FA4608-17-R-0017
Questions & Answers
13 July 2017
FA4608-17-R-0017 Repair Hangar 1 Doors and Heat
Questions and Answers 37
Q37. SOW requires 2 of the aperture doors be reconfigured for B-52s with different loadings.
Can you be more specific on size and clearances from ground and around aircraft? Sheet A9 give no dimensions.
A37. Dimensions provided will have to be field verified because the door designer will have to provide specific “shop drawings. The rough diameter of the fuselage was measured to be 11.4’.
Measured the top of the fuselage to be 17.5’ off ground.
SANDBLAST Change
Please refer to change to Spec and Drawings (Att 16) regarding Sandblasting that were addressed in Questions Q13, Q14, Q26, Q28, Q29.
The use of “Sand” blasting is removed in the specifications and drawings.
Sandblasting is not the preferred method.
Change:
Bond blasts that use a product which encapsulates the lead during the blasting process. These bond blasts shall use a group of stabilizers designed to convert Pb to a non-hazardous character in the paint-media mix upon media blasting.