Reponse_to_Questions4.pdf
PDF 31 KB Posted
- Attached to
- Repair Transformer & Cabling System, Bldg 3080 Federal contract opportunity
- Solicitation number
- FA4626-16-R-0018
About this file
Response to Questions 4/Clarifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site_Visit.pdf | ||
| Reponse_to_Questions3.pdf | ||
| Reponse_to_Questions2.pdf | ||
| Response_to_Questions.pdf | ||
| 262416_-_PANELBOARDS.pdf | ||
| Attach_6_Base_Entry.pdf | ||
| Attach_2_SCHEDULE_OF_DRAWINGS.pdf | ||
| Solicitation.doc | DOC document | |
| Attach_3_Submittal_Schedule.pdf | ||
| Attach_5_Wage_Determination.docx | DOCX document | |
| Attach_7_Special_Contract_Requirements.docx | DOCX document | |
| Attach_1_Specs.zip | ZIP file | |
| Attch_9_Subcontractor_Consent.doc | DOC document | |
| Attch_8_Past_Performance_Questionaire.docx | DOCX document | |
| Attach_4_ALL_DWGS_COMBINED.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4626-16-R-0018
Reponse to Questions
Clarifications:
-- --Per Specifications 01 73 20.1.2.A.1, the concrete pad for the 750 kva transformer shall be removed.
Install backfill and asphalt patch for the area where the pad was removed.
This may have not been clear. This is to clarify that the pad is to be removed.
File details come from the government source that posted it. Updated .