SubmittalScheduleR1_08-1021.xls

XLS spreadsheet 28 KB Posted

Attached to
Pavement Requirements Federal contract opportunity
Solicitation number
FA4626-08-R-0009
Issued by
Department of the Air Force Global Strike Command

About this file

Attch 2 Material Submittal Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Pavement Requirements, newest first.
File Type Posted
Questions.pdf PDF
CoverPagesandTOC.doc DOC document
WageDetermination.doc DOC document
Solicitation.doc DOC document
Spec's.zip ZIP file
PastPerfQuestionaire_Atch4.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIALS SUBMITTALSProject NumberProject Title:Solicitation/Contract No.
NZAS 08-1021Pavements Requirements ContractFA4626-08-R-0009
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTOR/ADMINISTRATOR
D-Days;PSW-Prior to Start Work; PFI-Prior to Final Inspection; AFI-After Final Inspection;BBCW-Before Beginninng Concrete Work;PPC-Prior to Project Completion;ANP-After Notice to Proceed;BD-Before Delivery;PT-Prior to Testing;ATT-After Test is Taken;PBC-Prior To Beginning Construction;PI-Per Incident;PDO-Per Delivery Order.
Number of Copies Required
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSTRAFFIC CONTROLOTHERREQUIRED SUBMISSION DATE (BY CONTRACTOR)DATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDIS- APPROVED
1AS-BUILT FIELD DATA 01000-3.5.2, 3.5.63 D PFI
2OPERATION AND MAINTENANCE MANUAL 01000-3.7 (N/A)3 D PWS
3EQUIPMENT LIST 01000-3.8.1 (N/A)30 D AFI
4GUARANTEES 01000-3.8.2 (N/A)5 D PPC
5SHOP DRAWINGS 01000-3.10 (N/A)5 D PT
61354 PROPERTY INVENTORY CHECKLIST 01000-3.1910 D PPC
7MPDES PERMIT 01360-4.3010 D PFI
8SOLID WASTE DISPOSAL RECORDS 01360-11.110 D PFI
9QUALITY CONTROL REPORT 01000-Attachment 15 D PBC
10RECYCLED MATERIAL USE REPORT 01360-12.05 D PBC
12WASTE MANAGEMENT PLAN 01360-11.614 D PPC
1301000 - 3.13 Construction Near Utilities3 D PSW
1401000 - 3.13.1, Utility Outage Notice10 D PBC
1501000 - 3.18.2 Contractors Quality Control Plan15 D PBC
1601000 - 3.18.4 Contractors Quality Control RecordsDaily
1701000 - 3.19, 1354 Checklist, Property Inventory Checklist10 D PFI
1802506 - 1.3.1210D PSWGeotextile
1902507 - 1.3.1210D PSWGeotextile
2002508 - 1.3.1210D PSWGeoGrid
2102600 - 1.2210D PSWGraded Aggregate
2202605 - 1.3.1210D PSWTreated Base Mix Design
2302610 - 1.2210D PSWBorrow
2402620 - 1.2210D PSWCatch Basins, Frames, Grates
2502660 - 1.2210D PSWTopsoil
262680 - 1.2210D PSWSeed Materials
2703000 - 1.1.1210D PSWTraffic Control Plan
2803000 - 1.2, 1.10210D PSWCertifications, Test Results (Frequencies as specified), Mix Designs, Delivery Tickets
2903000 - 1.2.2210D PSWTack Coat
3003000 - 1.2.4, 1.9.3, 1.9.4210D PSWPavement Marking Materials
D - DaysPSW - Prior to Stort WorkPFI - Prior to Final Inspection
AFI - After Final InspectionBBCW - Before Beginning Concrete WorkPPC - Prior to Project Completion
ANP - After Notice to ProceedBD - Before DeliveryPT - Prior to Testing
ATT - After Test is TakenPBC - Prior to Beginning ConctructionPI-Per Incident
PDO-Per Delivery Order

&L&"Times New Roman,Bold"&12Attachment 2&R&"Times New Roman,Bold"&12FA4626-08-R-0009 &L&"Times New Roman,Regular"&12AF Form 66

02: 000510_AC01_00_90-

&F-&D&C&"Times New Roman,Regular"&12SS-&P of &N

File details come from the government source that posted it. Updated .