Attach_3_Submittal_Schedule.pdf
PDF 62 KB Posted
- Attached to
- Repair Transformer & Cabling System, Bldg 3080 Federal contract opportunity
- Solicitation number
- FA4626-16-R-0018
About this file
submittal schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Reponse_to_Questions4.pdf | ||
| Site_Visit.pdf | ||
| Reponse_to_Questions3.pdf | ||
| Reponse_to_Questions2.pdf | ||
| Response_to_Questions.pdf | ||
| 262416_-_PANELBOARDS.pdf | ||
| Attach_6_Base_Entry.pdf | ||
| Attach_2_SCHEDULE_OF_DRAWINGS.pdf | ||
| Solicitation.doc | DOC document | |
| Attach_5_Wage_Determination.docx | DOCX document | |
| Attach_7_Special_Contract_Requirements.docx | DOCX document | |
| Attach_1_Specs.zip | ZIP file | |
| Attch_9_Subcontractor_Consent.doc | DOC document | |
| Attch_8_Past_Performance_Questionaire.docx | DOCX document | |
| Attach_4_ALL_DWGS_COMBINED.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2 FA 4626-XX-X-XXX
SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.
NZAS 14-0020 Repair Electrical Cabling and Transformer at B-3080 FA4626-16-R-0018
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
DATE CONTRACTOR NOTIFIED
APPROVED DIS- APPROVED
Section 01 00 00 - General Requirements, Par. 3.5; As Built
Field Data 2 3d PTFI
Section 01 00 00 - General Requirements, Par. 3.7; O & M
Manuals
4 PTFA
Section 01 00 00 - General Requirements, Par. 3.8.1;
Contractor Furnished Equipment List
10d
PTFI
Section 01 00 00 - General Requirements, Par. 3.8.2;
Contractor Furnished List of Equipment-In-Place
10d
PTFI
Section 01 00 00 - General Requirements, Par. 3.8.3;
Contractor Guarantees
10d
PTFI
Section 01 00 00 - General Requirements, Par. 3.11; Start of
Work Notification
5d
PTSW
Section 01 00 00 - General Requirements, Par. 3.12; Notice of Final Inspection
14d
PTFI
Section 01 00 00 - General Requirements, Par. 3.13;
Construction Near Utility Systems
5d
PTSW
Section 01 00 00 - General Requirements, Par. 3.14; Utility
Outages
14d
PTSW
Section 01 00 00 - General Requirements, Par. 3.18.5;
Quality Control Plan
15d
ACA
Section 01 00 00 - General Requirements, Par. 3.20; Form
1354 Checklist (Property Inventory Checklist)
10d
PTFI
Section 01 00 00 - General Requirements, 3.22; Par.
Nuclear Densometers
30d PT use
Section 01 36 00 - Environmental Procedures, Par. 2.2;
Copy of Enviromental Permits
15d
ACA
Section 01 36 00 - Environmental Procedures, Par. 4.3.1.B;
Storm Water Discharge Permit and Pollution Prevention
Plan
15d
ACA
Section 01 36 00 - Environmental Procedures, Par. 8.1.2;
Hazardous Material Form
15d
ACA
L
IN
E N
U M
B E
R
C E
R T
IF
IC
A T
IO
N
O F
C
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
M A
N U
F A
C T
U R
E R
'S
W A
R R
A N
T Y
M A
N U
F A
C T
U R
E
E
C O
M M
E N
D A
T
IO
N S
R E
Q U
IR
D
S U
B M
IS
S
IO
N
D A
T
(B Y
C O
N T
R A
C T
O R
Number of Copies Required
O P
E R
A T
IN
G
T R
U C
T
IO
N S
T E
S T
R E
P O
R T
S
O T
H E
R
C A
T A
L O
G D
A T
A
REMARKS
D A
T E
R E
C E
IV
E
D I
N
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
F
IN
A L
A P
P R
O V
A L
C O
N T
R A
C T
S U
B M
IT
T
L
NZAS 14-0020 Repair Electrical Cabling and Transformer at B-3080 FA4626-16-R-0018
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
DATE CONTRACTOR NOTIFIED
APPROVED DIS- APPROVEDL
IN
E N
U M
B E
R
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
M A
N U
F A
C T
U R
E
R R
A N
T Y
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
R E
Q U
IR
B M
IS
S
IO
N
D A
C O
N T
R A
C T
O R
Number of Copies Required
O P
E R
A T
T R
U C
T
IO
N S
T E
S T
R E
P O
R T
S
O T
H E
R
C A
T A
L O
G D
A T
A
REMARKS
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
F
IN
A L
A P
P R
O V
A L
C O
N T
R A
C T
S U
B M
IT
T
Section 01 36 00 - Environmental Procedures, Par. 8.1.2;
EPCRA List of Extremely Hazardous Materials
15d
ACA
Section 01 36 00 - Environmental Procedures, Par. 11.5;
Solid Waste Disposal and Diversion Documentation 1 3d SRO
Section 01 36 00 - Environmental Procedures, Par. 12.4;
Recovered Materials Written Determination Form
10d
PTCW
Section 01 36 00 - Environmental Procedures, Par. 12.5;
Recycled Material Use Report
10d
PTCW
Section 01 73 10 Cutting & Patching 01 73 10 - 1.4.A. List of locations, changes, products, utilities & proposal of items to be cut.
10d
PTSW
Section 01 73 10 Cutting & Patching - 3.1.B. Asbestos inspection results 3 1d AWC
Section 01 73 20 Selective Demolition - 1.5.B. Schedule of
Selective Demolition Activities.
10d
PTSW
Section 03 30 00 Cast-in-Place Concrete - 1.3.B. Product
Data
15d
ANTP
Section 03 30 00 Cast-in-Place Concrete - 1.3.C. Shop
Drawings
15d
ANTP
Section 03 30 00 Cast-in-Place Concrete - 1.3.D.
Laboratory test reports for concrete materials and mix design test
3 5d ATT
Section 03 30 00 Cast-in-Place Concrete - 1.3.E. Material
Certificates 3 5d ATT
27 Section 03 30 00 Cast-in-Place Concrete - 3.14.C. Testing 3 5d ATT
Section 03 30 00 Cast-in-Place Concrete - 3.14.C.
Additional Testing 3 5d ATT
Section 07 84 13 Penetration Firestopping - 1.3.A. Product
Data 3 3
15d
ANTP
Section 07 84 13 Penetration Firestopping - 1.3.B. Project
Schedule
15d
ANTP
NZAS 14-0020 Repair Electrical Cabling and Transformer at B-3080 FA4626-16-R-0018
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
DATE CONTRACTOR NOTIFIED
APPROVED DIS- APPROVEDL
IN
E N
U M
B E
R
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
M A
N U
F A
C T
U R
E
R R
A N
T Y
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
R E
Q U
IR
B M
IS
S
IO
N
D A
C O
N T
R A
C T
O R
Number of Copies Required
O P
E R
A T
T R
U C
T
IO
N S
T E
S T
R E
P O
R T
S
O T
H E
R
C A
T A
L O
G D
A T
A
REMARKS
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
F
IN
A L
A P
P R
O V
A L
C O
N T
R A
C T
S U
B M
IT
T
Section 07 84 13 Penetration Firestopping - 1.4. A.
Qualification Data: For qualified Installer
15d
ANTP
Section 07 84 13 Penetration Firestopping - 1.4. B. Installer
Certificates
15d
ANTP
Section 07 84 13 Penetration Firestopping - 1.4. C. Product
Test Results
15d
ANTP
Section 26 00 00 General Provisions for Electrical Work -
1.17. Completion Tests
15d
ANTP
Section 26 00 00 General Provisions for Electrical Work -
1.18. O&M Manuals
3 3
15d
ANTP
36 Section 26 05 13 Medium-Voltage Cables - 1.2.A. 3 3 15d
ANTP
Section 26 05 13 Medium-Voltage Cables - 3.2.A. Meggar
Test 3 5d ATT
Section 26 05 19 Low-Voltage Electrical Power Conductors and Cables - 1.3.
15d
ANTP
Section 26 05 19 Low-Voltage Electrical Power Conductors and Cables - 1.4.
3 3
15d
ANTP
Qualifications
Section 26 05 26 Grounding and Bonding for Electrical
Systems - 1.3.A Product Data
15d
ANTP
Section 26 05 26 Grounding and Bonding for Electrical
Systems - 1.3.B Layout, Wiring Diagram 3 3
15d
ANTP
Section 26 05 26 Grounding and Bonding for Electrical
Systems - 1.3.C Test Report 3 3d ATT
Section 26 05 29 Hangers and Supports for Electrical
Systems - 1.3.
15d
ANTP
Section 26 05 33 Raceways and Boxes for Electrical
Systems - 1.4. Product Data
15d
ANTP
Section 26 05 43 Underground Ducts and Raceways for
Electrical Systems - 1.4. Product Data
NZAS 14-0020 Repair Electrical Cabling and Transformer at B-3080 FA4626-16-R-0018
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
DATE CONTRACTOR NOTIFIED
APPROVED DIS- APPROVEDL
IN
E N
U M
B E
R
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
M A
N U
F A
C T
U R
E
R R
A N
T Y
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
R E
Q U
IR
B M
IS
S
IO
N
D A
C O
N T
R A
C T
O R
Number of Copies Required
O P
E R
A T
T R
U C
T
IO
N S
T E
S T
R E
P O
R T
S
O T
H E
R
C A
T A
L O
G D
A T
A
REMARKS
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
F
IN
A L
A P
P R
O V
A L
C O
N T
R A
C T
S U
B M
IT
T
Section 26 05 53 Identification for Electrical Systems - 1.3.
Product Data
15d
ANTP
47 Section 26 24 13 Switchboards - 1.03.A. Shop Drawings 3 3 15d
ANTP
Section 26 24 13 Switchboards - 1.07. Maintenance
Materials 1 5d PFI
Section 26 05 33 Raceways and Boxes for Electrical
Systems - 1.3.A
15d
ANTP
Section 26 05 33 Raceways and Boxes for Electrical
Systems - 1.3.B
15d
ANTP
51 Section 26 24 16 Panelboards - 1.3.A 3 15d
ANTP
52 Section 26 24 16 Panelboards - 1.3.B 3 15d
ANTP
53 Section 26 24 16 Panelboards - 1.4.A. Panel Schedules 3 5d PFI
54 Section 26 24 16 Panelboards - 1.4.B. O&M Manuals 3 30d
PPC
Section 26 24 16 Panelboards - 1.5.A. Maintenance
Materials
30d
PPC
56 Section 26 27 10 Distribution Transformers - 1.3.A. 3 15d
ANTP
Section 26 27 10 Distribution Transformers - 1.3.B. O&M
Manuals
30d
PPC
Section 26 27 10 Distribution Transformers - 1.3.C. Oil
Analysis 3 5d PFI
Section 26 27 10 Distribution Transformers - 1.3.D.
Pentahead Sockets
30d
PPC
Section 26 28 16 Enclosed Switches and Circuit Breakers -
1.3 Product Data
NZAS 14-0020 Repair Electrical Cabling and Transformer at B-3080 FA4626-16-R-0018
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
DATE CONTRACTOR NOTIFIED
APPROVED DIS- APPROVEDL
IN
E N
U M
B E
R
C E
R T
IF
IC
A T
IO
N
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF
SUBMITTAL
M A
N U
F A
C T
U R
E
R R
A N
T Y
M A
N U
F A
C T
U R
E
C O
M M
E N
D A
T
IO
N S
R E
Q U
IR
B M
IS
S
IO
N
D A
C O
N T
R A
C T
O R
Number of Copies Required
O P
E R
A T
T R
U C
T
IO
N S
T E
S T
R E
P O
R T
S
O T
H E
R
C A
T A
L O
G D
A T
A
REMARKS
D A
T E
R E
C E
IV
E
D
N T
R A
C T
IN
G
D A
T E
T O
C
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
T E
S U
B M
IT
T
A L
N U
M B
E R
S
F
IN
A L
A P
P R
O V
A L
C O
N T
R A
C T
S U
B M
IT
T
Section 26 34 10 - Medium Voltage Sectionalizers, Par.
1.3.A. Product Data
15d
ANTP
Section 26 36 00 - Transfer Switches, Par. 1.3.A. Product
Data
15d
ANTP
Section 26 36 00 - Transfer Switches, Par. 1.3.B. Shop
Drawings
15d
ANTP
Section 26 36 00 - Transfer Switches, Par. 1.4. O&M
Manuals 3 3 3
15d
ANTP
65 Section 26 36 00 - Transfer Switches, Par. 3.3. Test Report 3 5d ATT
Section 31 20 00 - Earthwork, Par. 1.4.A; Base and sub base material sieve analysis and proctor. Subgrade proctor.
3 5d ATT
Section 31 20 00 - Earthwork, Par. 1.4.B; Compaction Test
Results 3 5d ATT
Section 32 12 16 - Asphaltic Pavement Replacement, Par.
1.2; Material Submittals
10d
PTSW
69 Section 32 29 00 - Rock Mulch, Par. 1.2; Material Submittals 3 3 3 10d
PTSW
Abbreviations:
D - Days PSW - Prior to Start Work PFI - Prior to Final Inspection
AFI - After Final Inspection BBCW - Before Beginning Concrete Work PPC - Prior to Project Completion
ANP - After Notice to Proceed BD - Before Delivery PT - Prior to Testing
ATT - After Test is Taken PBC - Prior to Beginning Construction SRO - After Each Occurance
File details come from the government source that posted it. Updated .