Questions and Answers SONET to DWDM Migration 20230802.docx

DOCX document 20 KB Posted

Attached to
Vandenberg SONET to DWDM Migration
Solicitation number
FA461023Q0036
Issued by

About this file

This document contains questions and answers regarding a Solicitation of Offer for a SONET to DWDM migration project for the Department of the Air Force Space Command. The period of performance for the project is 21 months, with the selected contractor expected to provide limited on-site engineering support for practice deployments and the initial migrations. Full-time support is not anticipated throughout the entire period of performance. The Government seeks to conduct the majority of installations independently after an introductory knowledge transfer from the contractor. Required attachments to the Statement of Work providing additional technical details and a draft migration schedule have been updated and replaced.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers SONET to DWDM Migration

1. Question: The SOW states a 21-month period of performance (PoP) and it is intended to account for the current lead times for network equipment delivery. Is it the Government’s intent to use the resource remotely during this time on an as-needed basis and then on-site for actual deployments and practice sessions? The ceiling amount provided in Section M of the RFP would point to this type of arrangement given the equipment requirements. If full time support or a more rigorous engagement is envisioned, a more robust ceiling would be appropriate. Depending on final configuration(s) required, the equipment could be a significant part of the funding requirements.

· Answer: A SOW revision has been posted that provides a preliminary schedule. The resource will not be full time. Once the practice deployments and the first few migrations are successful, the Government will independently continue the migration.

The Government is requesting a face to face introduction at a kick off meeting, on site or remote that will be jointly determined by the contractor and the Government.

1. Question: Can the Government confirm it is the Government’s intent to install/commission the 3926 and 5142 assets organically with limited Ciena support (consulting only) after practice sessions?

· Answer: The Government prefers to maintain accessibility to the support resource during the first few migrations. After that, the Government will install/commission with limited support.

1. Question: How does the Government envision support? Will support be primarily ad-hoc (other than full time remote) to discuss requirements and provide primarily remote support for the requirements in paragraph 2.1 with a “few” site visits during the PoP? Does the Government have a notional time period of actual Ciena Consulting Engineer engagement over the course of the 21 months PoP?

· Answer: Full time support may initially be appropriate but is not expected throughout the Period of Performance. See attachment 3 Schedule SONET to DWDM Migration for the Government’s notational time period of engineering engagement.

1. Question: The SOW refers to Attachment 1 and 2 to the SOW in paragraph 2.1.3 and 2.2, Excel spreadsheets with the draft migration schedule and the equipment and quantities with specific equipment requirements. Can the Government please provide these Attachments? The general nature of the equipment listed in the SOW and the RFP does not provide sufficient information for us to provide a specific equipment solution for each equipment type. We were unable to locate those attachments in the SAM.gov notice.

· Answer: Refer to updated Attachment 1 Statement of objectives and newly incorporated attachment 3 and 4.