Att_8_-_AF66.pdf

PDF 2 MB Posted

Attached to
Repair Hangar Doors and Heat Federal contract opportunity
Solicitation number
FA460817R0017
Issued by
Department of the Air Force Global Strike Command

About this file

Att 8 AF 66

View the file

Other files for this federal contract opportunity

Other files attached to Repair Hangar Doors and Heat, newest first.
File Type Posted
Q37_&_Info.pdf PDF
Att_16_Changes.pdf PDF
FA4608-17-R-0017_Amd3.pdf PDF
Att_13_-_Subcontractor_Consent_Letter.pdf PDF
Att_14_-_Lead_Paint_Report.pdf PDF
Att_15_-_Asbestos_report.pdf PDF
Roof_Warranty_Info_.pdf PDF
Questions_4_-36__.pdf PDF
Orig_Drawings.pdf PDF
Lead_Paint_Report.pdf PDF
Asbestos_report.pdf PDF
Att_Sheet_SV2_6Jul17.pdf PDF
Questions_and_Answers_.pdf PDF
FA460817R0017_Amd_0002.pdf PDF
Additional_Photos.pdf PDF
Att_Sheet_Preproposal_Site_Visit.pdf PDF
FA460817R0017_Amd__1.pdf PDF
Att_5_Gas_Heat_-_Drawings.pdf PDF
Att_3_Doors_-_Specifications.pdf PDF
Att_11___-_PPQ_Cover_Letter.pdf PDF
Att_1_Doors_-_Drawings.pdf PDF
Att_9_Insurance_Form.pdf PDF
Att_4_Gas_Heat_-_Specifications.pdf PDF
Att_6_ADDITIONAL_SOW_INFO.pdf PDF
Att_2_Doors_-_Electrical_Drawings.pdf PDF
FA4608-17-R-0017.pdf PDF
Photos_Doors.pdf PDF
Att_10_Wage_Determination_LA170034_14_Apr_17.pdf PDF
Att_7_-_Environmental_Req'ts_(Jun_16).pdf PDF
Att_12_-_Past_Performance_Questionnaire.pdf PDF
Att_Sheet_Preproposal_Site_Visit.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

INSTRUCTIONS FOR COMPLETION OF SCHEDULE OF MATERIAL SUBMITTAL

(a) These instructions apply for construction contracts as required by the Contracting Officer.

(b) The following schedule of material submittals shall be initiated by the contractor to schedule the required submission date for each submittal. It is the responsibility of the contractor to schedule these due dates so that work will progress according to schedule. The Government requires at least (10) working days to evaluate and approve/disapprove a submittal. Additional review time may be expected for complex submittals, so the contractor shall plan accordingly.

(c) Upon award of a contract, the contractor shall complete the columns, starting with line number and ending with required submission date, of the Schedule of Material Submittals (AF Form 66). It is the responsibility of the contractor to extract all required submittals from the specification and enter them on the AF Form 66. Failure to list the submittal will not relieve the contractor from submission of required, data. Four (4) copies of this completed form shall be delivered to the Pre-construction Conference. The following abbreviations shall be used when scheduling submitta1 due dates:

DANTP - Days After Notice To Proceed

DAT - Days After Test

DPTC - Days Prior To Completion

AS - As Specified

If any other abbreviations are used, they must be defined at the bottom of each page of the submittal register.

(d) If contractor uses products exactly as specified in the contract specifications, no submittal (AF Form 3000) is required, and the required submission date column on the AF Form 66, shall be annotated with the symbol “AS.”

The Government reserves the right to request a submittal that the contractor has annotated "AS" if it is a complex or a special order item. This request will usually be made at the Pre-construction Conference when the contractor provides the submittal register.

(e) It is the contractor’s responsibility to use products as specified. Any deviations from the specified requirements must have Government approval prior to use. The contractor will be held responsible for any corrections required to comply with Government specifications.

FA4608-17-R-0017

Attachment 8

FA4608-17-R-0017

Attachment 8

File details come from the government source that posted it. Updated .