WageDetermination.doc

DOC document 83 KB Posted

Attached to
Pavement Requirements Federal contract opportunity
Solicitation number
FA4626-08-R-0009
Issued by
Department of the Air Force Global Strike Command

About this file

Attch 3 Wage Determination

View the file

Other files for this federal contract opportunity

Other files attached to Pavement Requirements, newest first.
File Type Posted
Questions.pdf PDF
Solicitation.doc DOC document
SubmittalScheduleR1_08-1021.xls XLS spreadsheet
Spec's.zip ZIP file
PastPerfQuestionaire_Atch4.doc DOC document
CoverPagesandTOC.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3 FA4626-08-R-0009

General Decision Number: MT080001 02/08/2008 MT1

Superseded General Decision Number: MT20070001

State: Montana

Construction Type: Heavy

Counties: Montana Statewide.

HEAVY CONSTRUCTION PROJECTS

ZONE DEFINITIONS

CARPENTERS, *CEMENT MASONS, LABORERS, AND TRUCK DRIVERS

The zone hourly rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the nearest County Court House of the folowing listed towns to the center of the job:

BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HAVRE, HELENA,

KALISPELL, LEWISTOWN, MILES CITY, MISSOULA

Zone 1: 0 to 30 miles - Base Pay

Zone 2: 30 to 60 miles - Base Pay + $2.95

Zone 3: Over 60 miles - Base Pay + $4.70

*CEMENT MASONS ZONES: The above cities plus DILLON, GLASGOW, GLENDIVE, SIDNEY

Modification Number Publication Date

0 02/08/2008

CARP0028-002 05/01/2007

Rates Fringes

Carpenters: (Zone 1)

Carpenter & Pilebuck........$ 22.00 8.40

MILLWRIGHT.......................$ 24.00 8.40

CARP0028-004 06/01/2006

Rates Fringes

Diver Tender.....................$ 27.27 7.80

Diver............................$ 56.54 7.80

DEPTH PAY (Surface Diving)

050 to 100 feet $2.00 per foot

101 to 150 feet $3.00 per foot

151 to 220 feet $4.00 per foot

221 ft & deeper $5.00

* ELEC0044-001 09/01/2007

BEAVERHEAD, BIG HORN, BLAINE, BROADWATER, CARBON, CARTER,

CASCADE, CHOUTEAU, CUSTER, DANIELS, DAWSON, DEER LODGE, FALLON,

FERGUS, GALLATIN, GARFIELD, GLACIER, GOLDEN VALLEY, GRANITE,

HILL, JEFFERSON, JUDITH, BASIN, LEWIS AND CLARK, LIBERTY,

MADISON, MCCONE, MEAGHER, MINERAL, MISSOULA, MUSSELSHELL, PARK,

PETROLEUM, PHILLIPS, PONDERA, POWDER RIVER, POWELL, PRAIRIE,

RAVALLI, RICHLAND, ROOSEVELT, ROSEBUD, SHERIDAN, SILVER BOW,

STILWATER, SWEET GRASS, TETON, TOOLE, TREASURE, VALLEY,

WHEATLAND, WIBAUX, AND YELLOWSTONE COUNTIES

Rates Fringes

Line Construction

(1) Lineman.................$ 32.12 11.88

(2) Equipment Operator......$ 23.82 10.95

(3) Experienced Groundman...$ 19.36 10.33

ELEC0233-001 06/01/2007

Blaine, Broadwater, Cascade, Chouteau, Fergus, Glacier, Hill, Judith Basin, Lewis & Clark, Liberty, Meagher, Petroleum, Phillips, Pondera, Teton, Valley, and Wheatland Counties

Rates Fringes

ELECTRICIAN......................$ 26.06 4.25%+8.55

ELEC0233-002 08/01/2007

BEAVERHEAD, DEER LODGE,GRANITE, JEFFERSON, MADISON, POWELL, AND

SILVER BOW COUNTIES

Rates Fringes

ELECTRICIAN......................$ 25.50 4.25%+9.20

ELEC0532-001 06/01/2007

GALLATIN, PARK, AND SWEET GRASS COUNTIES

Rates Fringes

ELECTRICIAN......................$ 25.14 4.25%+8.40

ELEC0532-003 06/01/2007

BIG HORN, CARBON, CARTER, CUSTER, DANIELS, DAWSON, FALLON,

GARFIELD, GOLDEN VALLEY, McCONE, MUSSELSHELL, POWDER RIVER, PRAIRIE, RICHLAND, ROOSEVELT, ROSEBUD, SHERIDAN, STILLWATER, TREASURE, WIBAUX AND YELLOWSTONE COUNTIES

Rates Fringes

ELECTRICIAN......................$ 26.83 4.25%+9.14

ELEC0768-001 03/01/2007

FLATHEAD, LAKE, LINCOLN, MINERAL, MISSOULA, RAVALLI, AND

SANDERS COUNTIES

Rates Fringes

ELECTRICIAN......................$ 26.43 10.25

ELEC0768-003 12/01/2005

FLATHEAD, LAKE, AND LINCOLN COUNTIES

Rates Fringes

Line Construction

(1) Cable Splicer...........$ 32.32 11.48

(2) Lineman.................$ 29.75 11.27

(3) Groundman...............$ 18.18 10.36

(4) Line Equipment Operator.$ 22.55 10.75

(5) Pole Sprayer............$ 23.48 10.82

(6) Tree Trimmer............$ 24.37 10.91

(7) Utility Locator.........$ 16.03 4.50

ENGI0400-001 05/01/2007

Rates Fringes

Power Equipment Operator

(Zone 1)

Group 1.....................$ 21.52 8.55

Group 2.....................$ 21.99 8.55

Group 3.....................$ 22.39 8.55

Group 4.....................$ 23.05 8.55

Group 5.....................$ 23.55 8.55

Group 6.....................$ 24.65 8.55

Group 7.....................$ 25.15 8.55

ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:

The zone hourly rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the nearest County Court

House of the folowing listed towns to the center of the job:

BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL,

MISSOULA

Zone 1: 0 to 30 miles - Base Pay

Zone 2: 30 to 60 miles - Base Pay + $3.30

Zone 3: Over 60 miles - Base Pay + $5.30

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Air Compressor; Auto Fine Grader; Belt Finishing

Machine; Boring Machine, small; Cement Silo; Crane, A-Frame

Truck Crane; Crusher Conveyor; DW-10, 15, and 20 Tractor

Roller; Farm Tractor; Forklift; Form Grader; Front-end

Loader under 1 cu yd; Heavy Duty Drills; Herman Nelson

Heater; Mulching Machine; Oiler, all except Cranes. &

Shovels; Pumpman.

GROUP 2: Air Doctor; Backhoe/Excavator/Shovel to and including 3 cu yd; Bit Grinder; Bituminous Paving Travel

Plant; Boring Machine, large; Broom, self-propelled;

Concrete Travel Batcher; Concrete Float & Spreader;

Concrete Bucket Dispatcher; Concrete Finish Machine;

Concrete Conveyor; Distributor; Dozer, Rubber- Tired, Push

& Side Boom; Elevating Grader/Gradall; Field Equipment

Serviceman; Front-end Loader 1 cu yd to including 5 cu yd;

Grade Setter; Heavy Duty Drills, all types; Hoist/Tugger, all; Hydralift & similar; Industrial Locomotive; Motor

Patrol, except Finish; Mountain Skidder; Oiler - Cranes &

Shovels; Pavement Breaker, EMSCO; Power Saw, self-propelled; Pugmill; Pumpcrete/Grout Machine; Punch

Truck; Roller, other than Asphalt; Roller, Sheepsfoot, self- propelled; Roller, 25 tons and over; Ross Carrier;

Rotomill under 6 ft; Trenching Machine; Washing/Screening

Plant.

GROUP 3: Asphalt Paving Machine; Asphalt Screed;

Backhoe/Excavator/Shovel over 3 cu yd; Cableway Highline;

Concrete Batch Plant; Concrete Curing Machine; Concrete

Pump; Cranes, Creter; Cranes, Electric Overhead; Cranes, 24 tons and under; Curb Machine/Slip Form Paver; Finish Dozer;

Front-end Loader over 5 cu yd; Mechanic/Welder; Pioneer

Dozer; Roller, Asphalt (Breakdown & Finish); Rotomill, over

6 ft; Scraper, single, twin, or pulling Belly Dump; Yo-Yo

Cat.

GROUP 4: Asphalt/Hot Plant Operator; Cranes, 25 tons to 44 tons; Crusher Operator; Finish Motor Patrol; Finish Scraper.

GROUP 5: Cranes, 45 tons to including 74 tons; Crane, Tower, all.

GROUP 6: Cranes, 75 tons to including 149 tons; Crane, Whirley, all.

GROUP 7: Cranes, 150 tons to including 250 tons (add $1.00 for every 100 tons over 250 tons); Crane, Stiff-Leg or

Derrick; Helicopter Hoist.

IRON0014-002 07/01/2006

FLATHEAD, GLACIER, LAKE, LINCOLN, MINERAL, MISSOULA, AND

SANDERS COUNTIES

Rates Fringes

IRONWORKER.......................$ 23.17 14.70

IRON0841-002 07/01/2005

REMAINING COUNTIES

Rates Fringes

IRONWORKER.......................$ 20.45 12.76

LABO0098-001 05/01/2005

Rates Fringes

Laborers: (Zone 1)

Group 1.....................$ 15.17 5.90

Group 2.....................$ 17.99 5.90

Group 3.....................$ 18.13 5.90

Group 4.....................$ 18.85 5.90

LABORERS CLASSIFICATIONS

GROUP 1: Flagperson

GROUP 2: All General Labor work; Burning Bar; Bucket man;

Carpenter Tender; Caisson Worker; Cement Mason Tender;

Cement Handler (dry); Chuck Tender; Choker Setter; Concrete worker; Curb Machine-Lay Down; Crusher and Batch worker;

Fence Erector; Form Setter; Form Stripper; Heater Tender;

Landscaper; Pipe Wrapper; Pot Tender; Powderman Tender;

Rail and Truck Loaders and Unloaders; Riprapper; Sealants for concrete and other materials; Sign Erection, Guard Rail and Jersey Rail; Stake Jumper; Spike Driver; Signalman;

Tail Hoseman; Tool Checker and Houseman; Traffic Control worker.

GROUP 3: Concrete Vibrator; Dumpman (Grademan); Equipment

Handler; Geotextile and Liners; High-Pressure Nozzleman;

Jackhammer (Pavement Breaker); Laser Equipment; Non-Riding

Rollers; Pipelayer; Posthole Digger (Power); Power Driven

Wheelbarrow; Rigger; Sandblaster; Sod Cutter-Power;

Tampers; Creosote Handler

GROUP 4: Asphalt Raker; Asbestos Laborer; Cutting Torch;

Grade Setter; Hazmat Worker; High- Scaler; Power Saws

(Faller & Concrete); Powderman ($1.00 per hour above Group

4 rate); Rock & Core Drill; Tank/Vessel Cleaner; Track or

Truck mounted Wagon Drill; Welder including Air Arc

PAIN0260-001 07/01/2002

BLAINE, BROADWATER, CASCADE, CHOUTEAU, DANIELS, FERGUS,

GARFIELD, GLACIER, GRANITE (South of a line running East & West through the Southern city limits of Phillipsburg), HILL, JEFFERSON, JUDITH BASIN, LEWIS AND CLARK, LIBERTY, McCONE, MEAGHER, PETROLEUM, PHILLIPS, PONDERA, POWELL (South of a line running East & West through the Southern City limits of

Helmsville), RICHLAND, ROOSEVELT, SHERIDAN, TETON, TOOLE, VALLEY, AND WHEATLAND COUNTIES

Rates Fringes

PAINTER..........................$ 13.85 1%+3.45

PAIN0260-002 07/01/2002

FLATHEAD, GRANITE (North of a line running East & West through the Southern city limits of Phillipsburg), LAKE, LINCOLN, MINERAL, MISSOULA, POWELL (North of a line running East & West through the Southern city limits of Helmsville), RAVALLI, AND

SANDERS COUNTIES

Rates Fringes

PAINTER..........................$ 16.85 1%+3.45

PAIN1922-001 06/01/2001

BEAVERHEAD, BIG HORN, CARBON, CARTER, CUSTER, DAWSON, DEER

LODGE, FALLON, GALLATIN, GOLDEN VALLEY, JEFFERSON, MADISON,

MUSSELSHELL, PARK, POWDER RIVER, PRAIRIE, ROSEBUD, SILVER BOW,

STILLWATER, SWEET GRASS, TREASURE, WIBAUX, AND YELLOWSTONE

COUNTIES

Rates Fringes

PAINTER (Industrial, includes industrial plants, tanks, pipes, bridges)..................$ 17.80 7.63

PLAS0119-001 05/01/2005

STATEWIDE (except Deer Lodge, Jefferson, Powell, and Silver Bow

Counties)

Rates Fringes

Cement Masons: (Zone 1)

Area 1......................$ 17.71 6.20

Area 2......................$ 18.82 6.20

AREA 1: STATEWIDE (except Deer Lodge, Jefferson, Powell, and

Silver Bow Counties)

AREA 2: DEER LODGE, JEFFERSON, POWELL, AND SILVER BOW

COUNTIES

PLUM0030-003 09/01/2007

BIGHORN, BLAINE, CARBON, CARTER, CASCADE, CHOUTEAU, CUSTER,

DANIELS, DAWSON, FALLON, FERGUS, GARFIELD, GLACIER, GOLDEN

VALLEY, HILL, JUDITH BASIN, LIBERTY, McCONE, MEAGHER, MUSSELSHELL, PETROLEUM, PHILLIPS, PONDERA, POWDER RIVER, PRAIRIE. RICHLAND, ROOSEVELT, ROSEBUD, SHERIDAN, STILLWATER, TETON, TOOLE, TREASURE, VALLEY, WHEATLAND, WIBAUX AND

YELLOWSTONE COUNTIES

Rates Fringes

PLUMBER

Commercial..................$ 26.05 12.65

Industrial - Power

Generating Plants...........$ 28.40 12.65

PLUM0041-001 07/01/2007

BEAVERHEAD, BROADWATER, DEER LODGE, GALLATIN, GRANITE,

JEFFERSON, LEWIS AND CLARK, MADISON, PARK, POWELL, SILVER BOW,

AND SWEET GRASS COUNTIES

Rates Fringes

PLUMBER..........................$ 26.25 10.50

PLUM0459-001 05/01/2007

FLATHEAD, GLACIER, LAKE, LINCOLN, MINERAL, MISSOULA, RAVALLI,

AND SANDERS

Rates Fringes

PLUMBER..........................$ 25.21 10.80

TEAM0002-001 06/01/2004

Rates Fringes

Truck drivers: (Zone 1)

Group 1.....................$ 14.14 5.92

Group 2.....................$ 18.84 5.92

TRUCK DRIVERS CLASSIFICATIONS:

GROUP 1: Pilot Car

GROUP 2: All Combination Trucks and Concrete Mixers;

Distributor Driver; All Dry Batch Trucks; Dumpman, Gravel

Spreader Box Operator; All Dump Trucks and similar equipment including DW 20, DW 21, or Euclid Tractor;

Dumpsters; Flat Trucks; Servicemen; Lowboys, Four-Wheel

Trailers; Float Semi-Trailer; Lumber Carriers, Lift Trucks

& Fork Lifts; Pick-up Driver hauling material; Powder

Truck (Bulk Unloader type); Power Boom; Service Truck

Dirvers, Fuel Truck Drivers, Tiremen; All Water Tank

Drivers; Petroleum Products Drivers; Trucks with Power

Equipment such as Winch, A-Frame Truck, Crane, Hydralift, Gout-Crete Truck, and Combination Mulching, Seeding &

Fertilizing Truck; Truck Mechanic

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .