Attch_6_-_RMDF.pdf

PDF 468 KB Posted

Attached to
Lightning Protection System at Munitions Facilities on Vandenberg AFB, CA Federal contract opportunity
Solicitation number
FA4610-15-R-0004
Issued by
Department of the Air Force Space Command

About this file

Attachment 6 - RMDF

View the file

Other files for this federal contract opportunity

Other files attached to Lightning Protection System at Munitions Facilities on Vandenberg AFB, CA, newest first.
File Type Posted
Attendees.pdf PDF
09-1229_LPS_RFP_Amendment_02.pdf PDF
Questions_and_Answers.pdf PDF
Sign_In.pdf PDF
Meeting_Minutes.pdf PDF
09-1229B_LPS_RFP_Amendment_01.pdf PDF
Attch_4_-_Drawings.pdf PDF
Attch_2_-_Environmental_Specs.doc DOC document
Attch_3_-_DBA_Wage_Determination.docx DOCX document
FA4610-15-R-0004.pdf PDF
Attch_5_-_Specifications.pdf PDF
Attch_1_-_SOW.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GUARDIANS OF THE HIGH FRONTIER

DEPARTMENT OF THE AIR FORCE

30TH SPACE WING (AFSPC)

27 Oct 2015

MEMORANDUM FOR 30 CONS/LGCA

ATTENTION: Jeffrey Grelck

FROM: 30 CES/CEPMD

SUBJECT: Recovered Materials Determination, XUMU-09-1229B LPS at Munitions Facilities

1. In accordance with the sustainable procurement policies, also known as Green Procurement, the Environmental Protection Agency (EPA) web site resources have been researched and products have been incorporated into the government’s Statement of Objectives where they meet the technical requirements of the project and are economically feasible to incorporate. Where possible, Green products listed in the Statement of Objectives are called out by specific manufacturer and model and must be complied with by the contractor unless an alternate product meeting the same standards is proposed by the contractor and approved by the contracting officer. The attached Recovered Materials Determination Form (RMDF) has also been included to identify those EPA “designated products” that will be used in the execution of the project.

2. The Statement of Objectives is a concept approach and is not the final plan. The contractor, in completing the concept approach and prior to submission of his final plan, shall research the applicable EPA web site resources to determine if the products specified in the statement of objectives still meet the technical and economic standards. Where changes are required, the contractor’s final plan shall reflect the changes with adequate justification to support the need to change. In addition to the changes, the contractor shall include any additional Green products that, as a result of his final plan, meet the technical and economic standards and can be incorporated into the project. The attached RMDF shall be utilized as a checklist in developing the final plan and submitting any waivers for use of green products. The checklist shall be completed and submitted to the contracting officer as part of the proposal package submission.

Nicholas Cugini Project Manager

Attch:1 RMDF

CUGINI.NIC

HOLAS.T.1

274303634

Digitally signed by

CUGINI.NICHOLAS.T.1274303

DN: c=US, o=U.S.

Government, ou=DoD, ou=PKI, ou=USAF, cn=CUGINI.NICHOLAS.T.1274 303634 Date: 2014.10.27 17:04:39 -07'00'

FA4610-15-R-0004

Attachment 6

Recovered Materials Determination Form (RMDF) – Instructions

The procurement originator shall complete this checklist when EPA-designated recycled-content products are being procured (except for procurements below the micro purchase threshold). This checklist will help the contractor/vendor with identification of the products to be procured. Information about the products listed below can be found at the EPA website, http://www.epa.gov/cpg/products.htm. This completed checklist shall become part of the contract file.

Procurement Request / Project No: Project XUMU09-1229B LPS at Munitions Facilities

X No materials identified at this time.

The EPA-designated items being procured are:

Construction Products _ _ Building insulation products _ _Carpet (polyester) _ _Carpet cushion _ _Cement and concrete containing:

___Coal fly ash ___Ground granulated blast furnace slag ___Cenospheres or ___Silica fume ___Consolidated and reprocessed latex paint _ __Floor tiles ___Flowable fill ___Laminated paperboard ___Modular threshold ramps _ __Nonpressure pipe ___Patio blocks ___Railroad grade crossing surfaces ___Roofing materials __ _Shower and restroom dividers/partitions ___Structural fiberboard Landscaping Products ___Compost made from yard trimmings or food waste ___Garden and soaker hoses ___Hydraulic mulch ___Lawn and garden edging ___Plastic lumber landscaping timbers and posts

Non-Paper Office Products ___Binders, clipboards, file folders, clip portfolios, and presentation folders ___Office furniture ___Office recycling containers ___Office waste receptacles ___Plastic desktop accessories ___Plastic envelopes ___Plastic trash bags ___Printer ribbons ___Toner cartridges Paper and Paper Products ___Commercial/industrial sanitary tissue products ___ Miscellaneous papers (tray liners) ___Newsprint ___Paperboard and packaging products ___Printing and writing papers Park and Recreation Products ___Park benches and picnic tables ___Plastic fencing ___Playground equipment ___Playground surfaces ___Running tracks

Transportation Products ___Channelizers ___Delineators ___Flexible delineators ___Parking stops ___Traffic barricades ___Traffic cones Vehicular Products ___Engine coolants ___Rebuilt vehicular parts ___Re-refined lubricating oils ___Retread tires Miscellaneous Products ___Awards and plaques ___Bike racks ___Blasting grit ___Industrial drums ___Manual-grade strapping ___Mats ___Pallets ___Signage ___Sorbents

I hereby certify the Statement of Work/Specifications for the requisition of products listed above complies with preference standards for recycled-content materials in force at VAFB.

// Signed// Nicholas Cugini 30CES/CENMP 27 Oct 2014 Procurement Originator Signature Name (Printed) Office Symbol Date