Atch_6_Pre-Site_visit_Q&A.pdf

PDF 123 KB Posted

Attached to
Replace Transformers Federal contract opportunity
Solicitation number
FA4613-17-R-0007
Issued by
Department of the Air Force Global Strike Command

About this file

Atch 6, Pre Site Visit Q&A

View the file

Other files for this federal contract opportunity

Other files attached to Replace Transformers, newest first.
File Type Posted
FA4613-17-R-0007-0004.pdf PDF
Atch_10,_Used_Oil_Report_1151&1152A_2_May_17.pdf PDF
Atch_9,_Post_Site_Visit_Q&A_2_May_17.pdf PDF
Atch_1,_SOW_Rev1_1_May_17.pdf PDF
FA4613-17-R-0007-0003.pdf PDF
Atch_8_Spec_Oct_16.pdf PDF
FA4613-17-R-0007-0002.pdf PDF
Atch_1,_SOW_4-14-17.pdf PDF
FA4613-17-R-0007-0001.pdf PDF
Atch_3,_WD.pdf PDF
Atch_1,_SOW_2-13-17.pdf PDF
Atch_5,_Form_66.pdf PDF
FA4613-17-R-0007_Solicitation_10_Mar_17.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 6 FA4613‐17‐R‐0001 Amendment 01, Pre Site Visit Q&A, (Q1) The contractor is to provide (2) PME switches SG‐D‐001 AND SG‐D‐002. Detail B on E‐301 indicates only a S&C PMH‐11 or equal will be approved, should this be a changed to a PME switch?

(A1) The specification should read for PME switches or equivalent in lieu of PMH switch or equivalent.

(Q2) Page 5 of the SOW (7)(b) 4‐ 500 KCMIL conductors are to be installed in new 1 ½ conduit, should this be 3 ½ as the minimum size for 4‐ 500 KCMIL conductors is 3 ½ conduit? Can 4” inch conduit be used instead of 3 ½ ?

(A2) The specification should read 3 ½ instead of 1 ½ and 4 conduit can be used. SOW updated see Rev 1 dated 14 April 2017