SubmittalScheduleR1_08-1021.xls
XLS spreadsheet 28 KB Posted
- Attached to
- Pavement Requirements Federal contract opportunity
- Solicitation number
- FA4626-08-R-0009
About this file
Attch 2 Material Submittal Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions.pdf | ||
| CoverPagesandTOC.doc | DOC document | |
| WageDetermination.doc | DOC document | |
| Solicitation.doc | DOC document | |
| Spec's.zip | ZIP file | |
| PastPerfQuestionaire_Atch4.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIALS SUBMITTALS | Project Number | Project Title: | Solicitation/Contract No. | ||||||||||||||||||
| NZAS 08-1021 | Pavements Requirements Contract | FA4626-08-R-0009 | |||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR | ||||||||||||||||||||
| D-Days;PSW-Prior to Start Work; PFI-Prior to Final Inspection; AFI-After Final Inspection;BBCW-Before Beginninng Concrete Work;PPC-Prior to Project Completion;ANP-After Notice to Proceed;BD-Before Delivery;PT-Prior to Testing;ATT-After Test is Taken;PBC-Prior To Beginning Construction;PI-Per Incident;PDO-Per Delivery Order. | |||||||||||||||||||||
| Number of Copies Required | |||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | TRAFFIC CONTROL | OTHER | REQUIRED SUBMISSION DATE (BY CONTRACTOR) | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DIS- APPROVED | ||||||||||||||||||||
| 1 | AS-BUILT FIELD DATA 01000-3.5.2, 3.5.6 | 3 D PFI | |||||||||||||||||||
| 2 | OPERATION AND MAINTENANCE MANUAL 01000-3.7 (N/A) | 3 D PWS | |||||||||||||||||||
| 3 | EQUIPMENT LIST 01000-3.8.1 (N/A) | 30 D AFI | |||||||||||||||||||
| 4 | GUARANTEES 01000-3.8.2 (N/A) | 5 D PPC | |||||||||||||||||||
| 5 | SHOP DRAWINGS 01000-3.10 (N/A) | 5 D PT | |||||||||||||||||||
| 6 | 1354 PROPERTY INVENTORY CHECKLIST 01000-3.19 | 10 D PPC | |||||||||||||||||||
| 7 | MPDES PERMIT 01360-4.30 | 10 D PFI | |||||||||||||||||||
| 8 | SOLID WASTE DISPOSAL RECORDS 01360-11.1 | 10 D PFI | |||||||||||||||||||
| 9 | QUALITY CONTROL REPORT 01000-Attachment 1 | 5 D PBC | |||||||||||||||||||
| 10 | RECYCLED MATERIAL USE REPORT 01360-12.0 | 5 D PBC | |||||||||||||||||||
| 12 | WASTE MANAGEMENT PLAN 01360-11.6 | 14 D PPC | |||||||||||||||||||
| 13 | 01000 - 3.13 Construction Near Utilities | 3 D PSW | |||||||||||||||||||
| 14 | 01000 - 3.13.1, Utility Outage Notice | 10 D PBC | |||||||||||||||||||
| 15 | 01000 - 3.18.2 Contractors Quality Control Plan | 15 D PBC | |||||||||||||||||||
| 16 | 01000 - 3.18.4 Contractors Quality Control Records | Daily | |||||||||||||||||||
| 17 | 01000 - 3.19, 1354 Checklist, Property Inventory Checklist | 10 D PFI | |||||||||||||||||||
| 18 | 02506 - 1.3.1 | 2 | 10D PSW | Geotextile | |||||||||||||||||
| 19 | 02507 - 1.3.1 | 2 | 10D PSW | Geotextile | |||||||||||||||||
| 20 | 02508 - 1.3.1 | 2 | 10D PSW | GeoGrid | |||||||||||||||||
| 21 | 02600 - 1.2 | 2 | 10D PSW | Graded Aggregate | |||||||||||||||||
| 22 | 02605 - 1.3.1 | 2 | 10D PSW | Treated Base Mix Design | |||||||||||||||||
| 23 | 02610 - 1.2 | 2 | 10D PSW | Borrow | |||||||||||||||||
| 24 | 02620 - 1.2 | 2 | 10D PSW | Catch Basins, Frames, Grates | |||||||||||||||||
| 25 | 02660 - 1.2 | 2 | 10D PSW | Topsoil | |||||||||||||||||
| 26 | 2680 - 1.2 | 2 | 10D PSW | Seed Materials | |||||||||||||||||
| 27 | 03000 - 1.1.1 | 2 | 10D PSW | Traffic Control Plan | |||||||||||||||||
| 28 | 03000 - 1.2, 1.10 | 2 | 10D PSW | Certifications, Test Results (Frequencies as specified), Mix Designs, Delivery Tickets | |||||||||||||||||
| 29 | 03000 - 1.2.2 | 2 | 10D PSW | Tack Coat | |||||||||||||||||
| 30 | 03000 - 1.2.4, 1.9.3, 1.9.4 | 2 | 10D PSW | Pavement Marking Materials | |||||||||||||||||
| D - Days | PSW - Prior to Stort Work | PFI - Prior to Final Inspection | |||||||||||||||||||
| AFI - After Final Inspection | BBCW - Before Beginning Concrete Work | PPC - Prior to Project Completion | |||||||||||||||||||
| ANP - After Notice to Proceed | BD - Before Delivery | PT - Prior to Testing | |||||||||||||||||||
| ATT - After Test is Taken | PBC - Prior to Beginning Conctruction | PI-Per Incident | |||||||||||||||||||
| PDO-Per Delivery Order |
&L&"Times New Roman,Bold"&12Attachment 2&R&"Times New Roman,Bold"&12FA4626-08-R-0009 &L&"Times New Roman,Regular"&12AF Form 66
02: 000510_AC01_00_90-
&F-&D&C&"Times New Roman,Regular"&12SS-&P of &N
File details come from the government source that posted it. Updated .