15-1224C_RFI01.pdf
PDF 54 KB Posted
- Attached to
- 15-1224C Install Back-Up Generator B1959 Federal contract opportunity
- Solicitation number
- FA461018R0017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 15-1224C_RFI02.pdf | ||
| 15-1224C_18R0017-0003.pdf | ||
| 15-1224C_18R0017_Conformed_through_Amend_0003.pdf | ||
| 15-1124C_18R0017_Amend_0002_SF30.pdf | ||
| 15-1224C_18R0017_Conformed_Through_Amendment_0002.pdf | ||
| 15-1124C_SiteVisit_SignIn(Signed).pdf | ||
| 15-1224C_18R0017_Conformed_Through_Amendment_0001.pdf | ||
| 15-1224C_18R0017-0001.pdf | ||
| 15-1224C_18R0017_Attch1_SOW.pdf | ||
| 15-1224C_18R0017.pdf | ||
| 15-1224C_18R0017__Attch2__Drawings.pdf | ||
| 15-1224C_18R0017_Attch4_Specs.pdf | ||
| 15-1224C_18R0017_Attch3_Environmental_Specs.pdf | ||
| 15-1224C_18R0017_Attch_5_Wage_Determination_20Jul18.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
30TH SPACE WING (AFSPC)
GUARDIANS OF THE HIGHER FRONTIER
Contract No. FA4610-18-R-0017; XUMU 15-1224C, Install Back-Up Generator B1959 – Request for Information (RFI)
1. Question: The drawings call out for a permanent load bank. We are under the understanding the county no longer allows permanent load banks to be installed on generators. Please confirm we are to install a permanent load bank.
Government response: No, replace the load bank with a load bank connection with a circuit breaker. This is an Air Force requirement, not a county requirement.
2. Question: Can the transfer switch be located on the opposite wall?
Government response: Yes.
3. Question: We believe a disconnect may be required between the automatic transfer switch and the main power to the building. Should one be included?
Government response: Yes.
4. Question: The scope of work item 2.2 (4) requires the transfer switch to be stainless steel.
The transfer switch is located indoors. Is stainless steel necessary for an indoor installation?
Government response: No.
5. Question: The same scope of work item 2.2 (4) states the generator, belly tank and sound enclosure is to be stainless steel. Can you clarify which components are to be stainless steel on the generator?
Government response: The enclosure is to be stainless steel. The generator and belly tank are to be contained within the enclosure. See spec section 26 32 15.00 10 for more details on the enclosure.
6. Question: How long can the building be down during the electrical change over? Demolition note number 8 on drawing E-0002 states a temporary generator may be needed, but it does not specify it is required. The note seems to infer a temporary generator may not be necessary. Is temporary power required?
Government response: If the changeover can be accomplished in 2 hours, a temporary generator will not be needed.
7. Question: The same scope of work item 2.2 (4) states the generator, belly tank and sound enclosure is to be stainless steel. Can you clarify which components are to be stainless steel on the generator?
Government response: See answer to question 5.