Atch_5,_Form_66.pdf

PDF 35 KB Posted

Attached to
Replace Transformers Federal contract opportunity
Solicitation number
FA4613-17-R-0007
Issued by
Department of the Air Force Global Strike Command

About this file

Replace Transformers Form 66

View the file

Other files for this federal contract opportunity

Other files attached to Replace Transformers, newest first.
File Type Posted
Atch_9,_Post_Site_Visit_Q&A_2_May_17.pdf PDF
Atch_1,_SOW_Rev1_1_May_17.pdf PDF
FA4613-17-R-0007-0004.pdf PDF
Atch_10,_Used_Oil_Report_1151&1152A_2_May_17.pdf PDF
FA4613-17-R-0007-0003.pdf PDF
FA4613-17-R-0007-0002.pdf PDF
Atch_8_Spec_Oct_16.pdf PDF
Atch_6_Pre-Site_visit_Q&A.pdf PDF
Atch_1,_SOW_4-14-17.pdf PDF
FA4613-17-R-0007-0001.pdf PDF
FA4613-17-R-0007_Solicitation_10_Mar_17.pdf PDF
Atch_3,_WD.pdf PDF
Atch_1,_SOW_2-13-17.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER

Page 66-1 GHLN 13-0015 REPLACE LIVE FRONT TRANSFORMER DISCONNECTS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Number of Copies Required

LI

N

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

E R

TI

FI

C A

TI

O

N S

S H

O P

D R

A W

IN

G

S

S A

M P

LE

S

R E

P O

R

TS

/P E

R M

IT

S

Q U

A

LI

FI

C

A

TI

O N

S

M A

N U

FA

C

TU

R

E R

'S W

A R

R A

N

TY

C A

TA

LO

G D

A

TA

L

IT

E

R A

TU

R

E

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

M A

N U

FA

C

TU

R

E R

'S

E

C C

O M

E N

D A

TI

O

N S

D E

S

IG

N

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A

TE

D A

TE

R

E C

E

IV

E D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

E E

R

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

S U

B M

IT

TA

L N

U M

B E

R S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

A C

TO

R

R E

S U

B M

IT

TA

L

FI

N

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

Demolition Plan (Sec. 02 41 00 - 1.2.1) 3 Prior to

Start

Certificates - Notification (Sec. 02 41 00 - 1.7) 3 3

Prior to Start

Certificates - Sampling and Analysis Plan (Sec. 02 84 33 - 1.7.2) 3 3

Prior to Start

PCB removal work plan (Sec. 02 84 33 - 1.7.4) 3 3 Prior to

Start

PCB disposal plan (Sec. 02 84 33 - 1.7.5) 3 3 Prior to

Start

Preconstruction Submittals - Conduits and Raceways (Sec. 26 05 00.00 40 - 2.1.1)

2 2 2 2 2 2 2 2 Prior to Start

Preconstruction Submittals - Wire and Cable (Sec. 26 05 00.00 40 - 2.1.3)

2 2 2 2 2 2 2 2 Prior to Start

Preconstruction Submittals - Splices and Connectors (Sec. 26 05 00.00 40 - 3.2.1.7)

2 2 2 2 2 2 2 2 Prior to Start

Preconstruction Submittals - Switches (Sec. 26 05 00.00 40 - 2.1.4) 2 2 2 2 2 2 2 2 Prior to

Start

Preconstruction Submittals - Receptacles (Sec. 26 05 00.00 40) 2 2 2 2 2 2 2 2 Prior to

Start

Preconstruction Submittals - Outlet Boxes, Pull Boxes and Junction Boxes (Sec. 26 05 00.00 40 - 2.1.5)

2 2 2 2 2 2 2 2 Prior to Start

Preconstruction Submittals - Circuit Breakers (Sec. 26 05 00.00 40 - 2.1.5)

2 2 2 2 2 2 2 2 Prior to Start

Page 66-2 GHLN 13-0015 REPLACE LIVE FRONT TRANSFORMER DISCONNECTS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Number of Copies Required

LI

N

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

E R

TI

FI

C A

TI

O

N S

S H

O P

D R

A W

IN

G

S

S A

M P

LE

S

R E

P O

R

TS

/P E

R M

IT

S

Q U

A

LI

FI

C

A

TI

O N

S

M A

N U

FA

C

TU

R

E R

'S W

A R

R A

N

TY

C A

TA

LO

G D

A

TA

L

IT

E

R A

TU

R

E

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

M A

N U

FA

C

TU

R

E

C C

O M

E N

D A

TI

O

N S

D E

S

IG

N

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A

TE

D A

TE

R

E C

E

IV

E D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

E E

R

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

S U

B M

IT

TA

L N

U M

B E

R S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

A C

TO

R

R E

S U

B M

IT

TA

L

FI

N

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

Preconstruction Submittals - Panelboards (Sec. 26 05 00.00 40 - 2.1.5)

2 2 2 2 2 2 2 2 Prior to Start

Preconstruction Submittals - Lamps and Lighting Fixtures (Sec. 26 05 00.00 40 - 2.1.5)

2 2 2 2 2 2 2 2 Prior to Start

Preconstruction Submittals - Dry-Type Distribution Transformers (Sec. 26 05 00.00 40 - 2.1.8)

2 2 2 2 2 2 2 2 Prior to Start

Test Reports - Continuity Test (Sec. 26 05 00.00 40 - 3.3) 3 3 3 3 3

Prior to Use

Test Reports - Phase-Rotation Tests (Sec. 26 05 00.00 40 - 3.3) 3 3 3 3 3 Prior to

Use

Test Reports - Insulation Resistance Test (Sec. 26 05 00.00 40 - 3.3) 3 3 3 3 3 Prior to

Use

Product Data - Multiple-Conductor Shielded Cables (Sec. 26 05 13.00 40 - 2.2.1)

2 2 2 2 2 2 2 2 Prior to Start

Product Data - Multiple-Conductor Nonshielded Cables (Sec. 26 05 13.00 40 - 2.2.2)

2 2 2 2 2 2 2 2 Prior to Start

Product Data - Single-Conductor Shielded Cables (Sec. 26 05 13.00 40 - 2.2.3)

2 2 2 2 2 2 2 2 Prior to Start

Product Data - Single-Conductor Nonshielded Cables (Sec. 26 05 13.00 40 - 2.2.4)

2 2 2 2 2 2 2 2 Prior to Start

Product Data - Portable Cables (Sec.

26 05 13.00 40 - 2.2.5) 2 2 2 2 2 2 2 2 Prior to

Start

Product Data - Nonmetallic Jacket (Sec. 26 05 13.00 40 - 2.3.3) 2 2 2 2 2 2 2 2

Prior to Start

Page 66-3 GHLN 13-0015 REPLACE LIVE FRONT TRANSFORMER DISCONNECTS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Number of Copies Required

LI

N

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

E R

TI

FI

C A

TI

O

N S

S H

O P

D R

A W

IN

G

S

S A

M P

LE

S

R E

P O

R

TS

/P E

R M

IT

S

Q U

A

LI

FI

C

A

TI

O N

S

M A

N U

FA

C

TU

R

E R

'S W

A R

R A

N

TY

C A

TA

LO

G D

A

TA

L

IT

E

R A

TU

R

E

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

M A

N U

FA

C

TU

R

E

C C

O M

E N

D A

TI

O

N S

D E

S

IG

N

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A

TE

D A

TE

R

E C

E

IV

E D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

E E

R

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

S U

B M

IT

TA

L N

U M

B E

R S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

A C

TO

R

R E

S U

B M

IT

TA

L

FI

N

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

Test Reports - Dielectric Absorption Tests (Sec. 26 05 13.00 40 - 3.2) 3 3 3 3 3 Prior to

Use

Test Reports - Medium-Voltage Tests (Sec. 26 05 13.00 40 - 3.2) 3 3 3 3 3 Prior to

Use

Test Reports - Radiographic Tests (Sec. 26 05 13.00 40 - 3.2) 3 3 3 3 3 Prior to

Use

Certificates - Certificates (Sec. 26 05 13.00 40 - 2.4) 3 3 3 Contract

Closeout

Certificates - Lead Sheath (Sec. 26 05 13.00 40 - 2.2.1.1) 3 3 3 3

At Contract Closeout

Certificates - Flammability (Sec. 26 05 13.00 40 - 2.4.1) 3 3 3 3

At Contract Closeout

Certificates - Minimum Bending Radius (Sec. 26 05 13.00 40 - 3.1.4) 3 3 3 3

At Contract Closeout

Certificates - Medium-Voltage Tests (Sec. 26 05 13.00 40 - 3.2) 3 3 3 3

At Contract Closeout

Certificates - Dielectric Absorption Tests (Sec. 26 05 13.00 40 - 3.2) 3 3 3 3

At Contract Closeout

Certificates - Cable Splicers (Sec. 26 05 13.00 40 - 1.6) 3 3 3 3

At Contract Closeout

Manufacturer’s Instructions - Medium- Voltage Power Cables (Sec. 26 05

13.00 40 - 1.5)

3 3 3 3 At

Contract Closeout

Manufacturer’s Instructions - Pothead Terminations (Sec. 26 05 13.00 40 - 1.5)

3 3 3 3 At

Contract Closeout

Page 66-4 GHLN 13-0015 REPLACE LIVE FRONT TRANSFORMER DISCONNECTS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Number of Copies Required

LI

N

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

E R

TI

FI

C A

TI

O

N S

S H

O P

D R

A W

IN

G

S

S A

M P

LE

S

R E

P O

R

TS

/P E

R M

IT

S

Q U

A

LI

FI

C

A

TI

O N

S

M A

N U

FA

C

TU

R

E R

'S W

A R

R A

N

TY

C A

TA

LO

G D

A

TA

L

IT

E

R A

TU

R

E

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

M A

N U

FA

C

TU

R

E

C C

O M

E N

D A

TI

O

N S

D E

S

IG

N

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A

TE

D A

TE

R

E C

E

IV

E D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

E E

R

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

S U

B M

IT

TA

L N

U M

B E

R S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

A C

TO

R

R E

S U

B M

IT

TA

L

FI

N

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

Test Reports - Acceptance tests and inspections (Sec. 26 08 00 - 3.1) 3 3 3 3 3 Prior to Use

Certificates - Qualifications (Sec. 26 08 00 - 1.3.1) 3 3 3 3 Prior to

Construction

Certificates - Acceptance test and inspections procedure (Sec. 26 05 00 - 1.3.3)

3 3 3 3 Prior to Construction

Shop Drawings - Pad-mounted transformer drawings (Sec. 26 12 19.10 - 1.5.1)

2 2 2 2 2 2 2 2 Prior to Start

Product Data - Pad-mounted transformers (Sec. 26 12 19.10 - 2.2) 2 2 2 2 2 2 2 2 Prior to Start

Test Reports - Acceptance checks and tests (Sec. 26 12 19.10 - 3.6.1) 3 3 3 3 3 At Contract

Closeout

Certificates - Transformer Efficiencies (Sec. 26 12 19.10 - 2.2.2.1) 3 3 3 3 At Contract

Closeout

Manufacturer’s Field design tests (Sec.

26 12 19.10 - 2.7.2) 3 3 3 3 At Contract

Closeout

Manufacturer’s Field routine and other tests (Sec. 26 12 19.10 - 2.7.3) 3 3 3 3 At Contract

Closeout

Operation and Maintenance Data - Transformer(s) (Sec. 26 12 19.10 - 1.6.1)

3 3 3 3 3 At Contract Closeout

Closeout Submittals - Transformer test schedule (Sec. 26 12 19.10 - 2.7.1)

2 2 2 2 2 2 2 At Contract Closeout

Shop Drawings - Switchgear Drawings (Sec. 26 13 01 - 1.5.1) 2 2 2 2 2 2 2 2 Prior to Start

Page 66-5 GHLN 13-0015 REPLACE LIVE FRONT TRANSFORMER DISCONNECTS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Number of Copies Required

LI

N

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

E R

TI

FI

C A

TI

O

N S

S H

O P

D R

A W

IN

G

S

S A

M P

LE

S

R E

P O

R

TS

/P E

R M

IT

S

Q U

A

LI

FI

C

A

TI

O N

S

M A

N U

FA

C

TU

R

E R

'S W

A R

R A

N

TY

C A

TA

LO

G D

A

TA

L

IT

E

R A

TU

R

E

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

M A

N U

FA

C

TU

R

E

C C

O M

E N

D A

TI

O

N S

D E

S

IG

N

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A

TE

D A

TE

R

E C

E

IV

E D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

E E

R

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

S U

B M

IT

TA

L N

U M

B E

R S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

A C

TO

R

R E

S U

B M

IT

TA

L

FI

N

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

Product Data - Fuse Time-Current Characteristic Curves (Sec. 26 13 01 - 1.5.2)

2 2 2 2 2 2 2 2 Prior to Start

Product Data - Air Insulated Pad-mounted Switchgear (Sec. 26 13 01 - 2.1)

2 2 2 2 2 2 2 2 Prior to Start

Product Data - Insulated High-Voltage Connectors (Sec. 26 13 01 - 2.2)

2 2 2 2 2 2 2 2 Prior to Start

Product Data - Surge Arresters (Sec.

26 13 01 - 2.3) 2 2 2 2 2 2 2 2 Prior to Start

Test Reports - Acceptance Checks and Tests (Sec. 26 13 01 - 3.4.1) 3 3 3 3 3 Prior to Use

Certificates - Paint Coating System (Sec. 26 13 01) 3 3 3 3 At Contract

Closeout

Manufacturer’s Field Reports - Switchgear design and production tests (Sec. 26 13 01 - 2.6.1)

3 3 3 3 At Contract Closeout

Operation and Maintenance Data - Air Insulated Pad-Mounted Switchgear Operation and Maintenance (Sec. 26 13 01 1 6 1)

3 3 3 3 3 At Contract Closeout

Shop Drawings - Precast underground structures (Sec. 33 71 02 - 1.6.1)

2 2 2 2 2 2 2 2 Prior to Start

Product Data - Medium voltage cable (Sec. 33 71 02 - 2.5) 2 2 2 2 2 2 2 2 Prior to Start

Product Data - Medium voltage cable joints (Sec. 33 71 02 - 2.7) 2 2 2 2 2 2 2 2 Prior to Start

Product Data - Medium voltage cable terminations (Sec. 33 71 02 - 2.6)

2 2 2 2 2 2 2 2 Prior to Start

Page 66-6 GHLN 13-0015 REPLACE LIVE FRONT TRANSFORMER DISCONNECTS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

Number of Copies Required

LI

N

E N

U M

B E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

C

E R

TI

FI

C A

TI

O

N S

S H

O P

D R

A W

IN

G

S

S A

M P

LE

S

R E

P O

R

TS

/P E

R M

IT

S

Q U

A

LI

FI

C

A

TI

O N

S

M A

N U

FA

C

TU

R

E R

'S W

A R

R A

N

TY

C A

TA

LO

G D

A

TA

L

IT

E

R A

TU

R

E

O P

E R

A

TI

N G

IN

S

TR

U

C

TI

O N

S

M A

N U

FA

C

TU

R

E

C C

O M

E N

D A

TI

O

N S

D E

S

IG

N

R E

Q U

IR

E

D S

U B

M

IS

S

IO

N D

A

TE

D A

TE

R

E C

E

IV

E D

IN

C

O N

TR

A

C

TI

N G

D A

TE

T

O C

IV

IL

E N

G

IN

E E

R

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

S U

B M

IT

TA

L N

U M

B E

R S

DATE CONTRACTOR

NOTIFIED

C O

N

TR

A C

TO

R

R E

S U

B M

IT

TA

L

FI

N

A L

A P

P R

O V

A L

REMARKS

APPROVED

DIS-

APPROVED

Product Data - Precast concrete structures (Sec. 33 71 02 - 2.12.1.1) 2 2 2 2 2 2 2 2 Prior to Start

Product Data - Manhole frames and covers (Sec. 33 71 02 - 2.12.2) 2 2 2 2 2 2 2 2 Prior to Start

Product Data - Handhole frames and covers (Sec. 33 71 02 - 2.12.3) 2 2 2 2 2 2 2 2 Prior to Start

Product Data - Composite/fiberglass handholes (Sec. 33 71 02 - 2.12.5) 2 2 2 2 2 2 2 2 Prior to Start

Product Data - Cable supports (Sec.

33 71 02 - 2.13) 2 2 2 2 2 2 2 2 Prior to Start

Test Reports - Medium voltage cable qualification and production tests (Sec.

33 71 02 - 2.17.2)

3 3 3 3 3 Prior to Use

Test Reports - Field Acceptance Checks and Tests (Sec. 33 71 02 - 3.17.7)

3 3 3 3 3 Prior to Use

Test Reports - Arc-proofing test (Sec.

33 71 02 - 2.17.1) 3 3 3 3 3 Prior to Use

Test Reports - Cable Installation Plan and Procedure (Sec. 33 71 02 - 3.3)

3 3 3 3 3 Prior to Use

Certificates - Cable splicer/terminator (Sec. 33 71 02 - 1.6.2) 3 3 3 3 At Contract

Closeout

Certificates - Cable Installer Qualifications (Sec. 33 71 02 - 1.6.3) 3 3 3 3 At Contract

Closeout

Pre-Final Inspection Report (Sec. 01 00 00 - 1.28) 2 Prior to Closeout

Final Inspection Report (Sec. 01 00 00 - 1.28) 2 Prior to Closeout

GHLN 13-000015 Form 66 1
GHLN 13-000015 Form 66 2
GHLN 13-000015 Form 66 3
GHLN 13-000015 Form 66 4
GHLN 13-000015 Form 66 5
GHLN 13-000015 Form 66 6

File details come from the government source that posted it. Updated .