Atch_5,_Form_66.pdf
PDF 35 KB Posted
- Attached to
- Replace Transformers Federal contract opportunity
- Solicitation number
- FA4613-17-R-0007
About this file
Replace Transformers Form 66
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_9,_Post_Site_Visit_Q&A_2_May_17.pdf | ||
| Atch_1,_SOW_Rev1_1_May_17.pdf | ||
| FA4613-17-R-0007-0004.pdf | ||
| Atch_10,_Used_Oil_Report_1151&1152A_2_May_17.pdf | ||
| FA4613-17-R-0007-0003.pdf | ||
| FA4613-17-R-0007-0002.pdf | ||
| Atch_8_Spec_Oct_16.pdf | ||
| Atch_6_Pre-Site_visit_Q&A.pdf | ||
| Atch_1,_SOW_4-14-17.pdf | ||
| FA4613-17-R-0007-0001.pdf | ||
| FA4613-17-R-0007_Solicitation_10_Mar_17.pdf | ||
| Atch_3,_WD.pdf | ||
| Atch_1,_SOW_2-13-17.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER
Page 66-1 GHLN 13-0015 REPLACE LIVE FRONT TRANSFORMER DISCONNECTS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Number of Copies Required
LI
N
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
E R
TI
FI
C A
TI
O
N S
S H
O P
D R
A W
IN
G
S
S A
M P
LE
S
R E
P O
R
TS
/P E
R M
IT
S
Q U
A
LI
FI
C
A
TI
O N
S
M A
N U
FA
C
TU
R
E R
'S W
A R
R A
N
TY
C A
TA
LO
G D
A
TA
L
IT
E
R A
TU
R
E
O P
E R
A
TI
N G
IN
S
TR
U
C
TI
O N
S
M A
N U
FA
C
TU
R
E R
'S
E
C C
O M
E N
D A
TI
O
N S
D E
S
IG
N
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
TE
D A
TE
R
E C
E
IV
E D
IN
C
O N
TR
A
C
TI
N G
D A
TE
T
O C
IV
IL
E N
G
IN
E E
R
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
S U
B M
IT
TA
L N
U M
B E
R S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
A C
TO
R
R E
S U
B M
IT
TA
L
FI
N
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
Demolition Plan (Sec. 02 41 00 - 1.2.1) 3 Prior to
Start
Certificates - Notification (Sec. 02 41 00 - 1.7) 3 3
Prior to Start
Certificates - Sampling and Analysis Plan (Sec. 02 84 33 - 1.7.2) 3 3
Prior to Start
PCB removal work plan (Sec. 02 84 33 - 1.7.4) 3 3 Prior to
Start
PCB disposal plan (Sec. 02 84 33 - 1.7.5) 3 3 Prior to
Start
Preconstruction Submittals - Conduits and Raceways (Sec. 26 05 00.00 40 - 2.1.1)
2 2 2 2 2 2 2 2 Prior to Start
Preconstruction Submittals - Wire and Cable (Sec. 26 05 00.00 40 - 2.1.3)
2 2 2 2 2 2 2 2 Prior to Start
Preconstruction Submittals - Splices and Connectors (Sec. 26 05 00.00 40 - 3.2.1.7)
2 2 2 2 2 2 2 2 Prior to Start
Preconstruction Submittals - Switches (Sec. 26 05 00.00 40 - 2.1.4) 2 2 2 2 2 2 2 2 Prior to
Start
Preconstruction Submittals - Receptacles (Sec. 26 05 00.00 40) 2 2 2 2 2 2 2 2 Prior to
Start
Preconstruction Submittals - Outlet Boxes, Pull Boxes and Junction Boxes (Sec. 26 05 00.00 40 - 2.1.5)
2 2 2 2 2 2 2 2 Prior to Start
Preconstruction Submittals - Circuit Breakers (Sec. 26 05 00.00 40 - 2.1.5)
2 2 2 2 2 2 2 2 Prior to Start
Page 66-2 GHLN 13-0015 REPLACE LIVE FRONT TRANSFORMER DISCONNECTS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Number of Copies Required
LI
N
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
E R
TI
FI
C A
TI
O
N S
S H
O P
D R
A W
IN
G
S
S A
M P
LE
S
R E
P O
R
TS
/P E
R M
IT
S
Q U
A
LI
FI
C
A
TI
O N
S
M A
N U
FA
C
TU
R
E R
'S W
A R
R A
N
TY
C A
TA
LO
G D
A
TA
L
IT
E
R A
TU
R
E
O P
E R
A
TI
N G
IN
S
TR
U
C
TI
O N
S
M A
N U
FA
C
TU
R
E
C C
O M
E N
D A
TI
O
N S
D E
S
IG
N
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
TE
D A
TE
R
E C
E
IV
E D
IN
C
O N
TR
A
C
TI
N G
D A
TE
T
O C
IV
IL
E N
G
IN
E E
R
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
S U
B M
IT
TA
L N
U M
B E
R S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
A C
TO
R
R E
S U
B M
IT
TA
L
FI
N
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
Preconstruction Submittals - Panelboards (Sec. 26 05 00.00 40 - 2.1.5)
2 2 2 2 2 2 2 2 Prior to Start
Preconstruction Submittals - Lamps and Lighting Fixtures (Sec. 26 05 00.00 40 - 2.1.5)
2 2 2 2 2 2 2 2 Prior to Start
Preconstruction Submittals - Dry-Type Distribution Transformers (Sec. 26 05 00.00 40 - 2.1.8)
2 2 2 2 2 2 2 2 Prior to Start
Test Reports - Continuity Test (Sec. 26 05 00.00 40 - 3.3) 3 3 3 3 3
Prior to Use
Test Reports - Phase-Rotation Tests (Sec. 26 05 00.00 40 - 3.3) 3 3 3 3 3 Prior to
Use
Test Reports - Insulation Resistance Test (Sec. 26 05 00.00 40 - 3.3) 3 3 3 3 3 Prior to
Use
Product Data - Multiple-Conductor Shielded Cables (Sec. 26 05 13.00 40 - 2.2.1)
2 2 2 2 2 2 2 2 Prior to Start
Product Data - Multiple-Conductor Nonshielded Cables (Sec. 26 05 13.00 40 - 2.2.2)
2 2 2 2 2 2 2 2 Prior to Start
Product Data - Single-Conductor Shielded Cables (Sec. 26 05 13.00 40 - 2.2.3)
2 2 2 2 2 2 2 2 Prior to Start
Product Data - Single-Conductor Nonshielded Cables (Sec. 26 05 13.00 40 - 2.2.4)
2 2 2 2 2 2 2 2 Prior to Start
Product Data - Portable Cables (Sec.
26 05 13.00 40 - 2.2.5) 2 2 2 2 2 2 2 2 Prior to
Start
Product Data - Nonmetallic Jacket (Sec. 26 05 13.00 40 - 2.3.3) 2 2 2 2 2 2 2 2
Prior to Start
Page 66-3 GHLN 13-0015 REPLACE LIVE FRONT TRANSFORMER DISCONNECTS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Number of Copies Required
LI
N
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
E R
TI
FI
C A
TI
O
N S
S H
O P
D R
A W
IN
G
S
S A
M P
LE
S
R E
P O
R
TS
/P E
R M
IT
S
Q U
A
LI
FI
C
A
TI
O N
S
M A
N U
FA
C
TU
R
E R
'S W
A R
R A
N
TY
C A
TA
LO
G D
A
TA
L
IT
E
R A
TU
R
E
O P
E R
A
TI
N G
IN
S
TR
U
C
TI
O N
S
M A
N U
FA
C
TU
R
E
C C
O M
E N
D A
TI
O
N S
D E
S
IG
N
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
TE
D A
TE
R
E C
E
IV
E D
IN
C
O N
TR
A
C
TI
N G
D A
TE
T
O C
IV
IL
E N
G
IN
E E
R
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
S U
B M
IT
TA
L N
U M
B E
R S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
A C
TO
R
R E
S U
B M
IT
TA
L
FI
N
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
Test Reports - Dielectric Absorption Tests (Sec. 26 05 13.00 40 - 3.2) 3 3 3 3 3 Prior to
Use
Test Reports - Medium-Voltage Tests (Sec. 26 05 13.00 40 - 3.2) 3 3 3 3 3 Prior to
Use
Test Reports - Radiographic Tests (Sec. 26 05 13.00 40 - 3.2) 3 3 3 3 3 Prior to
Use
Certificates - Certificates (Sec. 26 05 13.00 40 - 2.4) 3 3 3 Contract
Closeout
Certificates - Lead Sheath (Sec. 26 05 13.00 40 - 2.2.1.1) 3 3 3 3
At Contract Closeout
Certificates - Flammability (Sec. 26 05 13.00 40 - 2.4.1) 3 3 3 3
At Contract Closeout
Certificates - Minimum Bending Radius (Sec. 26 05 13.00 40 - 3.1.4) 3 3 3 3
At Contract Closeout
Certificates - Medium-Voltage Tests (Sec. 26 05 13.00 40 - 3.2) 3 3 3 3
At Contract Closeout
Certificates - Dielectric Absorption Tests (Sec. 26 05 13.00 40 - 3.2) 3 3 3 3
At Contract Closeout
Certificates - Cable Splicers (Sec. 26 05 13.00 40 - 1.6) 3 3 3 3
At Contract Closeout
Manufacturer’s Instructions - Medium- Voltage Power Cables (Sec. 26 05
13.00 40 - 1.5)
3 3 3 3 At
Contract Closeout
Manufacturer’s Instructions - Pothead Terminations (Sec. 26 05 13.00 40 - 1.5)
3 3 3 3 At
Contract Closeout
Page 66-4 GHLN 13-0015 REPLACE LIVE FRONT TRANSFORMER DISCONNECTS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Number of Copies Required
LI
N
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
E R
TI
FI
C A
TI
O
N S
S H
O P
D R
A W
IN
G
S
S A
M P
LE
S
R E
P O
R
TS
/P E
R M
IT
S
Q U
A
LI
FI
C
A
TI
O N
S
M A
N U
FA
C
TU
R
E R
'S W
A R
R A
N
TY
C A
TA
LO
G D
A
TA
L
IT
E
R A
TU
R
E
O P
E R
A
TI
N G
IN
S
TR
U
C
TI
O N
S
M A
N U
FA
C
TU
R
E
C C
O M
E N
D A
TI
O
N S
D E
S
IG
N
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
TE
D A
TE
R
E C
E
IV
E D
IN
C
O N
TR
A
C
TI
N G
D A
TE
T
O C
IV
IL
E N
G
IN
E E
R
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
S U
B M
IT
TA
L N
U M
B E
R S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
A C
TO
R
R E
S U
B M
IT
TA
L
FI
N
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
Test Reports - Acceptance tests and inspections (Sec. 26 08 00 - 3.1) 3 3 3 3 3 Prior to Use
Certificates - Qualifications (Sec. 26 08 00 - 1.3.1) 3 3 3 3 Prior to
Construction
Certificates - Acceptance test and inspections procedure (Sec. 26 05 00 - 1.3.3)
3 3 3 3 Prior to Construction
Shop Drawings - Pad-mounted transformer drawings (Sec. 26 12 19.10 - 1.5.1)
2 2 2 2 2 2 2 2 Prior to Start
Product Data - Pad-mounted transformers (Sec. 26 12 19.10 - 2.2) 2 2 2 2 2 2 2 2 Prior to Start
Test Reports - Acceptance checks and tests (Sec. 26 12 19.10 - 3.6.1) 3 3 3 3 3 At Contract
Closeout
Certificates - Transformer Efficiencies (Sec. 26 12 19.10 - 2.2.2.1) 3 3 3 3 At Contract
Closeout
Manufacturer’s Field design tests (Sec.
26 12 19.10 - 2.7.2) 3 3 3 3 At Contract
Closeout
Manufacturer’s Field routine and other tests (Sec. 26 12 19.10 - 2.7.3) 3 3 3 3 At Contract
Closeout
Operation and Maintenance Data - Transformer(s) (Sec. 26 12 19.10 - 1.6.1)
3 3 3 3 3 At Contract Closeout
Closeout Submittals - Transformer test schedule (Sec. 26 12 19.10 - 2.7.1)
2 2 2 2 2 2 2 At Contract Closeout
Shop Drawings - Switchgear Drawings (Sec. 26 13 01 - 1.5.1) 2 2 2 2 2 2 2 2 Prior to Start
Page 66-5 GHLN 13-0015 REPLACE LIVE FRONT TRANSFORMER DISCONNECTS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Number of Copies Required
LI
N
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
E R
TI
FI
C A
TI
O
N S
S H
O P
D R
A W
IN
G
S
S A
M P
LE
S
R E
P O
R
TS
/P E
R M
IT
S
Q U
A
LI
FI
C
A
TI
O N
S
M A
N U
FA
C
TU
R
E R
'S W
A R
R A
N
TY
C A
TA
LO
G D
A
TA
L
IT
E
R A
TU
R
E
O P
E R
A
TI
N G
IN
S
TR
U
C
TI
O N
S
M A
N U
FA
C
TU
R
E
C C
O M
E N
D A
TI
O
N S
D E
S
IG
N
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
TE
D A
TE
R
E C
E
IV
E D
IN
C
O N
TR
A
C
TI
N G
D A
TE
T
O C
IV
IL
E N
G
IN
E E
R
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
S U
B M
IT
TA
L N
U M
B E
R S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
A C
TO
R
R E
S U
B M
IT
TA
L
FI
N
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
Product Data - Fuse Time-Current Characteristic Curves (Sec. 26 13 01 - 1.5.2)
2 2 2 2 2 2 2 2 Prior to Start
Product Data - Air Insulated Pad-mounted Switchgear (Sec. 26 13 01 - 2.1)
2 2 2 2 2 2 2 2 Prior to Start
Product Data - Insulated High-Voltage Connectors (Sec. 26 13 01 - 2.2)
2 2 2 2 2 2 2 2 Prior to Start
Product Data - Surge Arresters (Sec.
26 13 01 - 2.3) 2 2 2 2 2 2 2 2 Prior to Start
Test Reports - Acceptance Checks and Tests (Sec. 26 13 01 - 3.4.1) 3 3 3 3 3 Prior to Use
Certificates - Paint Coating System (Sec. 26 13 01) 3 3 3 3 At Contract
Closeout
Manufacturer’s Field Reports - Switchgear design and production tests (Sec. 26 13 01 - 2.6.1)
3 3 3 3 At Contract Closeout
Operation and Maintenance Data - Air Insulated Pad-Mounted Switchgear Operation and Maintenance (Sec. 26 13 01 1 6 1)
3 3 3 3 3 At Contract Closeout
Shop Drawings - Precast underground structures (Sec. 33 71 02 - 1.6.1)
2 2 2 2 2 2 2 2 Prior to Start
Product Data - Medium voltage cable (Sec. 33 71 02 - 2.5) 2 2 2 2 2 2 2 2 Prior to Start
Product Data - Medium voltage cable joints (Sec. 33 71 02 - 2.7) 2 2 2 2 2 2 2 2 Prior to Start
Product Data - Medium voltage cable terminations (Sec. 33 71 02 - 2.6)
2 2 2 2 2 2 2 2 Prior to Start
Page 66-6 GHLN 13-0015 REPLACE LIVE FRONT TRANSFORMER DISCONNECTS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
Number of Copies Required
LI
N
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C
E R
TI
FI
C A
TI
O
N S
S H
O P
D R
A W
IN
G
S
S A
M P
LE
S
R E
P O
R
TS
/P E
R M
IT
S
Q U
A
LI
FI
C
A
TI
O N
S
M A
N U
FA
C
TU
R
E R
'S W
A R
R A
N
TY
C A
TA
LO
G D
A
TA
L
IT
E
R A
TU
R
E
O P
E R
A
TI
N G
IN
S
TR
U
C
TI
O N
S
M A
N U
FA
C
TU
R
E
C C
O M
E N
D A
TI
O
N S
D E
S
IG
N
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A
TE
D A
TE
R
E C
E
IV
E D
IN
C
O N
TR
A
C
TI
N G
D A
TE
T
O C
IV
IL
E N
G
IN
E E
R
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
S U
B M
IT
TA
L N
U M
B E
R S
DATE CONTRACTOR
NOTIFIED
C O
N
TR
A C
TO
R
R E
S U
B M
IT
TA
L
FI
N
A L
A P
P R
O V
A L
REMARKS
APPROVED
DIS-
APPROVED
Product Data - Precast concrete structures (Sec. 33 71 02 - 2.12.1.1) 2 2 2 2 2 2 2 2 Prior to Start
Product Data - Manhole frames and covers (Sec. 33 71 02 - 2.12.2) 2 2 2 2 2 2 2 2 Prior to Start
Product Data - Handhole frames and covers (Sec. 33 71 02 - 2.12.3) 2 2 2 2 2 2 2 2 Prior to Start
Product Data - Composite/fiberglass handholes (Sec. 33 71 02 - 2.12.5) 2 2 2 2 2 2 2 2 Prior to Start
Product Data - Cable supports (Sec.
33 71 02 - 2.13) 2 2 2 2 2 2 2 2 Prior to Start
Test Reports - Medium voltage cable qualification and production tests (Sec.
33 71 02 - 2.17.2)
3 3 3 3 3 Prior to Use
Test Reports - Field Acceptance Checks and Tests (Sec. 33 71 02 - 3.17.7)
3 3 3 3 3 Prior to Use
Test Reports - Arc-proofing test (Sec.
33 71 02 - 2.17.1) 3 3 3 3 3 Prior to Use
Test Reports - Cable Installation Plan and Procedure (Sec. 33 71 02 - 3.3)
3 3 3 3 3 Prior to Use
Certificates - Cable splicer/terminator (Sec. 33 71 02 - 1.6.2) 3 3 3 3 At Contract
Closeout
Certificates - Cable Installer Qualifications (Sec. 33 71 02 - 1.6.3) 3 3 3 3 At Contract
Closeout
Pre-Final Inspection Report (Sec. 01 00 00 - 1.28) 2 Prior to Closeout
Final Inspection Report (Sec. 01 00 00 - 1.28) 2 Prior to Closeout
| GHLN 13-000015 Form 66 1 |
| GHLN 13-000015 Form 66 2 |
| GHLN 13-000015 Form 66 3 |
| GHLN 13-000015 Form 66 4 |
| GHLN 13-000015 Form 66 5 |
| GHLN 13-000015 Form 66 6 |
File details come from the government source that posted it. Updated .