Atch_2_-_PRQE_10-0175_33_70_02.00_10.pdf
PDF 653 KB Posted
- Solicitation number
- FA4621-14-R-0008
About this file
Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PRQE_10-0175_SOW_(Revised)_8_Aug_2014.pdf | ||
| PRQE_10-0175_Revised_Drawings.pdf | ||
| PRQE_10-0175_Questions_and_Answers.pdf | ||
| FA4621-14-R-0008_0001_Amendment__1.pdf | ||
| Pre-proposal_Site_Visit_slides.pdf | ||
| EMF-100.pdf | ||
| EMF-110.pdf | ||
| TF-850.pdf | ||
| TF-1171.pdf | ||
| EMF-030.pdf | ||
| TF-840.pdf | ||
| TF-1107.pdf | ||
| TF-1170.pdf | ||
| TF-1186.pdf | ||
| TF-1091.pdf | ||
| TF-1169.pdf | ||
| TF-1166.pdf | ||
| EMF-050.pdf | ||
| TF-1104.pdf | ||
| TF-852.pdf | ||
| TF-1185.pdf | ||
| TF-1183.pdf | ||
| EMF-020.pdf | ||
| EMF-090.pdf | ||
| EMF-010.pdf | ||
| EMF-040.pdf | ||
| EMF-070.pdf | ||
| EMF-080.pdf | ||
| EMF-060.pdf | ||
| Atch_1_-_PRQE_10-0175_SOW.pdf | ||
| Atch_5_-_Wage_Determination.pdf | ||
| Atch_6_-_PAST_AND_PRESENT_PERFORMANCE_SURVEY.pdf | ||
| Atch_3_-_General_Requirements.pdf | ||
| FA4621-14-R-0008.pdf | ||
| Atch_4_-_PRQE_10-0175_Drawings.pdf |
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRQE 10-0175
REPAIR UNDERGROUND ELECTRICAL FEEDERS “F” BRANCHES
SECTION 33 70 02.00 10
ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
10/07
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ALLIANCE FOR TELECOMMUNICATIONS INDUSTRY SOLUTIONS (ATIS)
ATIS O5.1 (2002; Supple A 2003; Supple B 2003; Supple C
2004) Specifications and Dimensions (for Wood Poles)
ASSOCIATION OF EDISON ILLUMINATING COMPANIES (AEIC)
AEIC C8 (2000) Extruded Dielectric Shielded Power
Cables Rated 5 Through 46 kV
AEIC CS8 (2000) Extruded Dielectric Shielded Power
Cables Rated 5 Through 46 kV
ASTM INTERNATIONAL (ASTM)
ASTM A 123/A 123M (2002) Standard Specification for Zinc (Hot-
Dip Galvanized) Coatings on Iron and Steel Products
ASTM A 153/A 153M (2005) Standard Specification for Zinc
Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A 48/A 48M (2003) Standard Specification for Gray Iron
Castings
ASTM B 117 (2007a) Standing Practice for Operating Salt
Spray (Fog) Apparatus
ASTM B 231/B 231M (2004) Standard Specification for Concentric-
Lay-Stranded Aluminum 1350 Conductors
ASTM B 3 (2001; R 2007) Standard Specification for
Soft or Annealed Copper Wire
ASTM B 400 (2004) Standard Specification for Compact
Round Concentric-Lay-Stranded Aluminum 1350 Conductor
ASTM B 496 (2004) Standard Specification for Compact
Round Concentric-Lay-Stranded Copper Conductors
Section 33 70 02.00 10 Page 1
Attachment 2
ASTM B 609/B 609M (1999; R 2004) Standard Specification for
Aluminum 1350 Round Wire, Annealed and Intermediate Tempers, for Electrical purposes
ASTM B 8 (2004) Standard Specification for Concentric-
Lay-Stranded Copper Conductors, Hard, Medium- Hard, or Soft
ASTM B 800 (2005) Standard Specification for 8000 Series
Aluminum Alloy Wire for Electrical Purposes- Annealed and Intermediate Tempers
ASTM B 801 (2007) Standard Specification for Concentric-
Lay-Stranded Conductors of 8000 Series Aluminum Alloy for Subsequent Covering or Insulation
ASTM C 478 (2008) Standard Specification for Precast
Reinforced Concrete Manhole Sections
ASTM C 478M (2008) Standard Specification for Precast
Reinforced Concrete Manhole Sections (Metric)
ASTM D 1654 (2005) Evaluation of Painted or Coated
Specimens Subjected to Corrosive Environments
ASTM D 2472 (2000; R 2006) Standard Specification for
Sulphur Hexafluoride
ASTM D 4059 (2000; R 2005e1) Analysis of Polychlorinated
Biphenyls in Insulating Liquids by Gas Chromatography
ASTM D 923 (2007) Standard Practice for Sampling
Electrical Insulating Liquids
FM GLOBAL (FM)
FM P7825a (2005) Approval Guide Fire Protection
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE C135.30 (1988) Zinc-Coated Ferrous Ground Rods for
Overhead or Underground Line Construction
IEEE C2 (2007; Errata 2007) National Electrical
Safety Code
IEEE C37.1 (1994) Definition, Specification, and
Analysis of Systems Used for Supervisory Control, Data Acquisition, and Automatic Control
IEEE C37.121 (1989; R 2006) American National Standard for
Switchgear Unit Substations Requirements
Section 33 70 02.00 10 Page 2
IEEE C37.13 (1990; R 1995) Standard for Low-Voltage AC Power Circuit Breakers Used in Enclosures
IEEE C37.16 (2000) Recommendations for Low-Voltage Power
Circuit Breakers and AC Power Circuit Protectors, - Preferred Ratings, Related Requirements, and Application
IEEE C37.2 (1996; R 2001) Electrical Power System Device
Function Numbers and Contact Designations
IEEE C37.20.1 (2002; R 2007) Standard for Metal-Enclosed
Low-Voltage Power Circuit-Breaker Switchgear
IEEE C37.20.2 (1999) Metal-Clad Switchgear
IEEE C37.20.3 (2001) Metal-Enclosed Interrupter Switchgear
IEEE C37.23 (2003) Guide for Metal-Enclosed Bus and
Calculating Losses in Isolated-Phase Bus
IEEE C37.30 (1997) Requirements for High-Voltage Switches
IEEE C37.34 (1994) Test Code for High-Voltage Air
Switches
IEEE C37.41 (2000) Design Tests for High-Voltage Fuses, Distribution Enclosed Single-Pole Air Switches, Fuse Disconnecting Switches, and Accessories
IEEE C37.46 (2000) For High Voltage Expulsion and
Current-Limiting Type Power Class Fuses and Fuse Disconnecting Switches
IEEE C37.63 (2005) Requirements for Overhead, Pad-
Mounted, Dry-Vault, and Submersible Automatic Line Sectionalizers for AC Systems
IEEE C37.90 (2005) Standard for Relays and Relay Systems
Associated With Electric Power Apparatus
IEEE C37.90.1 (2002; Errata 2003) Surge Withstand
Capability (SWC) Tests for Relays and Relay Systems Associated with Electric Power Apparatus
IEEE C57.12.00 (2006) Standard General Requirements for
Liquid-Immersed Distribution, Power, and Regulating Transformers
IEEE C57.12.21 (1992) Requirements for Pad-Mounted, Compartmental-Type, Self-Cooled, Single-Phase Distribution Transformers with High-Voltage Bushings; High Voltage, 34 500 Grd Y/199200 Volts and Below; Low Voltage, 2400/120 Volts;
167 kVAand Smaller
Section 33 70 02.00 10 Page 3
IEEE C57.12.26 (1992; Addenda 1993) Transformers - Pad-
Mounted Compartmental-Type, Self-Cooled, Three-Phase Distribution Transformers for Use with Separable Insulated High-Voltage Connectors, High Voltage, (34 500 Grd Y/19 920 and Below; 2500 kVA and Smaller)
IEEE C57.12.28 (2005) Standard for Pad-Mounted Equipment -
Enclosure Integrity
IEEE C57.13 (1993; R 2003) Standard Requirements for
Instrument Transformers
IEEE C57.98 (1993; R 1999) Guide for Transformer Impulse
Tests
IEEE C62.11 (2005) Standard for Metal-Oxide Surge
Arresters for Alternating Current Power Circuits (>1kV)
IEEE Std 242 (2001; Errata 2003) Recommended Practice for
Protection and Coordination of Industrial and Commercial Power Systems - Buff Book
IEEE Std 386 (2006) Standard for Separable Insulated
Connector Systems for Power Distribution Systems Above 600V
IEEE Std 399 (1997) Recommended Practice for Power Systems
Analysis - Brown Book
IEEE Std 404 (2006) Extruded and Laminated Dielectric
Shielded Cable Joints Rated 2500 V Through 500 000 V
IEEE Std 48 (1996; R 2003) Test Procedures and
Requirements for Alternating-Current Cable Terminations 2.5 kV through 765 kV
IEEE Std 81 (1983) Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System (Part 1)Normal Measurements
INTERNATIONAL ELECTROTECHNICAL COMMISSION (IEC)
IEC 60255-21-3 (1993) Electrical Relays - Part 21:
Vibration, Shock, Bump And Seismic Tests On Measuring Relays And Protection Equipment - Section 3: Seismic Tests
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA AB 1 (2002) Molded-Case Circuit Breakers, Molded
Case Switches, and Circuit-Breaker Enclosures
Section 33 70 02.00 10 Page 4
NEMA BU 1.1 (2005) General Instructions for Proper Handling, Installation, Operation, and Maintenance of Busway Rated 600 Volts or Less
NEMA C119.1 (2006) Sealed Insulated Underground Connector
Systems Rated 600 Volts
NEMA C12.10 (2004) Physical Aspects of Watthour Meters
NEMA C12.11 (2007) Instrument Transformers for Revenue
Metering, 10 kV BIL through 350 kV BIL (0.6 kV NSV through 69 kV NSV)
NEMA C12.4 (1984; R 2002) Mechanical Demand Registers
NEMA C29.1 (1988; R 2002) Test Methods for Electrical
Power Insulators
NEMA C37.50 (1989; R 2000) Low-Voltage AC Power Circuit
Breakers Used in Enclosures - Test Procedures
NEMA C80.1 (2005) Standard for Electrical Rigid Steel
Conduit (ERSC)
NEMA FB 1 (2007) Standard for Fittings, Cast Metal
Boxes, and Conduit Bodies for Conduit, Electrical Metallic Tubing, and Cable
NEMA FU 1 (2002; R 2007) Low Voltage Cartridge Fuses
NEMA LA 1 (1992; R 1999) Standard for Surge Arresters
NEMA PB 1 (2006; Errata 2008) Standard for Panelboards
NEMA PB 2 (2006) Deadfront Distribution Switchboards
NEMA SG 2 (1993) Standard for High-Voltage Fuses
NEMA TC 6 & 8 (2003) Standard for Polyvinyl Chloride PVC
Plastic Utilities Duct for Underground Installations
NEMA TC 7 (2005) Standard for Smooth-Wall Coilable
Polyethylene Electrical Plastic Duct
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2007) National Electrical Code - 2008
Edition
UNDERWRITERS LABORATORIES (UL)
UL 1072 (2006; Rev thru Sep 2007) Medium-Voltage
Power Cables
Section 33 70 02.00 10 Page 5
UL 1242 (2006; Rev thru Jul 2007) Standard for Electrical Intermediate Metal Conduit -- Steel
UL 1684 (2000; Rev thru Aug 2004) Reinforced
Thermosetting Resin Conduit (RTRC) and Fittings
UL 198M (2003; Rev thru Oct 2007) Mine-Duty Fuses
UL 467 (2007) Standard for Grounding and Bonding
Equipment
UL 486A-486B (2003; Rev thru Aug 2006) Standard for Wire
Connectors
UL 489 (2002; Rev thru Jun 2006) Standard for
Molded-Case Circuit Breakers, Molded-Case Switches and Circuit-Breaker Enclosures
UL 510 (2005; Rev thru Aug 2005) Polyvinyl Chloride, Polyethylene, and Rubber Insulating Tape
UL 514A (2004; Rev thru Aug 2007) Standard for
Metallic Outlet Boxes
UL 6 (2007) Standard for Electrical Rigid Metal
Conduit-Steel
UL 651 (2005; Rev thru May 2007) Standard for
Schedule 40 and 80 Rigid PVC Conduit and Fittings
UL 854 (2004; Rev thru Oct 2007) Service-Entrance
Cables
UL 857 (2001; Rev thru Nov 2002) Busways
1.2 SYSTEM DESCRIPTION
Items provided under this section shall be specifically suitable for the following service conditions.
a . Frequency 60 Hz
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Detail Drawings As-Built Drawings
Section 33 70 02.00 10 Page 6
Drawings, as specified.
SD-03 Product Data
Nameplates; G
Catalog cuts, brochures, circulars, specifications, product data, and printed information in sufficient detail and scope to verify compliance with the requirements of the contract documents.
Mimic Board; G
Board type and graphics along with pouch as well as proposed mounting techniques shall be submitted for approval.
Cable Markers; G
Submit sample of cable markers (utility) per specifications and drawings.
Material and Equipment; G
A complete itemized listing of equipment and materials proposed for incorporation into the work. Each entry shall include an item number, the quantity of items proposed, and the name of the manufacturer of each such item.
Installation Requirements; G
As a minimum, installation procedures for transformers, substations, switchgear, and splices. Procedures shall include cable pulling plans, diagrams, instructions, and precautions required to install, adjust, calibrate, and test the devices and equipment.
SD-06 Test Reports
Factory Tests
Certified factory test reports shall be submitted when the manufacturer performs routine factory tests, including tests required by standards listed in paragraph REFERENCES. Results of factory tests performed shall be certified by the manufacturer, or an approved testing laboratory, and submitted within 7 days following successful completion of the tests. The manufacturer's pass-fail criteria for tests specified in paragraph FIELD TESTING shall be included.
Field Testing
A proposed field test plan, 30 days prior to testing the installed system. No field test shall be performed until the test plan is approved. The test plan shall consist of complete field test procedures including tests to be performed, test equipment required, and tolerance limits.
Section 33 70 02.00 10 Page 7
Operating Tests
Six copies of the tests report in 8-1/2 by 11 inch binders having a minimum of three rings, including a separate section for each test. Sections shall be separated by heavy plastic dividers with tabs.
Cable Installation
Six copies of the information described below in 8-1/2 by 11 inch binders having a minimum of three rings from which material may readily be removed and replaced, including a separate section for each cable pull. Sections shall be separated by heavy plastic dividers with tabs, with all data sheets signed and dated by the person supervising the pull.
a. Site layout drawing with cable pulls numerically identified.
b. A list of equipment used, with calibration certifications.
The manufacturer and quantity of lubricant used on pull.
c. The cable manufacturer and type of cable.
d. The dates of cable pulls, time of day, and ambient temperature.
e. The length of cable pull and calculated cable pulling tensions.
f. The actual cable pulling tensions encountered during pull.
SD-07 Certificates
Material and Equipment
Where materials or equipment are specified to conform to the standards of the Underwriters Laboratories (UL) or to be constructed or tested, or both, in accordance with the standards of the American National Standards Institute (ANSI), the Institute of Electrical and Electronics Engineers (IEEE), or the National Electrical Manufacturers Association (NEMA), submit proof that the items provided conform to such requirements. The label of, or listing by, UL will be acceptable as evidence that the items conform. Either a certification or a published catalog specification data statement, to the effect that the item is in accordance with the referenced ANSI or IEEE standard, will be acceptable as evidence that the item conforms. A similar certification or published catalog specification data statement to the effect that the item is in accordance with the referenced NEMA standard, by a company listed as a member company of NEMA, will be acceptable as evidence that the item conforms. In lieu of such certification or published data, the Contractor may submit a certificate from a recognized testing agency equipped and competent to perform such services, stating that the items have been tested and that they conform to the requirements listed, including methods of testing of the specified agencies. Compliance with above-named
Section 33 70 02.00 10 Page 8 requirements does not relieve the Contractor from compliance with any other requirements of the specifications.
Cable Joints
A certification that contains the names and the qualifications of people recommended to perform the splicing and termination of medium-voltage cables approved for installation under this contract. The certification shall indicate that any person recommended to perform actual splicing and terminations has been adequately trained in the proper techniques and have had at least three recent years of experience in splicing and terminating the same or similar types of cables approved for installation. In addition, any person recommended by the Contractor may be required to perform a practice splice and termination, in the presence of the Contracting Officer, before being approved as a qualified installer of medium-voltage cables. If that additional requirement is imposed, provide short sections of the approved types of cables along with the approved type of splice and termination kits, and detailed manufacturer's instruction for the proper splicing and termination of the approved cable types.
Installation Engineer
Provide at least one onsite person in a supervisory position with a documentable level of competency and experience to supervise all cable pulling operations. A resume shall be provided showing the cable installers' experience in the last three years, including a list of references complete with points of contact, addresses and telephone numbers.
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals
Six copies of operation and maintenance manuals, within 7 calendar days following the completion of tests and including assembly, installation, operation and maintenance instructions, spare parts data which provides supplier name, current cost, catalog order number, and a recommended list of spare parts to be stocked. Manuals shall also include data outlining detailed procedures for system startup and operation, and a troubleshooting guide which lists possible operational problems and corrective action to be taken. A brief description of all equipment, basic operating features, and routine maintenance requirements shall also be included. Documents shall be bound in a binder marked or identified on the spine and front cover. A table of contents page shall be included and marked with pertinent contract information and contents of the manual. Tabs shall be provided to separate different types of documents, such as catalog ordering information, drawings, instructions, and spare parts data. Index sheets shall be provided for each section of the manual when warranted by the quantity of documents included under separate tabs or dividers.
Three additional copies of the instructions manual shall be provided within 30 calendar days following the manuals.
Section 33 70 02.00 10 Page 9
1.4 QUALITY ASSURANCE
1.4.1 Detail Drawings
Submit detail drawings consisting of equipment drawings, illustrations, schedules, instructions, diagrams manufacturers standard installation drawings and other information necessary to define the installation and enable the Government to check conformity with the requirements of the contract drawings.
a. If departures from the contract drawings are deemed necessary by the Contractor, complete details of such departures shall be included with the detail drawings. Approved departures shall be made at no additional cost to the Government.
b. Detail drawings shall show how components are assembled, function together and how they will be installed on the project. Data and drawings for component parts of an item or system shall be coordinated and submitted as a unit. Data and drawings shall be coordinated and included in a single submission. Multiple submissions for the same equipment or system are not acceptable except where prior approval has been obtained from the Contracting Officer. In such cases, a list of data to be submitted later shall be included with the first submission.
Detail drawings shall consist of the following:
1). Detail drawings showing physical arrangement, construction details, connections, finishes, materials used in fabrication, provisions for conduit or busway entrance, access requirements for installation and maintenance, physical size, electrical characteristics, foundation and support details, and equipment weight. Drawings shall be drawn to scale and/or dimensioned. All optional items shall be clearly identified as included or excluded.
2). Internal wiring diagrams of equipment showing wiring as actually provided for this project. External wiring connections shall be clearly identified.
3). Detail drawings shall as a minimum depict the installation of the following items:
(a). Medium-voltage cables and accessories including cable installation plan.
(b). Transformers.
( c ). Switchgear.
( d ). Pad-mounted loadbreak switches.
( e ). Surge arresters.
1.4.2 As-Built Drawings
The as-built drawings shall be a record of the construction as installed.
The drawings shall include the information shown on the contract drawings as well as deviations, modifications, and changes from the contract drawings, however minor. The as-built drawings shall be a full sized set of prints
Section 33 70 02.00 10 Page 10 marked to reflect deviations, modifications, and changes. The as-built drawings shall be complete and show the location, size, dimensions, part identification, and other information. Additional sheets may be added. The as-built drawings shall be jointly inspected for accuracy and completeness by the Contractor's quality control representative and by the Contracting Officer prior to the submission of each monthly pay estimate. Upon completion of the work, provide three full sized sets of the marked prints to the Contracting Officer for approval. If upon review, the as-built drawings are found to contain errors and/or omissions, they will be returned to the Contractor for correction. Correct and return the as-built drawings to the Contracting Officer for approval within 10 calendar days from the time the drawings are returned to the Contractor.
1.5 DELIVERY, STORAGE, AND HANDLING
Visually inspect devices and equipment when received and prior to acceptance from conveyance. Protect stored items from the environment in accordance with the manufacturer's published instructions. Damaged items shall be replaced. Store oil filled transformers and switches in accordance with the manufacturer's requirements. Wood poles held in storage for more than 2 weeks shall be stored in accordance with ATIS O5.1. Handle wood poles in accordance with ATIS O5.1, except that pointed tools capable of producing indentations more than 1 inch in depth shall not be used. Metal poles shall be handled and stored in accordance with the manufacturer's instructions.
1.6 EXTRA MATERIALS
One additional spare fuse or fuse element for each furnished fuse or fuse element shall be delivered to the contracting officer when the electrical system is accepted. Two complete sets of all special tools required for maintenance shall be provided, complete with a suitable tool box. Special tools are those that only the manufacturer provides, for special purposes (to access compartments, or operate, adjust, or maintain special parts).
PART 2 PRODUCTS
2.1 STANDARD PRODUCT
Provide material and equipment which are the standard product of a manufacturer regularly engaged in the manufacture of the product and that essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening. Items of the same classification shall be identical including equipment, assemblies, parts, and components.
2.2 NAMEPLATES
2.2.1 Mimic Board
Each sectionalizing pedestal and pad switch shall be provided with clear plastic pouch securely mounted (no adhesive or glues) to inside of equipment. Each pouch shall contain a small board containing outline of distribution system. Symbols shall be similar to a one-line diagram with "You are Here" gear enlarged. Submit board type and graphics to Owner and/or Engineer for approval prior to ordering.
Section 33 70 02.00 10 Page 11
2.3 CORROSION PROTECTION
2.3.1 Aluminum Materials
Aluminum shall not be used in contact with earth or concrete.
2.3.2 Ferrous Metal Materials
2.3.2.1 Hardware
Ferrous metal hardware shall be hot-dip galvanized in accordance with ASTM A 153/A 153M and ASTM A 123/A 123M.
2.4 CABLES
Cables shall be single conductor type unless otherwise indicated.
2.4.1 Medium-Voltage Cables
2.4.1.1 General
Cable construction shall be Type MV105, concentric neutral underground distribution cable conforming to AEIC C8. Cables shall be manufactured for use in duct applications.
2.4.1.2 Ratings
Cables shall be rated for a circuit voltage of 15 kV.
2.4.1.3 Conductor Material
Underground cables shall be soft drawn copper complying with ASTM B 3 and ASTM B 8 for regular concentric and compressed stranding or ASTM B 496 for compact stranding.
2.4.1.4 Insulation
Cable insulation shall be ethylene-propylene-rubber (EPR) insulation conforming to the requirements of AEIC CS8. A 133 percent insulation level shall be used on 15 kV rated cables.
2.4.1.5 Shielding
Cables rated for 2 kV and above shall have a semiconducting conductor shield, a semiconducting insulation shield, and an overall copper wire shield for each phase.
2.4.1.6 Neutrals
Concentric neutrals conductors shall be tinned copper, having a combined ampacity 1/3 of the phase conductor ampacity rating.
2.4.1.7 Jackets
Cables shall be provided with a PVC jacket.
Section 33 70 02.00 10 Page 12
2.4.2 Low-Voltage Cables
Cables shall be rated 600 volts and shall conform to the requirements of NFPA 70, and must be UL listed for the application or meet the applicable section of either ICEA or NEMA standards.
2.4.2.1 Conductor Material
Underground cables shall be annealed copper complying with ASTM B 3 and ASTM B 8. Intermixing of copper and aluminum conductors is not permitted.
2.4.2.2 Insulation
Insulation must be in accordance with NFPA 70, and must be UL listed for the application or meet the applicable sections of either ICEA, or NEMA standards.
2.4.2.3 Jackets
Multiconductor cables shall have an overall PVC outer jacket.
2.4.2.4 In Duct
Cables shall be single-conductor cable, in accordance with NFPA 70.
2.5 CABLE JOINTS, TERMINATIONS, AND CONNECTORS
2.5.1 Medium-Voltage Cable Joints
Medium-voltage cable joints shall comply with IEEE Std 404. Medium-voltage cable terminations shall comply with IEEE Std 48. Joints shall be the standard products of a manufacturer and shall be either of the factory preformed type or of the kit type containing tapes and other required parts.
Joints shall have ratings not less than the ratings of the cables on which they are installed. Splice kits may be of the heat-shrinkable type for voltages up to 15 kV, of the premolded splice and connector type, the conventional taped type, or the resin pressure-filled overcast taped type for voltages up to 35 kV . Joints used in manholes, handholes, vaults and pull boxes shall be certified by the manufacturer for waterproof, submersible applications.
2.5.2 Medium-Voltage Separable Insulated Connectors
Separable insulated connectors shall comply with IEEE Std 386 and shall be of suitable construction or standard splice kits shall be used. Separable insulated connectors are acceptable for voltages up to 35 kV. Connectors shall be of the loadbreak type as indicated, of suitable construction for the application and the type of cable connected, and shall include cable shield adaptors. Separable insulated connectors shall not be used as substitutes for conventional permanent splices. External clamping points and test points shall be provided. Cable fault indicators shall be provided at each connector and an external indicating light provided to indicate which phase is faulted.
2.5.3 Low-Voltage Cable Splices
Section 33 70 02.00 10 Page 13
Low-voltage cable splices and terminations shall be rated at not less than 600 Volts. Splices in conductors No. 10 AWG and smaller shall be made with an insulated, solderless, pressure type connector, conforming to the applicable requirements of UL 486A-486B. Splices in conductors No. 8 AWG and larger shall be made with noninsulated, solderless, pressure type connector, conforming to the applicable requirements of UL 486A-486B.
Splices shall then be covered with an insulation and jacket material equivalent to the conductor insulation and jacket. Splices below grade or in wet locations shall be sealed type conforming to NEMA C119.1 or shall be waterproofed by a sealant-filled, thick wall, heat shrinkable, thermosetting tubing or by pouring a thermosetting resin into a mold that surrounds the joined conductors.
2.5.4 Terminations
Terminations shall be in accordance with IEEE Std 48, Class 1 or Class 2; of the molded elastomer, wet-process porcelain, prestretched elastomer, heat-shrinkable elastomer, or taped type. Acceptable elastomers are track-resistant silicone rubber or track-resistant ethylene propylene compounds, such as ethylene propylene rubber or ethylene propylene diene monomer.
Separable insulated connectors may be used for apparatus terminations, when such apparatus is provided with suitable bushings. Terminations shall be of the outdoor type, except that where installed inside outdoor equipment housings which are sealed against normal infiltration of moisture and outside air, indoor, Class 2 terminations are acceptable. Class 3 terminations are not acceptable. Terminations, where required, shall be provided with mounting brackets suitable for the intended installation and with grounding provisions for the cable shielding, metallic sheath, and armor.
2.5.4.1 Factory Preformed Type
Molded elastomer, wet-process porcelain, prestretched, and heat-shrinkable terminations shall utilize factory preformed components to the maximum extent practicable rather than tape build-up. Terminations shall have basic impulse levels as required for the system voltage level. Anti-tracking tape shall be applied over exposed insulation of preformed molded elastomer terminations.
2.5.4.2 Taped Terminations
Taped terminations shall use standard termination kits providing terminal connectors, field-fabricated stress cones, and rain hoods. Terminations shall be at least 20 inches long from the end of the tapered cable jacket to the start of the terminal connector, or not less than the kit manufacturer's recommendations, whichever is greater.
2.6 CONDUIT AND DUCTS
Duct lines shall be concrete-encased, thin-wall type for duct lines between manholes and for other medium-voltage lines. Low-voltage lines run elsewhere may be direct-burial, thick-wall type.
2.6.1 Metallic Conduit
Section 33 70 02.00 10 Page 14
Intermediate metal conduit shall comply with UL 1242. Rigid galvanized steel conduit shall comply with UL 6 and NEMA C80.1. Metallic conduit fittings and outlets shall comply with UL 514A and NEMA FB 1.
2.6.2 Nonmetallic Ducts
2.6.2.1 Concrete Encased Ducts
UL 651 Schedule 40.
2.6.2.2 Direct Burial
UL 651 Schedule 80. All Medium Voltage cable conduits must be concrete encased in 3000 PSI concrete.
2.6.3 Conduit Sealing Compound
Compounds for sealing ducts and conduit shall have a putty-like consistency workable with the hands at temperatures as low as 35 degrees F, shall neither slump at a temperature of 300 degrees F, nor harden materially when exposed to the air. Compounds shall adhere to clean surfaces of fiber or plastic ducts; metallic conduits or conduit coatings; concrete, masonry, or lead; any cable sheaths, jackets, covers, or insulation materials; and the common metals. Compounds shall form a seal without dissolving, noticeably changing characteristics, or removing any of the ingredients. Compounds shall have no injurious effect upon the hands of workmen or upon materials.
2.8 TRANSFORMERS, SUBSTATIONS, AND SWITCHGEAR
N/A
2.9 METERING AND PROTECTIVE DEVICES
2.9.1 Circuit Breakers, Low-Voltage
2.9.1.1 Molded-Case Circuit Breakers
NEMA AB 1 and UL 489.
2.9.2 Fuses, Medium-Voltage, Including Current-Limiting
2.9.2.1 Construction
Units shall be suitable for outdoor use. Fuses shall have integral blown-fuse indicators. All ratings shall be clearly visible.
2.9.2.2 Ratings
Current-limiting power fuses shall have ratings in accordance with IEEE C37.46 and as follows:
a. Nominal voltage (kV) 12.47
Section 33 70 02.00 10 Page 15
b. Rated maximum voltage (kV) 15.
c. Maximum symmetrical interrupting capacity (k A ) 14.
d. Rated continuous current (A) See the Drawings.
e. BIL (kV) 95.
2.9.2.3 E-Rated, Current-Limiting Power Fuses
E-rated, current-limiting, power fuses shall conform to IEEE C37.46.
2.9.2.4 C-Rated, Current-Limiting Power Fuses
C-rated, current-limiting power fuses shall open in 1000 seconds at currents between 170 and 240 percent of the C rating.
2.9.3 Fuses, Low-Voltage, Including Current-Limiting
Low-voltage fuses shall conform to NEMA FU 1. Time delay and nontime delay options shall be as specified. Equipment provided under this contract shall be provided with a complete set of properly rated fuses when the equipment manufacturer utilizes fuses in the manufacture of the equipment, or if current-limiting fuses are required to be installed to limit the ampere-interrupting capacity of circuit breakers or equipment to less than the maximum available fault current at the location of the equipment to be installed. Fuses shall have a voltage rating of not less than the phase-to-phase circuit voltage, and shall have the time-current characteristics required for effective power system coordination.
2.9.3.1 Cartridge Fuses
Cartridge fuses, current-limiting type, Class J, L, RK1, and RK5 shall have tested interrupting capacity not less than 200,000 amperes. Fuse holders shall be the type that will reject Class H fuses.
a. Class J and L fuses shall conform to UL 198M.
b . Class R fuses shall conform to UL 198M.
2.9.3.2 Transformer Circuit Fuses
Transformer circuit fuses shall be Class RK1 or RK5, current-limiting, time-delay with 200,000 amperes interrupting capacity.
2.10 SURGE ARRESTERS
Surge arresters shall comply with NEMA LA 1, and IEEE C62.11 and shall be provided where indicated. Arresters shall be distribution class, rated as shown. Arresters for use at elevations in excess of 6000 feet above mean sea level shall be specifically rated for that purpose. Arresters shall be equipped with mounting brackets suitable for the indicated installations.
Arresters shall be of the metal-oxide varistor type.
2.11 GROUNDING AND BONDING
Section 33 70 02.00 10 Page 16
2.11.1 Driven Ground Rods
Ground rods shall be copper-clad steel conforming to UL 467 not less than 3/4 inch in diameter by 10 feet in length. Sectional type rods may be used.
2.11.2 Grounding Conductors
Grounding conductors shall be bare, except where installed in conduit with associated phase conductors. Insulated conductors shall be of the same material as phase conductors and green color-coded, except that conductors shall be rated no more than 600 volts. Bare conductors shall be ASTM B 8 soft-drawn unless otherwise indicated. Aluminum is not acceptable.
2.12 CONCRETE AND REINFORCEMENT
Concrete work shall have minimum 4000 psi compressive strength and conform to the requirements of Section 03 3 00 CAST-IN-PLACE CONCRETE.
2.13 CABLE FIREPROOFING SYSTEMS
Cable fireproofing systems shall be listed in FM P7825a as a fire-protective coating or tape approved for grouped electrical conductors and shall be suitable for application on the type of medium-voltage cables provided.
After being fully cured, materials shall be suitable for use where exposed to oil, water, gases, salt water, sewage, and fungus and shall not damage cable jackets or insulation. Asbestos materials are not acceptable.
2.13.1 Fireproof Coating
Cable fireproofing coatings shall be compounded of water-based thermoplastic resins, flame-retardant chemicals, and inorganic noncombustible fibers and shall be suitable for the application methods used. Coatings applied on bundled cables shall have a derating factor of less than 5 percent, and a dielectric strength of 95 volts per mil minimum after curing.
2.13.2 Fireproofing Tape
Fireproofing tape shall be at least 2 inches wide and shall be a flexible, conformable, polymeric, elastomer tape designed specifically for fireproofing cables.
2.13.3 Plastic Tape
Preapplication plastic tape shall be pressure sensitive, 10 mil thick, conforming to UL 510.
2.14 LIQUID DIELECTRICS
Liquid dielectrics for transformers, capacitors, reclosers, and other liquid-filled electrical equipment shall be non-polychlorinated biphenyl (PCB) mineral-oil or less-flammable liquid as specified. Nonflammable fluids shall not be used. Tetrachloroethylene (perchloroethylene) and 1, 2, 4 trichlorobenzene fluids shall not be used. Liquid dielectrics in retrofitted equipment shall be certified by the manufacturer as having less than 2 parts per million (ppm) PCB content. In lieu of the manufacturer's certification, the Contractor may submit a test sample of the dielectric in
Section 33 70 02.00 10 Page 17 accordance with ASTM D 923 and have tests performed per ASTM D 4059 at a testing facility approved by the Contracting Officer. Equipment with test results indicating PCB level exceeding 2 ppm shall be replaced.
2.15 FACTORY TESTS
Factory tests shall be performed, as follows, in accordance with the applicable publications and with other requirements of these specifications.
The Contracting Officer shall be notified at least 10 days before the equipment is ready for testing. The Contracting Officer reserves the right to witness the tests.
a. Transformers: Manufacturer's standard tests in accordance with
IEEE C57.12.00.
b. Transformers rated 200 kVA and above: Reduced full-wave, chopped-wave, and full-wave impulse test on each line and neutral terminal, in accordance with IEEE C57.98.
c. High-Voltage Air Switches: Manufacturer's standard tests in accordance with IEEE C37.34 and IEEE C37.41.
d. Protective Relays: Seismic tests in accordance with IEC 60255-21-
3. Surge withstand tests in accordance with IEEE C37.90.1.
e. Relaying Current Transformers: Manufacturer's standard tests in accordance with IEEE C57.13.
f. Instrument Current Transformers: Manufacturer's standard tests in accordance with IEEE C57.13.
g. Factory Preformed Terminations: Wet withstand voltage tests in accordance with IEEE Std 48 for the next higher BIL level.
h. Outdoor Switchgear: Manufacturer's standard tests in accordance with IEEE C37.20.1, IEEE C37.20.2, and IEEE C37.20.3.
i. Electrical Power Insulators: Manufacturer's standard tests in accordance with NEMA C29.1.
2.16 COORDINATED POWER SYSTEM PROTECTION
Analyses shall be prepared to demonstrate that the equipment selected and system constructed meet the contract requirements for equipment ratings, coordination, and protection. They shall include a load flow analysis, a fault current analysis, and a protective device coordination study. The studies shall be performed by a registered professional engineer with demonstrated experience in power system coordination in the last three years. Provide a list of references complete with points of contact, addresses and telephone numbers. The selection of the engineer is subject to the approval of the Contracting Officer.
2.16.1 Scope of Analyses
The fault current analysis, and protective device coordination study shall begin at: the source bus and extended through the secondary side of transformers for medium voltage distribution feeders.
Section 33 70 02.00 10 Page 18
2.16.2 Determination of Facts
The time-current characteristics, features, and nameplate data for each existing protective device shall be determined and documented. Utilize the fault current availability indicated as a basis for fault current studies.
2.16.3 Single Line Diagram
A single line diagram shall be prepared to show the electrical system buses, devices, transformation points, and all sources of fault current (including generator and motor contributions). A fault-impedance diagram or a computer analysis diagram may be provided. Each bus, device or transformation point shall have a unique identifier. If a fault-impedance diagram is provided, impedance data shall be shown. Locations of switches, breakers, and circuit interrupting devices shall be shown on the diagram together with available fault data, and the device interrupting rating.
PART 3 EXECUTION
3.1 EXAMINATION
After becoming familiar with details of the work, verify dimensions in the field, and advise the Contracting Officer of any discrepancy before performing any work.
3.2 INSTALLATION REQUIREMENTS
Equipment and devices shall be installed and energized in accordance with the manufacturer's published instructions. Circuits installed aerially shall conform to the requirements of Section 33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION. Steel conduits installed underground shall be installed and protected from corrosion in conformance with the requirements of Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Except as covered herein, excavation, trenching, and backfilling shall conform to the requirements of Section 31 00 00 EARTHWORK. Concrete work shall have minimum 4000 psi compressive strength and conform to the requirements of Section 03 3 00
CAST-IN-PLACE CONCRETE.
3.2.1 Conformance to Codes
The installation shall comply with the requirements and recommendations of NFPA 70 and IEEE C2 as applicable.
3.2.2 Disposal of Liquid Dielectrics
PCB-contaminated dielectrics must be marked as PCB and transported to and incinerated by an approved EPA waste disposal facility. Furnish certification of proper disposal. Contaminated dielectrics shall not be diluted to lower the contamination level.
3.3 CABLE AND BUSWAY INSTALLATION
Obtain from the manufacturer an installation manual or set of instructions which addresses such aspects as cable construction, insulation type, cable diameter, bending radius, cable temperature, lubricants, coefficient of
Section 33 70 02.00 10 Page 19 friction, conduit cleaning, storage procedures, moisture seals, testing for and purging moisture, etc. And then perform pulling calculations and prepare a pulling plan which shall be submitted along with the manufacturers instructions in accordance with SUBMITTALS.
3.3.1 Cable Installation Plan and Procedure
Cable shall be installed strictly in accordance with the cable manufacturer's recommendations. Each circuit shall be identified by means of a fiber, laminated plastic, or non-ferrous metal tags, or approved equal, in each manhole, handhole, junction box, switchgrear, and transformers.
Each tag shall contain the following information; cable type, conductor size, circuit number, circuit voltage, cable destination, next hop/distant end equipment name and phase identification. Position the tags so they will be easy to read after the fireproofing is installed.
3.3.1.1 Cable Inspection
The cable reel shall be inspected for correct storage positions, signs of physical damage, and broken end seals. If end seal is broken, moisture shall be removed from cable in accordance with the cable manufacturer's recommendations.
3.3.1.2 Duct Cleaning
Duct shall be cleaned with an assembly that consists of a flexible mandrel (manufacturers standard product in lengths recommended for the specific size and type of duct) that is 1/4 inch less than inside diameter of duct, 2 wire brushes, and a rag. The cleaning assembly shall be pulled through conduit a minimum of 2 times or until less than a volume of 8 cubic inches of debris is expelled from the duct.
3.3.1.3 Duct Lubrication
The cable lubricant shall be compatible with the cable jacket for cable that is being installed. Application of lubricant shall be in accordance with lubricant manufacturer's recommendations.
3.3.1.4 Cable Installation
Provide a cable feeding truck and a cable pulling winch as required.
Provide a pulling grip or pulling eye in accordance with cable manufacturer's recommendations. The pulling grip or pulling eye apparatus shall be attached to polypropylene or manilla rope followed by lubricant front end packs and then by power cables. A dynamometer shall be used to monitor pulling tension. Pulling tension shall not exceed cable manufacturer's recommendations. Do not allow cables to cross over while cables are being fed into duct. For cable installation in cold weather, cables shall be kept at 50 degrees F temperature for at least 24 hours before installation.
3.3.1.5 Cable Installation Plan
Submit a cable installation plan for all cable pulls in accordance with the detail drawings portion of paragraph SUBMITTALS. Cable installation plan shall include:
Section 33 70 02.00 10 Page 20
a. Site layout drawing with cable pulls identified in numeric order of expected pulling sequence and direction of cable pull.
b. List of cable installation equipment.
c. Lubricant manufacturer's application instructions.
d. Procedure for resealing cable ends to prevent moisture from entering cable.
e. Cable pulling tension calculations of all cable pulls.
f. Cable percentage conduit fill.
g. Cable sidewall thrust pressure.
h. Cable minimum bend radius and minimum diameter of pulling wheels used.
i. Cable jam ratio.
j. Maximum allowable pulling tension on each different type and size of conductor.
k. Maximum allowable pulling tension on pulling device.
3.3.2 Duct Line
Cables shall be installed in duct lines where indicated. Cable splices in low-voltage cables shall be made in manholes and handholes only, except as otherwise noted. Cable joints in medium-voltage cables shall be made in manholes or approved pullboxes only. Neutral and grounding conductors shall be installed in the same duct with their associated phase conductors.
3.3.3 Cable Markers
Markers shall be located near the ends of cable runs, at each cable joint or splice, at approximately every 500 feet along cable runs, and at changes in direction of cable runs. In addition to markers, a 5 mil, brightly colored plastic tape not less than 3 inches in width and suitably inscribed at not more than 10 feet on centers, or other approved dig-in warning indication, shall be placed approximately 12 inches below finished grade levels of trenches. Contractor shall submit a sample of cable markers (utility) for approval.
3.3.4 Electric Manholes
Cables shall be routed around the interior walls and securely supported from walls on cables racks. Cable routing shall minimize cable crossover, provide access space for maintenance and installation of additional cables, and maintain cable separation in accordance with IEEE C2.
3.4 CABLE JOINTS
Medium-voltage cable joints shall be made by qualified cable splicers only.
Qualifications of cable splicers shall be submitted in accordance with
Section 33 70 02.00 10 Page 21 paragraph SUBMITTALS. Shields shall be applied as required to continue the shielding system through each entire cable joint. Shields may be integrally molded parts of preformed joints. Shields shall be grounded at each joint or in accordance with manufacturer's recommended practice. Cable joints shall provide insulation and jacket equivalent to that of the associated cable. Armored cable joints shall be enclosed in compound-filled, cast-iron or alloy, splice boxes equipped with stuffing boxes and armor clamps of a suitable type and size for the cable being installed.
3.5 FIREPROOFING
Each medium-voltage cable and conductor in manholes shall be fire-proofed for their entire length within the manhole. Where cables and conductors have been lubricated to enhance pulling into ducts, the lubricant shall be removed from cables and conductors exposed in the manhole before fireproofing.
3.5.1 Tape Method
Before application of fireproofing tape, plastic tape wrapping shall be applied over exposed metallic items such as the cable ground wire, metallic outer covering, or armor to minimize the possibility of corrosion from the fireproofing materials and moisture. Before applying fireproofing tape, irregularities of cables, such as at cable joints, shall be evened out with insulation putty. A flexible conformable polymeric elastomer fireproof tape shall be wrapped tightly around each cable spirally in 1/2 lapped wrapping or in 2 butt-jointed wrappings with the second wrapping covering the joints of the first.
3.5.2 Sprayable Method
Manholes shall be power ventilated until coatings are dry and dewatered and the coatings are cured. Ventilation requirements shall be in accordance with the manufacturer's instruction, but not less than 10 air changes per hour shall be provided. Cable coatings shall be applied by spray, brush, or glove to a wet film thickness that reduces to the dry film thickness approved for fireproofing by FM P7825a. Application methods and necessary safety precautions shall be in accordance with the manufacturers instructions. After application, cable coatings shall be dry to the touch in 1 to 2 hours and fully cured in 48 hours, except where the manufacturer has stated that because of unusual humidity or temperature, longer periods may be necessary.
3.6 DUCT LINES
3.6.1 Requirements
Numbers and sizes of ducts shall be as indicated. Duct lines shall be laid with a minimum slope of 4 inches per 100 feet. Depending on the contour of the finished grade, the high-point may be at a terminal, a manhole, a handhole, or between manholes or handholes. Short-radius manufactured 90-degree duct bends may be used only for pole or equipment risers, unless specifically indicated as acceptable. The minimum manufactured bend radius shall be 18 inches for ducts of less than 3 inch diameter, and 36 inches for ducts 3 inches or greater in diameter. Otherwise, long sweep bends having a minimum radius of 25 feet shall be used for a change of direction of more than 5 degrees, either horizontally or vertically. Both curved and straight
Section 33 70 02.00 10 Page 22 sections may be used to form long sweep bends, but the maximum curve used shall be 30 degrees and manufactured bends shall be used. Ducts shall be provided with end bells whenever duct lines terminate in manholes or handholes.
3.6.2 Treatment
Ducts shall be kept clean of concrete, dirt, or foreign substances during construction. Field cuts requiring tapers shall be made with proper tools and match factory tapers. A coupling recommended by the duct manufacturer shall be used whenever an existing duct is connected to a duct of different material or shape. Ducts shall be stored to avoid warping and deterioration with ends sufficiently plugged to prevent entry of any water or solid substances. Ducts shall be thoroughly cleaned before being laid. Plastic ducts shall be stored on a flat surface and protected from the direct rays of the sun.
3.6.3 Concrete Encasement
Ducts requiring concrete encasements shall comply with NFPA 70, except that electrical duct bank configurations for ducts 6 inches in diameter shall be determined by calculation and as shown on the drawings. The separation between adjacent electric power and communication ducts shall conform to IEEE C2. Duct line encasements shall be monolithic construction. Where a connection is made to a previously poured encasement, the new encasement shall be well bonded or doweled to the existing encasement. Submit proposed bonding method for approval in accordance with the detail drawing portion of paragraph SUBMITTALS. At any point, tops of concrete encasements shall be not less than the cover requirements listed in NFPA 70. Where ducts are jacked under existing pavement, rigid steel conduit will be installed because of its strength. To protect the corrosion-resistant conduit coating, predrilling or installing conduit inside a larger iron pipe sleeve (jack-and-sleeve) is required. Separators or spacing blocks shall be made of steel, concrete, plastic, or a combination of these materials placed not farther apart than 4 feet on centers. Ducts shall be securely anchored to prevent movement during the placement of concrete and joints shall be staggered at least 6 inches vertically.
3.6.5 Installation of Couplings
Joints in each type of duct shall be made up in accordance with the manufacturer's recommendations for the particular type of duct and coupling selected and as approved.
3.6.5.1 Plastic Duct
Duct joints shall be made by brushing a plastic solvent cement on insides of plastic coupling fittings and on outsides of duct ends. Each duct and fitting shall then be slipped together with a quick 1/4-turn twist to set the joint tightly.
3.6.6 Duct Line…