Atch 1 SOW SONET 2 DWDM Migration 20230801.pdf
PDF 164 KB Posted
- Attached to
- Vandenberg SONET to DWDM Migration Federal contract opportunity
- Solicitation number
- FA461023Q0036
About this file
This statement of work outlines requirements for consulting engineering support and equipment acquisition to assist Vandenberg Space Force Base with migrating from SONET to DWDM network architecture. The consulting engineer will create template configurations, assist with scenario development and practice deployments, and be available for initial migrations. Equipment from Ciena will add nodes to the existing DWDM network to enable the migration. The period of performance is 21 months from notice to proceed. Deliverables include template configurations, scenario documents, and migration plans. The equipment list specifies Ciena components for compatibility. CLINS cover labor and materials, and all new equipment must include a one-year warranty.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers SONET to DWDM Migration 20230802.docx | DOCX document | |
| Atch 3 Schedule SONET 2 DWDM Migration.xlsx | XLSX spreadsheet | |
| Atch 4 Equipment SONET to DWDM Migration.xlsx | XLSX spreadsheet | |
| FA461023Q00360001 SONET Migration RFQ Amend 1 20230802.pdf | ||
| Atch 2 Brand Name Justification.pdf | ||
| FA461023Q0036 SONET Migratin 20230729.pdf | ||
| Atch 1 Statement of Work SONET Migration.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW
VSFB SONET to DWDM Migration Part 1
STATEMENT OF WORK
(SOW)
Vandenberg SFB, CA
SONET to DWDM Migration
Part 1
1 August 2023
Table of Contents
1. BACKGROUND
2. GENERAL REQUIREMENTS
2.1 Consulting Engineer
2.1.1 Period of Performance
2.1.2 Working Hours
2.1.3 Schedule
2.2 Equipment Acquisition
2.3 CLINS
2.4 Contractor Personnel
3. DELIVERABLES
4. WARRANTY
5. CONTRACT ADMINISTRATION/POINTS OF CONTACT
1. BACKGROUND
Vandenberg Space Force Base (VSFB), CA has installed and expanded a Ciena Dense
Wavelength Division Multiplexing / Optical Transport Network (DWDM/OTN) architecture.
The purpose is to replace the saturated, end-of-life, end-of-support SONET network, an element of the base network infrastructure. VSFB is ready to begin the SONET to DWDM migration.
This statement of work accomplishes two (2) objectives:
a. Engage a Ciena Consulting Engineer to ease the early stages of the migration.
b. Purchase equipment that will add OTNs, or spur nodes, to DWDM that are required to begin the migration.
2. GENERAL REQUIREMENTS
2.1 Consulting Engineer
The Ciena Consulting Engineer, or other Ciena Subject Matter Experts (SME) as appropriate, shall Support the migration through the following tasks:
• Create a VSFB standard or template configuration for the installation of spur nodes consisting of Ciena 3926 and/or 5142 equipment such that the new spur will efficiently operate within the currently deployed DWDM network.
• Given the current VSFB SONET and DWDM environment, consult with the Government toward the selection of the best migration approach and contribute to creation of the migration schedule.
• With the Government, cooperatively define and document up to three (3) scenarios that provide the practice and experience needed by VSFB personnel to productively migrate
SONET to DWDM.
• Be available to coach Government personnel toward the success of each practice deployment.
• Be available for consultation during the first few actual migrations.
• Serve in other ways as suggested by either Ciena or the Government that support the effective and efficient VSFB migration of SONET to the DWDM network.
2.1.1 Period of Performance
The Period of Performance is 21 months from Notice to Proceed (NTP). This PoP is intended to account for the current 65-week (15 month) lead time for network equipment delivery.
2.1.2 Working Hours
When on-base support is appropriate, the Consulting Engineer shall serve during duty hours
(0730-1630) Monday through Friday excluding Federal Holidays.
2.1.3 Schedule
After NTP, the Consulting Engineer and the Government shall meet within 1 month to agree on the approach and schedule that best meets the VSFB SONET to DWDM Migration objectives. See
Attachment 3, a first draft of the Part 1 migration Schedule, Schedule: SONET 2 DWDM Migration
Part 1 v1.xlsx.
2.2 Equipment Acquisition
All equipment that constitutes the elements of the operational VSFB DWDM network are Ciena components. For compatibility, functionality and network management reasons, new nodes must consist of similar Ciena components.
See Attachment 4, Equipment_SONET to DWDM Migration Part 1.xlsx, for the equipment and quantities that are being purchased.
2.3 CLINS
The CLINS are defined as follows:
CLIN 0001 - Labor, Ciena Consulting Engineer, or Subject Matter Expert
CLIN 0002 – Materials Acquisition
2.4 Contractor Personnel
Due to safety and security, all Contractor personnel shall be able to fluently speak, read, and write English.
3. DELIVERABLES
Deliverables shall be provided electronically in either Microsoft Word, Excel, Adobe Acrobat or other format as mutually agreed.
3.1 Template Configurations.
3.2 Practice Deployment Scenarios.
3.3 Documented Migration Approach – jointly created.
3.4 List of Materials Required to Complete a Migration – jointly created.
4. WARRANTY
New equipment shall come with a minimum 1-year full warranty, not prorated, including labor and shipping costs for replacement. The warranty begins upon receipt of the delivered equipment.
5. CONTRACT ADMINISTRATION/POINTS OF CONTACT
Contracting Officer (CO), the term used herein, does not include any representative not acting within the scope of his/her authority. Notwithstanding any of the provisions of this contract, the
CO shall be the only individual authorized to in any way amend or modify the terms of this contract.
CONTRACTING OFFICER (CO):
Robert Bumpass
1515 Iceland Ave
Bldg 8500 Rm 150
Voice COMM 805-606-9081, DSN 276-9081 william.bumpass.1@spaceforce.mil mailto:william.bumpass.1@spaceforce.mil
VSFB PROJECT MANAGER (PM):
Roger Williams
30 SCS/SCXP
Bldg 12000, Ste 118
Vandenberg SFB, CA 93437
Voice: COMM 805-606-7798, DSN 276-7798 roger.williams.30@spaceforce.mil mailto:roger.williams.30@spaceforce.mil
File details come from the government source that posted it. Updated .