Attachment 2 Submittal Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Add Anti Ram Cables, newest first.
File Type Posted
QUESTIONS_and_ANSWERS_Group_E.docx DOCX document
QUESTIONS_and_ANSWERS_Group_D.docx DOCX document
COMBINED_FINAL_DRAWINGS.pdf PDF
Updated_Specs_MAF_Anti-Ram_Cables.pdf PDF
Anti_Ram_Amendment_2.pdf PDF
QUESTIONS_and_ANSWERS_Group_C.docx DOCX document
QUESTIONS_FOR_FA4626_(002)_(Rev_1)_Group_B.docx DOCX document
Anti_Ram_Questions_(Rev1)_Group_A.docx DOCX document
Pre-Proposal_Sign_In_and_Agenda_9_June_2016.pdf PDF
CE_Pre-Proposal_Slide_Show.pptx PPTX presentation
Anti_Ram_Amendment_1.pdf PDF
Attachment_1_Specs.pdf PDF
Attachment_4_-Drawings.pdf PDF
Attachment_6_-Base_Entry.pdf PDF
Attchment_9_-Subcontractor_Consent.doc DOC document
Attachment_7_-Special_Contract_Requirements.pdf PDF
Attachment_8_-Past_Performance_Questionaire.pdf PDF
Attachment_3_-Schedule_of_Drawings.pdf PDF
Anti_Ram_Solicitation.pdf PDF
Attachment_5_wage_determinations.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 2

AF Form 66 02:

Attch 2 add anti-ram cables-4/14/2016

SS-1

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-16-R-0005

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

ER

'S

R

EC

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

R

W

A R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

N

G

IN

ST

R U

C

TI

O N

S

N O

TI

FI

C A

TI

O

N

O

TH

ER

R

EQ

U

IR

ED

S

U

BM

IS

SI

O

D

TE

(B

Y

C

N

TR

A C

TO

R

D A

TE

R

EC

EI

V

ED

N

TR

A C

TI

N

G

D A

TE

T

O M

IS

SI

LE

EN

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

S U

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

TO

ES

U

BM

IT

TA

L

FI

N

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

1 GENERAL REQUIREMENTS 01 00 00 - 3.6.3 project Construction Work Schedule/ Gantt chart

4 20d

ANTP

2 GENERAL REQUIREMENTS 01 00 00 - 3.6.4 Weekly Construction Work Schedule 4 Weekly

* Tenative Work Schedule at Pre-Performance Meeting

3 GENERAL REQUIREMENTS 01 00 00 - 3.6.5 Pre Work Briefing to USAF Leadership 4 20d

ANTP

4 GENERAL REQUIREMENTS 01 00 00 - 3.8 Start of Work Notification 4 10d

PTSW

5 GENERAL REQUIREMENTS 01 00 00 - 3.11 Utility Outages 4 10d

PTO

6 GENERAL REQUIREMENTS 01 00 00 - 3.13.2 Quality Control Plan 4 10d

ANTP

7 GENERAL REQUIREMENTS 01 00 00 - 3.13.5 Quality Control Records 1 EWD

8 GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.16.5 As-Built Drawings RED LINES 4 10d AFI

9 GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.16.5 As-Built Drawings (Autocad and PDF formats) 4 30d AFI

10 GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.16.

O&M Manuals 4 30d AFI

11 GENERAL REQUIREMENTS 01 00 00 - 3.27 Notice of Final Inspection 4 3d PTFI

GENERAL REQUIREMENTS 01 00 00 - 1.8 and 3.21 Contruction Near Utilities, Work Clearance Request (AF Form 103)

4 3d PTO

13 GENERAL REQUIREMENTS 01 00 00 - 3.26.1

Confined Space Plan 4 30d

PTFP

Number of Copies Required

NZAS 16-6020 Add Anti-ram Cables

02:

Attch 2 add anti-ram cables-4/14/2016

SS-2

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-16-R-0005

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

N O

TI

FI

C A

TI

O

N

O

TH

ER

R

EQ

U

IR

ED

S

U

BM

IS

SI

N

TR

A C

TO

R

D A

TE

R

EC

EI

V

N

TR

A C

TI

N

G

D A

TE

T

O M

IS

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

S U

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

BM

IT

TA

L

FI

N

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

Number of Copies Required

NZAS 16-6020 Add Anti-ram Cables

14 ENVIRONMENTAL PROTECTION 01 36 00 - 2.3

Dewatering Discharge Permit 4 15d

PTSW

15 ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.1

Hazardous Materials List Attachment 5 4 10d

SRO

16 ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.1

Hazardous Materials List Attachment 5 4 10d

SRO

17 ENVIRONMENTAL PROTECTION 01 36 00 - 8.1.4

Hazmat Final Report 4 PTFA

18 CAST-IN-PLACE CONCRETE 03 30 00- 1.3.1.1

Concrete Mix Design 4 15 d

ANTP

19 CAST-IN-PLACE CONCRETE 03 30 00- 1.3.2 Concrete Mix Design Lab Tests 4 15 d

ANTP

20 CAST-IN-PLACE CONCRETE 03 30 00- 2.1.5 Fiber Expansion Joint 4 15 d

ANTP

21 CAST-IN-PLACE CONCRETE 03 30 00- 3.17.2.1

Fresh Concrete tests 4 15 d

ANTP

22 CAST-IN-PLACE CONCRETE 03 30 00- 3.17.2.1

Compressive Break Tests 4 15 d

ANTP

23 CAST-IN-PLACE CONCRETE 03 30 00- 3.17.2.1

Compressive Break Tests 4 15 d

ANTP

24 FLOWABLE FILL 03 31 00 - 1.3.2. Mix Design 4 15 d

ANTP

25 PLANT PRECAST CONCRETE PRODUCTS FOR

BELOW GRADE 03 40 00.00 10 1.3 - Quality Assurance 4 15 d

ANTP

26 PLANT PRECAST CONCRETE PRODUCTS FOR

BELOW GRADE 03 40 00.00 10 1.3.2.4 - Test Results 4 15 d

ANTP

PLANT PRECAST CONCRETE PRODUCTS FOR

BELOW GRADE 03 40 00.00 10 2.1.1 - Standard Precast Units

4 15 d

ANTP

02:

Attch 2 add anti-ram cables-4/14/2016

SS-3

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-16-R-0005

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

N O

TI

FI

C A

TI

O

N

O

TH

ER

R

EQ

U

IR

ED

S

U

BM

IS

SI

N

TR

A C

TO

R

D A

TE

R

EC

EI

V

N

TR

A C

TI

N

G

D A

TE

T

O M

IS

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

S U

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

BM

IT

TA

L

FI

N

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

Number of Copies Required

NZAS 16-6020 Add Anti-ram Cables

28 WELDING 05 05 33 1.2 -Welding Quality Assurance Plan 4 15 d

ANTP

29 WELDING 05 05 33 1.2 -Welding Procedure Qualifications 4 15 d

ANTP

30 WELDING 05 05 33 1.2 -Welder, Welding Operator, and Tacker Qualification 4 15 d

ANTP

31 WELDING 05 05 33 1.2 -Inspector Qualification 4 15 d

ANTP

32 WELDING 05 05 33 1.2 -Previous Qualifications 4 15 d

ANTP

33 WELDING 05 05 33 1.2 -Pre-Qualified Procedures 4 15 d

ANTP

34 WELDING 05 05 33 1.2.1 -Welding Electrodes and Rods 4 15 d

ANTP

35 WELDING 05 05 33 1.2.1-Nondestructive Testing 4 15 d

ANTP

36 WELDING 05 05 33 1.2.1-Certified Welding Procedure Specifications (WPS) 4 15 d

ANTP

37 WELDING 05 05 33 1.2.1-Certified Procedure Qualification Records (PQR) 4 15 d

ANTP

38 WELDING 05 05 33 1.2.1-Certified Welder Performance Qualifications (WPQ) 4 15 d

ANTP

39 Structural Steel 05 12 00 1.2 - Fabrication Drawings 4 15 d

ANTP

40 Structural Steel 05 12 00 1.2 - Galvanizing touchup 4 15 d

ANTP

41 Structural Steel 05 12 00 1.2 - Test Reports for Weld Inspection Reports 4 15 d

02:

Attch 2 add anti-ram cables-4/14/2016

SS-4

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-16-R-0005

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

N O

TI

FI

C A

TI

O

N

O

TH

ER

R

EQ

U

IR

ED

S

U

BM

IS

SI

N

TR

A C

TO

R

D A

TE

R

EC

EI

V

N

TR

A C

TI

N

G

D A

TE

T

O M

IS

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

S U

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

BM

IT

TA

L

FI

N

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

Number of Copies Required

NZAS 16-6020 Add Anti-ram Cables

42 Structural Steel 05 12 00 1.2 - Embrittlement Test Reports 4 15 d

ANTP

43 Structural Steel 05 12 00 1.2 - Steel Certificates 4 15 d

ANTP

44 Structural Steel 05 12 00 1.2 - Bolts, nuts, and washers Certificates 4 15 d

ANTP

45 Structural Steel 05 12 00 1.2 - Galvanizing Certificates 4 15 d

ANTP

46 Structural Steel 05 12 00 1.2 - Welding electrodes and rods Certificates 4 15 d

ANTP

47 Electrical Power Conductors and Cables 26 05 19 Product Data Conductors, insulations, Splices 4 15 d

ANTP

48 Electrical Grounding and Bonding 26 05 26 Product Data Conductors, insulations, Connectors 4 15 d

ANTP

Electrical Hanger and Supports 26 05 29 Product Data metal and non-metal slotted support systems and components, equipment supports

4 15 d

ANTP

Raceways and Boxes for Electrical Systems 26 05 33 Product Data wire ways, fittings, floor boxes, enclosures, covers

4 15 d

ANTP

Raceways and Boxes for Electrical Systems 26 05 33 Shop drawings for duct bank and pull boxes (see precast section)

4 15 d

ANTP

52 Cathodic Protection 26 42 00 Product data for cables, cable identification, connection types 4 15 d

ANTP

53 Cathodic Protection 26 42 00 Shop Drawings for post connections and attachements to existing system 4 15 d

ANTP

54 EXCAVATION & TRENCHING 31 21 00 - 2.1

Underground Marker tape 4 15 d

ANTP

55 FENCING 32 31 13.53 Technical data, installation instructions 4 15 d

02:

Attch 2 add anti-ram cables-4/14/2016

SS-5

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-16-R-0005

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

N O

TI

FI

C A

TI

O

N

O

TH

ER

R

EQ

U

IR

ED

S

U

BM

IS

SI

N

TR

A C

TO

R

D A

TE

R

EC

EI

V

N

TR

A C

TI

N

G

D A

TE

T

O M

IS

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

BM

IT

TA

L

FI

N

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

Number of Copies Required

NZAS 16-6020 Add Anti-ram Cables

56 Vehicle Crash Barriers 34 71 13.16 - 1.1 Bollards, C-channel 4 15 d

ANTP

Vehicle Crash Barriers 34 71 13.16 - 1.1 Traffic Medians

(PLANT PRECAST CONCRETE PRODUCTS FOR

BELOW GRADE)

4 15 d

ANTP

58 Vehicle Crash Barriers 34 71 13.16 - 1.1 Cable 4 15 d

ANTP

59 Vehicle Crash Barriers 34 71 13.16 - 1.1 Swage Fitting, Swage Machine. 4 4 15 d

ANTP

60 Vehicle Crash Barriers 34 71 13.16 - 1.1 Swage quality tools (1 set) and tolerances 1 4 15 d

ANTP

61 Vehicle Crash Barriers 34 71 13.16 - 1.1 Swage terminal end manufacturing instructions 4 15 d

ANTP

62 Vehicle Crash Barriers 34 71 13.16 - 1.1 Grips, Thimbles, and Turnbuckles

15 d

ANTP

63 Active Vehicle Barriers 34 71 13.19 - 1.1 Installation, Equipment, Electrical Work Shop Drawings 4 15 d

ANTP

64 Active Vehicle Barriers 34 71 13.19 - 1.1 Barrier System Product data 4 15 d

ANTP

65 Active Vehicle Barriers 34 71 13.19 - 1.1 Spare Parts Product Data 4 15 d

ANTP

66 Active Vehicle Barriers 34 71 13.19 - 1.1 Fielding Testing 4 15 d

ANTP

67 Active Vehicle Barriers 34 71 13.19 - 1.1 Barrier System Operation and Maintenance Data 4 15 d

ANTP

68 Active Vehicle Barriers 34 71 13.19 - 1.1 Barrier System Operation and Maintenance Instructions 4 15 d

02:

Attch 2 add anti-ram cables-4/14/2016

SS-6

REQUIRED TECHNICAL SUBMITTALS

SCHEDULE OF MATERIALS SUBMITTALS Project Number Project Title: Solicitation/Contract No.

FA4626-16-R-0005

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR

LI

N

E N

U M

BE

R

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

ER

TI

FI

C A

TI

O

N O

F C

O M

PL

IA

N C

E

SH

O

P D

R A

W

IN

G S

SA

M

PL

ES

C O

LO

R

S

EL

EC

TI

O N

M A

N U

FA

C

TU

R

O

M M

EN

D

A

TI

O N

S

M A

N U

FA

C

TU

R

R

R A

N

TY

C A

TA

LO

G D

A

TA

O

PE

R A

TI

R U

C

TI

O N

S

N O

TI

FI

C A

TI

O

N

O

TH

ER

R

EQ

U

IR

ED

S

U

BM

IS

SI

N

TR

A C

TO

R

D A

TE

R

EC

EI

V

N

TR

A C

TI

N

G

D A

TE

T

O M

IS

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D A

TE

SU

BM

IT

TA

L N

U M

BE

R

S

DATE CONTRACTOR NOTIFIED

C O

N

TR

A C

U

BM

IT

TA

L

FI

N

A L

A

PP

R O

V A

L

REMARKS

APPROVED DIS-

APPROVED

Number of Copies Required

NZAS 16-6020 Add Anti-ram Cables

Schedule of Abbreviations:

AWC = After Work Completed = Before Material Delivery

PTSW = Prior to Starting Work SN = Advance Notification

AFA = After Final Acceptance SRO = After Each Occurrence

PTO = Prior to Outage PTFI = Prior to Final Inspection

PTNP = Prior to Notice to Proceed PTFP = Prior to Final Payment

ANTP = After Notice to Proceed PTCW = Prior to Completing Work

EWD = Each work day AF Form 3000 not required AFI = After Final Inspection