Attachment 6 FA4613‐17‐R‐0001 Amendment 01, Pre Site Visit Q&A, (Q1) The contractor is to provide (2) PME switches SG‐D‐001 AND SG‐D‐002. Detail B on E‐301 indicates only a S&C PMH‐11 or equal will be approved, should this be a changed to a PME switch?
(A1) The specification should read for PME switches or equivalent in lieu of PMH switch or equivalent.
(Q2) Page 5 of the SOW (7)(b) 4‐ 500 KCMIL conductors are to be installed in new 1 ½ conduit, should this be 3 ½ as the minimum size for 4‐ 500 KCMIL conductors is 3 ½ conduit? Can 4” inch conduit be used instead of 3 ½ ?
(A2) The specification should read 3 ½ instead of 1 ½ and 4 conduit can be used. SOW updated see Rev 1 dated 14 April 2017