Reponse_to_Questions3.pdf

PDF 41 KB Posted

Attached to
Repair Transformer & Cabling System, Bldg 3080 Federal contract opportunity
Solicitation number
FA4626-16-R-0018
Issued by
Department of the Air Force Global Strike Command

About this file

Response to Questions 3

View the file

Other files for this federal contract opportunity

Other files attached to Repair Transformer & Cabling System, Bldg 3080, newest first.
File Type Posted
Reponse_to_Questions4.pdf PDF
Site_Visit.pdf PDF
Reponse_to_Questions2.pdf PDF
Response_to_Questions.pdf PDF
262416_-_PANELBOARDS.pdf PDF
Attch_8_Past_Performance_Questionaire.docx DOCX document
Attach_4_ALL_DWGS_COMBINED.pdf PDF
Attach_6_Base_Entry.pdf PDF
Attach_2_SCHEDULE_OF_DRAWINGS.pdf PDF
Attach_7_Special_Contract_Requirements.docx DOCX document
Attach_1_Specs.zip ZIP file
Attch_9_Subcontractor_Consent.doc DOC document
Solicitation.doc DOC document
Attach_3_Submittal_Schedule.pdf PDF
Attach_5_Wage_Determination.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4626-16-R-0018

Reponse to Questions

Clarifications:

-- Contractor to dispose of transformers. Test of the oil-filled transformer indicate PCB levels of less than 2 parts per million. Test results will be provided to the successful bidder after contract award for use during disposal.

--Existing fence fabric, posts, and brick columns to be removed re-built as necessary for removal of existing transformer and installation of new transformer, transformer pad, and ground ring.

--Install washed gravel mulch in all areas with gravel mulch. This is to include any additional gravel mulch in the entire area where the new sectionalizer is installed.

Questions:

1.-Solicitation says we are to hold price for 282 days. On page 30 under B. PROPOSAL PREPERATION INSTRUCTIONS it says 300 days. Which is correct?

300 days

2. All manholes are full of water.

Contractor shall pump the manholes as necessary to accomplish the work of the project.

3.- Detail 2 E1.0 note 6 says that conduits are 4" and 5". They are in fact 2-4".

Noted. Existing to location of new sectionalizer is 4-inch. Install 4-inch conduits for new primary from the new sectionalizer to the new transformer.

4. Page E1.0 shows a 4" conduit for cable and a 4" for spare. We can only find three pipes in the existing sectionalizer. There does not appear to be 2 conduits between the sectionalizers. Is one missing?

There are two existing 4-inch conduits in the ductbank from the area near Pole G-7 to the existing sectionalizer. There is one existing 4-inch conduit in the ductbank between the existing sectionalizer and the vicinity of the new sectionalizer.

5. Many of the conduits are full of water.

Noted. The Contractor shall use necessary means to overcome or remove to water as necessary to install pull strings, pull ropes, and conductors.