Att_6_ADDITIONAL_SOW_INFO.pdf

PDF 754 KB Posted

Attached to
Repair Hangar Doors and Heat Federal contract opportunity
Solicitation number
FA460817R0017
Issued by
Department of the Air Force Global Strike Command

About this file

Att 6 Additional SOW info

View the file

Other files for this federal contract opportunity

Other files attached to Repair Hangar Doors and Heat, newest first.
File Type Posted
Q37_&_Info.pdf PDF
Att_16_Changes.pdf PDF
Att_15_-_Asbestos_report.pdf PDF
FA4608-17-R-0017_Amd3.pdf PDF
Att_13_-_Subcontractor_Consent_Letter.pdf PDF
Att_14_-_Lead_Paint_Report.pdf PDF
Roof_Warranty_Info_.pdf PDF
Questions_4_-36__.pdf PDF
Orig_Drawings.pdf PDF
Lead_Paint_Report.pdf PDF
Asbestos_report.pdf PDF
Att_Sheet_SV2_6Jul17.pdf PDF
Questions_and_Answers_.pdf PDF
FA460817R0017_Amd_0002.pdf PDF
Additional_Photos.pdf PDF
Att_Sheet_Preproposal_Site_Visit.pdf PDF
FA460817R0017_Amd__1.pdf PDF
Att_5_Gas_Heat_-_Drawings.pdf PDF
Att_3_Doors_-_Specifications.pdf PDF
Att_12_-_Past_Performance_Questionnaire.pdf PDF
Att_11___-_PPQ_Cover_Letter.pdf PDF
Att_1_Doors_-_Drawings.pdf PDF
Att_9_Insurance_Form.pdf PDF
Att_4_Gas_Heat_-_Specifications.pdf PDF
Att_2_Doors_-_Electrical_Drawings.pdf PDF
Att_8_-_AF66.pdf PDF
FA4608-17-R-0017.pdf PDF
Photos_Doors.pdf PDF
Att_10_Wage_Determination_LA170034_14_Apr_17.pdf PDF
Att_7_-_Environmental_Req'ts_(Jun_16).pdf PDF
Att_Sheet_Preproposal_Site_Visit.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDITIONAL STATEMENT OF WORK INFORMATION

LAY-DOWN AREA TEMPORARY FENCING

1. The Contractor shall furnish all labor, materials, and equipment necessary to provide secure and visually aesthetic temporary fencing for surrounding project equipment and material in lay-down areas.

Work shall include:

a. Clearing area of all encumbrances to safe erection of fencing.

b. Provide fence that is: metal tube frame; metal woven wire mesh (minimum 11 gauge); minimum 6 feet in height.

c. Provide integral to fence visual blocking material, either slat weave or sheet goods.

d. Erecting fence in such manner as to prevent loss of fencing or blocking due to inclement weather.

e. At no time shall fence interfere with fire egress paths or fire equipment ingress, to include periods when gates are in operation.

Contractor shall submit cut sheets on all items for installation, prior to procurement, for approval by the C.E.

Architect. Complete the design as indicated on drawings in accordance with UFC 1-200-01 General Building

Requirements which includes the latest editions of the International Building Code and NFPA Life Safety Code, and

Americans with Disabilities Act. All required work shall be accomplished in accordance with the Barksdale AFB

Design Compatibility Guidelines (DCG). All colors and materials shall be selected by the Civil Engineer Architect in accordance with the DCG. Construction shall be conducted in a quality workmanlike manner. Contractor shall take any steps necessary to protect government and occupant property from damage caused by weather or other occurrence while work is in progress.

2. Upon notification of completion by the contractor a determination will be made as to the satisfactory completion and acceptance of the contract specification(s). Any segment of the operation that is not acceptable because of an unsightly or unprofessional appearance will be justification for rejection of the treatment. The contractor will incur all costs, both labor and materials, for reaccomplishment of any unacceptable work identified.

3. The contractor will be responsible for and incur any and all labor and material costs required to repair any damages to government facilities that occurred during and as result of repair work, replacement operations, or new work, under this contract. This damage will be identified as separate from the condition of the facilities as identified during the initial inspection. The damage will be identified, but not limited, to the following items.

a. Government gas, water and electric transmission and distribution systems

b. Occupant personal property

Additional Information.

a. The contractor will begin work not earlier than 7:30 am each workday. Work will not be performed later than 6:00 pm.

b. Inspections will be conducted by the Contracting Officer and /or Contracting Officer’s Representative and the Contractor’s Manager.

c. Any discrepancies should be noted and forwarded to the Architect.

FA4608-17-R-0017

Attachment 6

BACKGROUND CHECKS FOR CONTRACTOR PERSONNEL REQUIRING ENTRY/ACCESS TO

BARKSDALE AFB (JAN 2005)

Security Forces will conduct a National Crime and Information Center (NCIC) background check on all contractor or subcontractor personnel prior to granting access to the installation.

CONSTRUCTION AND DEMOLITION DEBRIS REPORTS

The following requirement is listed in Attachment 7, Environmental Requirements for Contractors Working on

Barksdale Air Force Base. These reports are required to be submitted on an AF 3000 Material Submittal and should be incorporated into the AF66 Material Submittal Schedule at time of contract award. Final payment will not be released until C&D reports have been submitted and accepted by the Government.

“Construction and Demolition (C&D) debris is generated as a result of construction, renovation, or demolition activities. Although C&D debris is usually considered a single waste stream, the composition actually varies with each activity and the type, size, and location of the structures involved. Disposing of C&D debris in landfills consumes enormous amounts of space and is both economically and environmentally costly. In accordance with AFI 32-7042 and BAFB’s Integrated Solid Waste Management Plan (ISWMP), ALL WEIGHTS OF C&D MATERIALS

RECYCLED AND DISPOSED MUST BE REPORTED TO THE RECYCLE PROGRAM MANAGER.”

CONTRACT COMPLETION INSPECTIONS

The contractor will schedule (preferably with 3 working days notice) a pre-completion inspection to be held approximately 10 calendar days prior to the expiration of the contract. This inspection may result in a "punch list" indicating items to be furnished or work to be completed by the contractor or subcontractors in order to complete the work specified in the contract documents. This list may not be construed to be all inclusive. A copy of the list will be furnished to the contractor within 2 workdays for his use in completing the contractual work. If the pre-completion inspection results in no "punch list" and the work is complete, this inspection may be considered the "final" inspection as determined by the Contracting Officer. If required, the contractor will be responsible for scheduling the contract completion inspection (preferably with 3 working days notice) to be held no later than the final day of contract performance. Should this inspection result in a "punchlist", the contractor will have 10 calendar days (after receipt of punchlist) to complete all punchlist items and notify the Contracting Officer of this. NO FINAL INVOICE SHALL

BE PAID UNTIL ALL PUNCHLIST ITEMS ARE COMPLETED TO THE SATISFACTION OF THE

CONTRACTING OFFICER. Should a contractor exceed the time allowed for these corrections, it may result in negative past performance which could affect future contract awards.

PERFORMANCE INFORMATION

NOTICE TO PROCEED will be issued within 30 calendar days after award of contract. Award date shall be established as the date of mailing or otherwise furnishing a properly executed award document to the successful offeror.

WORK SCHEDULE:

Working hours for the contractor will normally be between the hours of 7:30 a.m. and 6 p.m. excluding Saturdays, Sundays and Federal Holidays (New Year’s Day, Birthday of Martin Luther King, Jr., Presidents Day, Memorial

Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day and Christmas Day). If the contractor desires to work during periods other than above, additional government inspection forces may be required. The contractor must notify the contracting officer three days in advance of his/her intention to work

FA4608-17-R-0017

during other periods to allow assignment of additional inspection forces when the contracting officer determines they are reasonably available. If such force is reasonably available, the contracting officer may authorize the contractor to perform work during periods other than normal duty hours/days, however, if inspections are required to perform in excess of their normal duty hours/days solely for the benefit of the contractor, the actual cost of inspection at overtime rates will be charged to the contractor. These adjustments to the contract price may be made periodically as directed by the contracting officer.

DELIVERY TIME:

Work under both CLINs 0001 (Hangar Doors) and 0002 (Gas Heat) must be done concurrently. Only one (1) NTP will be issued. The contractor will have 270 total calendar days to complete all work.