 8.05
OPERATOR: Grader/Blade..........$ 25.44 8.45
OPERATOR: Loader (Front End)....$ 24.58 8.05
OPERATOR: Scraper...............$ 23.00 6.76
TRUCK DRIVER: Dump Truck........$ 19.99 5.09
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage
* a Wage and Hour Division letter setting forth a position on
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial
U.S. Department of Labor interested party (those affected by the action) can request
General Decision Number: MT190078 01/04/2019 MT78
Superseded General Decision Number: MT20180079
Counties: Lake, Lincoln, Mineral, Ravalli and Sanders
Counties in Montana.
subject to the Davis-Bacon Act for which the contract is awarded
(and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
* ELEC0768-010 06/01/2018
ELECTRICIAN......................$ 30.51 13.83
ENGI0400-009 05/01/2013
(1) A-frame truck Crane, oiler (except crane).......$ 23.47 10.40
(2) Crane Oiler,Bulldozer, Roller (Dirt and Grade
Compaction).................$ 23.94 10.40
(3) Mechanic, Scraper.......$ 24.34 10.40
(4) Cranes, 25 tons - 44 tons........................$ 27.00 11.40
(5) Cranes, 45 tons to and incl. 74 tons...............$ 28.00 11.40
(6) Cranes, 75 tons to and incl. 149 tons; Cranes, Whirley (All)...............$ 29.00 11.40
(7) Cranes, 150 tons to determined by measuring the road miles over the shortest practical maintained route from the nearest County Court
IRON0014-016 07/01/2018
Structural.......................$ 27.25 24.37
SUMT2011-054 02/08/2011
CARPENTER (Form Work Only).......$ 24.30 7.80
CARPENTER, Excludes Form Work....$ 21.13 7.00
LABORER: Common or General......$ 17.99 5.90
LABORER: Pipelayer..............$ 21.81 4.83
LABORER: Landscape and
Irrigation.......................$ 15.14 1.30
OPERATOR: Backhoe...............$ 21.44 8.05
Steer/Skid Loader................$ 21.99 8.55
OPERATOR: Excavator.............$ 22.94 9.05
OPERATOR: Grader/Blade..........$ 24.69 8.40
OPERATOR: Loader (Front End)....$ 24.20 7.84
TRUCK DRIVER: Dump Truck........$ 18.84 5.92
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage
* a Wage and Hour Division letter setting forth a position on
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial interested party (those affected by the action) can request
| Wage Determination MT67 |
| Wage Determination MT76 |
| Wage Determination MT78 |