PastPerfQuestionaire_Atch4.doc
DOC document 73 KB Posted
- Attached to
- Pavement Requirements Federal contract opportunity
- Solicitation number
- FA4626-08-R-0009
About this file
Attch 4 Past Performance Questionaire
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions.pdf | ||
| SubmittalScheduleR1_08-1021.xls | XLS spreadsheet | |
| Spec's.zip | ZIP file | |
| WageDetermination.doc | DOC document | |
| Solicitation.doc | DOC document | |
| CoverPagesandTOC.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4
FA4626-08-R-0009
FOR OFFICIAL USE ONLY
J-500 PRESENT/PAST PERFORMANCE EVALUATION CONTRACTOR PERFORMANCE QUESTIONNAIRE
SECTION 1: TO BE COMPLETED BY THE OFFEROR AND PROVIDED TO THE CUSTOMER REFERENCED Name of Firm being evaluated: ___________________________________ Project Title and Location: _______________________________________ Project Description: _____________________________________________ Project Dollar Value: ____________________________________________ Year Completed: _______________________________________________ Project Manager: _______________________________________________ SECTION 2: TO BE COMPLETED BY THE CUSTOMER REFERENCED AND MAILED, HAND-DELIVERED, EMAILED OR FAXED DIRECTLY TO:
341 CONS/LGCA
FAX: (406) 731-4005/3748
ATTN: Mark Jefferson EMAIL: mark.jefferson@malmstrom.af.mil 7015 Goddard Drive, Bldg 145 DUTY PHONE 406-731-4111 Malmstrom AFB, MT 59402-6863 OVERVIEW: The firm shown above is submitting a proposal on a Malmstrom AFB construction/service project and provided your name as a customer reference. Part of our evaluation process requires information on the firm’s past performance. Your participation is important to us and responses are required by 28 March 2008 but no later than the proposal closing date of 4 April 2008, 2:00PM mountain time. Your assistance is greatly appreciated.
SECTION 3: EVALUATION
Please indicate your satisfaction with the contractor’s performance by placing an “X” in the appropriate block using the scale provided to the right of each question. This scale is defined as follows:
CODE
PERFORMANCE LEVEL
E EXCEPTIONAL - The contractor’s performance meets contractual requirements and exceeds many (requirements) to the Government’s or customer’s benefit. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
VG
VERY GOOD- The contractor’s performance meets contractual requirements and exceeds some (requirements) to the Government’s or customer’s benefit. The contractual performance was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
S SATISFACTORY – The contractor’s performance meets contractual requirements. The contractual performance contained some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
M MARGINAL – Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions or the contractor’s proposed actions appear only marginally effective or were not fully implemented.
U UNSATISFACTORY – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
N NOT APPLICABLE - Unable to provide a score.
| E |
| VG |
| S |
| M |
| U |
| N |
Quality Control Quality of workmanship
Adequacy, implementation and documentation of Quality Control Plan
Storage and Adequacy of Materials – kept secure, neat and orderly, protected from the elements
Adequacy of Submittals – re-submittals not excessive, submittal data is clear, concise and thorough
Adequacy of QC Testing – provides all tests as required
Adequacy of As-Builts- contractor maintains accurate up-to-date red line drawings on site per specifications
Use of Specified Materials – contractor used specified or equal material or products
Identification/correction of deficient work in a timely manner
Effective Management Cooperation and Responsiveness – responds to all communications in timely manner, solicits feedback and suggests superior alternatives.
Management of Resources/Personnel – maintains good construction pace and work environment
Coordination and control of subcontractors – insures adherence to work schedule, Adequacy of site clean up- all work and storage areas are cleaned and secured at end of each day
Effectiveness of jobsite supervision – site is safe and secure, clear line of supervision.
Compliance with laws and regulations
Professional conduct
Review/resolution of subcontractors issues
Implementation of Subcontracting Plan (applicable to large businesses)
Timely Performance Adequacy of initial progress schedule and adherence to approved schedule. Submission of revised schedules if needed
Resolution of Delays
Submission of required documentation
Completion of punch-list items
Warranty response
Compliance with Labor Standards Payrolls properly completed and submitted
Compliance with Davis-Bacon Act and EEO requirements
Compliance with Safety Standards Adequacy and Implementation of Safety Plan
Correction of noted deficiencies
BASED UPON OVERALL PERFORMANCE PLEASE PROVIDE OVERALL RATING OF CONTRACTOR BASED UPON RATINGS DEFINED ABOVE
PRINTED NAME OF EVALUATOR: _____________________________
SIGNATURE:
DATE:
COMPANY NAME: ____________________________
PHONE NUMBER: ____________________________
EMAIL ADDRESS: ____________________________
File details come from the government source that posted it. Updated .