Q37_&_Info.pdf

PDF 72 KB Posted

Attached to
Repair Hangar Doors and Heat Federal contract opportunity
Solicitation number
FA460817R0017
Issued by
Department of the Air Force Global Strike Command

About this file

Question 37 and info

View the file

Other files for this federal contract opportunity

Other files attached to Repair Hangar Doors and Heat, newest first.
File Type Posted
Att_16_Changes.pdf PDF
FA4608-17-R-0017_Amd3.pdf PDF
Att_13_-_Subcontractor_Consent_Letter.pdf PDF
Att_14_-_Lead_Paint_Report.pdf PDF
Att_15_-_Asbestos_report.pdf PDF
Orig_Drawings.pdf PDF
Roof_Warranty_Info_.pdf PDF
Questions_4_-36__.pdf PDF
Lead_Paint_Report.pdf PDF
Asbestos_report.pdf PDF
Att_Sheet_SV2_6Jul17.pdf PDF
Questions_and_Answers_.pdf PDF
FA460817R0017_Amd_0002.pdf PDF
Additional_Photos.pdf PDF
Att_Sheet_Preproposal_Site_Visit.pdf PDF
FA460817R0017_Amd__1.pdf PDF
Att_5_Gas_Heat_-_Drawings.pdf PDF
Att_3_Doors_-_Specifications.pdf PDF
Att_2_Doors_-_Electrical_Drawings.pdf PDF
Att_8_-_AF66.pdf PDF
FA4608-17-R-0017.pdf PDF
Photos_Doors.pdf PDF
Att_10_Wage_Determination_LA170034_14_Apr_17.pdf PDF
Att_7_-_Environmental_Req'ts_(Jun_16).pdf PDF
Att_11___-_PPQ_Cover_Letter.pdf PDF
Att_1_Doors_-_Drawings.pdf PDF
Att_9_Insurance_Form.pdf PDF
Att_4_Gas_Heat_-_Specifications.pdf PDF
Att_6_ADDITIONAL_SOW_INFO.pdf PDF
Att_12_-_Past_Performance_Questionnaire.pdf PDF
Att_Sheet_Preproposal_Site_Visit.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4608-17-R-0017

Questions & Answers

13 July 2017

FA4608-17-R-0017 Repair Hangar 1 Doors and Heat

Questions and Answers 37

Q37. SOW requires 2 of the aperture doors be reconfigured for B-52s with different loadings.

Can you be more specific on size and clearances from ground and around aircraft? Sheet A9 give no dimensions.

A37. Dimensions provided will have to be field verified because the door designer will have to provide specific “shop drawings. The rough diameter of the fuselage was measured to be 11.4’.

Measured the top of the fuselage to be 17.5’ off ground.

SANDBLAST Change

Please refer to change to Spec and Drawings (Att 16) regarding Sandblasting that were addressed in Questions Q13, Q14, Q26, Q28, Q29.

The use of “Sand” blasting is removed in the specifications and drawings.

Sandblasting is not the preferred method.

Change:

Bond blasts that use a product which encapsulates the lead during the blasting process. These bond blasts shall use a group of stabilizers designed to convert Pb to a non-hazardous character in the paint-media mix upon media blasting.

File details come from the government source that posted it. Updated .