Att_16_Changes.pdf

PDF 616 KB Posted

Attached to
Repair Hangar Doors and Heat Federal contract opportunity
Solicitation number
FA460817R0017
Issued by
Department of the Air Force Global Strike Command

About this file

Changes in Specs and Drawings

View the file

Other files for this federal contract opportunity

Other files attached to Repair Hangar Doors and Heat, newest first.
File Type Posted
Q37_&_Info.pdf PDF
FA4608-17-R-0017_Amd3.pdf PDF
Att_13_-_Subcontractor_Consent_Letter.pdf PDF
Att_14_-_Lead_Paint_Report.pdf PDF
Att_15_-_Asbestos_report.pdf PDF
Orig_Drawings.pdf PDF
Roof_Warranty_Info_.pdf PDF
Questions_4_-36__.pdf PDF
Lead_Paint_Report.pdf PDF
Asbestos_report.pdf PDF
Att_Sheet_SV2_6Jul17.pdf PDF
Questions_and_Answers_.pdf PDF
FA460817R0017_Amd_0002.pdf PDF
Additional_Photos.pdf PDF
Att_Sheet_Preproposal_Site_Visit.pdf PDF
FA460817R0017_Amd__1.pdf PDF
Att_5_Gas_Heat_-_Drawings.pdf PDF
Att_3_Doors_-_Specifications.pdf PDF
Att_2_Doors_-_Electrical_Drawings.pdf PDF
Att_8_-_AF66.pdf PDF
FA4608-17-R-0017.pdf PDF
Photos_Doors.pdf PDF
Att_10_Wage_Determination_LA170034_14_Apr_17.pdf PDF
Att_7_-_Environmental_Req'ts_(Jun_16).pdf PDF
Att_11___-_PPQ_Cover_Letter.pdf PDF
Att_1_Doors_-_Drawings.pdf PDF
Att_9_Insurance_Form.pdf PDF
Att_4_Gas_Heat_-_Specifications.pdf PDF
Att_6_ADDITIONAL_SOW_INFO.pdf PDF
Att_12_-_Past_Performance_Questionnaire.pdf PDF
Att_Sheet_Preproposal_Site_Visit.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHANGE for “sandblasting”:

The use of “Sand” blasting is removed in the specifications and drawings.

Sandblasting is not the preferred method.

Change:

Bond blasts that use a product which encapsulates the lead during the blasting process. These bond blasts shall use a group of stabilizers designed to convert Pb to a non-hazardous character in the paint-media mix upon media blasting.

Revisions to Attachment 1 Doors - Drawings:

Sheet A6 of 13A –

PROJECT SCOPE OF WORK

Current:

Item 1. REMOVE WESTERNMOST DOORS ON NORTH AND SOUTH WALLS. EACH

SET OF DOORS TO BECOME 3:4:3 CONFIGURATION. ELIMINATED DOORS TO

REMAIN PROPERTY OF BARKSDALE AIR FORCE BASE.

Change:

Item 1. REMOVE WESTERNMOST DOORS ON NORTH AND SOUTH WALLS. EACH

SET OF DOORS TO BECOME 3:4:3 CONFIGURATION. CONTRACTOR WILL REMOVE

AND DISPOSE OF DOORS

Revisions to Attachment 3 Doors –Specifications:

Current:

PART 1 – GENERAL

1.2 PROJECT/WORK INDENTIFICATION

I. Completion Date: As required by Instructions to Bidders, the Contractor is required to fully complete construction of project within 240 calendar days

Change:

I. Completion Date: As required by Instructions to Bidders, the Contractor is required to fully complete construction of project within 270 calendar days

FA4608-17-R-0017

Attachment 16

Revisions to Attachment 4 Gas Heat - Specifications:

Current:

PART 3 – EXECUTION 3.1 F Vent Connections: Comply with Section 15550 “Breechings, Chimneys, and Stacks.”

Change:

PART 3 – EXECUTION 3.1 F Vent Connections: Comply with manufacturer’s installation instructions and 2012 International Mechanical Code.

FA4608-17-R-0017

Attachment 16