TITLE 1B
SPECIFICATIONS
REPAIR HANGAR DOORS, B6604
BARKSDALE AFB, LOUISIANA
AWUB 15-0091
PROJECT ASSOCIATES:
CIVIL ENGINEERS
S. E. HUEY CO.
1111 N. 19TH ST.
MONROE, LA 71201
(318) 325-1791 www.sehuey.com
MECHANICAL/ELECTRICAL ENGINEERS
JOHN J. GUTH ASSOCIATES
208 MILAM ST.
SHREVEPORT, LA 71101
(318) 221-8638
FA4608-17-R-0017
Attachment 3
REPAIR HANGAR DOORS, B6604
BARKSDALE AFB
AWUB 15-0091
TABLE OF CONTENTS
Specifications:
Summary of Work
Cutting and Patching
Definitions and Standards
Project Meetings
Submittals
Submittal Register
Temporary Facilities
Material and Equipment
Project Closeout
Cleaning
Selective Demolition
Drainage Pipe CCTV Inspection
Cast-in-Place Concrete
Structural Steel Framing
Metal Fabrications
Building Insulation
Formed Metal Liner Panels
Steel Sliding Hangar Doors
Insulated Translucent Fiberglass Sandwich Panels
Painting
Basic Electrical Materials and Methods
Grounding and Bonding
Raceways & Boxes
Wiring Devices
Interior Lighting
FA4608-17-R-0017
01010-1
AWUB 15-0091
SECTION 01010 - SUMMARY OF THE WORK
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to work of this Section.
1.2 PROJECT/WORK IDENTIFICATION
A. General: Project name is "REPAIR HANGAR DOORS FAC #6604 – AWUB 15-0091" as shown on Contract Documents prepared by S. E. Huey Co. and John J. Guth Associates, Inc.
Drawings and Specifications.
B. Summary by References: Work of the Contract can be summarized by references to the
Contract, General Conditions, Supplementary Conditions, Specification Sections, Drawings, addenda and modifications to the Contract Documents issued as part of addenda subsequent to the initial printing of this project manual and including, but not necessarily limited to, printed material referenced by any of these. It is recognized that work of the Contract is also unavoidably affected or influenced by governing regulations, natural phenomenon, including weather conditions, and other forces outside the Contract Documents.
C. Abbreviated Written Summary: Briefly and without force and effect upon the contract documents, the work of the Contract can be summarized as follows:
1. Refurbishment of all existing hangar doors in building 6604 (Hangar One) at Barksdale Air Force Base. Cleaning of all storm drain lines in building also included.
D. Utility Interruptions: Utility interruptions shall be held to a minimum and will be permitted only at times approved by the User Agency. The User Agency may require that any outages be during nights, weekends, or holidays. Provide any required overtime work at no additional cost to the Owner.
E. Shop Drawings
1. Contractor shall provide detailed AutoCAD shop drawings of all project work incorporating this statement of work and requirements of other project contract documents. Contractor shall provide thorough field investigation required for preparing the shop drawings.
2. Shop drawings which shall include detailed demolition and new work plans, hangar door and aperture repair plans, hangar door and aperture electrical plan and schematics, door and aperture operating control plans, schedules for motors, gearboxes, powertrain components, etc.
and details of architectural, civil, structural, related to door repair project work.
3. Contractor shall not perform any construction work until all final shop drawings submittals are approved; submit per section 01400 and this section.
FA4608-17-R-0017
01010-2
F. The Contractor shall be responsible for the printing costs for the reprinting of construction documents for their use.
G. The Contractor shall be responsible for meeting all applicable OSHA standards, including the Hazard Communication Standards.
H. Superintendent: Contractor is responsible for providing a full-time on-site superintendent for this project.
I. Completion Date: As required by Instructions to Bidders, the Contractor is required to fully complete construction of project within 240 calendar days. Contractor shall furnish sufficient forces, construction plant and equipment, and work such hours, including weekend and night shifts as may be necessary to insure prosecution of work in accordance with schedule to the contracted completion date. If, in the opinion of the Contracting Officer’s Representative and Owner, Contractor falls behind progress schedule, Contractor shall take steps as may be necessary to improve his progress by such means as increasing number of men, number of shifts, days of work, and/or amount of construction plant, all without additional cost to Owner.
If access to building is required at other than normal building hours, Contractor shall make arrangements with User Agency.
1.3 CONTRACTOR USE OF PREMISES
A. General: The Contractor shall limit his use of the premises to the work indicated, so as to allow for Owner occupancy with minimum interruptions. All access to building will require an escort, and therefore require making arrangements with user agency.
B. Use of the Site: Confine operations at the site to the areas permitted under the Contract.
Portions of the site beyond areas on which work is indicated are not to be disturbed.
Conform to site rules and regulations affecting the work while engaged in project construction.
C. Keep existing driveways and entrances serving the premises clear and available to the Owner and his employees at all times. Do not use these areas for parking or storage of materials.
D. Do not unreasonably encumber the site with materials or equipment. Confine stockpiling of materials and location of storage sheds to the areas approved by User Agency. If additional storage is necessary, obtain and pay for such storage off-site. The Owner will not make payments for materials stored off-site.
E. Lock automotive type vehicles, such as passenger cars and trucks and other mechanized or motorized construction equipment, when parked and unattended, so as to prevent unauthorized use. Do not leave such vehicles or equipment unattended with the motor running or the ignition key in place.
F. Use of existing toilets within the buildings by the Contractor and his personnel will not be permitted.
G. General Requirements: Observe no smoking rules. All personnel must wear shirts. No radios or similar items may be used.
FA4608-17-R-0017
01010-3
H. Asbestos: There is no asbestos abatement work included in this project. No asbestos-containing materials have been identified on items that are indicated to be disturbed.
If asbestos-containing materials are encountered, please notify the Contracting Officer’s Representative immediately.
1.4 OWNER OCCUPANCY
A. Full Owner Occupancy: The Owner will occupy the site during the entire period of construction. Cooperate fully with the Owner and his representative during construction operations to minimize conflicts and to facilitate Owner usage. Perform the work so as not to interfere with the Owner's operations. All access to building will require an escort, and therefore require making arrangements with user agency.
PART 2 - PRODUCTS (Not applicable)
PART 3 - EXECUTION (Not applicable)
END OF SECTION 01010
01045-1
SECTION 01045 - CUTTING AND PATCHING
A. Drawings and general provisions of Contract, including other Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section specifies administrative and procedural requirements for cutting and patching.
B. Refer to other Sections for specific requirements and limitations applicable to cutting and patching individual parts of the work.
1. Requirements of this Section apply to civil, structural, and architectural installations.
Refer to Divisions 2, 3, 5, 6, 7, and 8 Sections for other requirements and limitations applicable to cutting and patching mechanical and electrical installations.
1.3 SUBMITTALS
A. Cutting and Patching Proposal: Where approval of procedures for cutting and patching is required before proceeding, submit a proposal describing procedures well in advance of the time cutting and patching will be performed and request approval to proceed. Include the following information, as applicable, in the proposal:
1. Describe the extent of cutting and patching required and how it is to be performed;
indicate why it cannot be avoided.
2. Describe anticipated results in terms of changes to existing construction; include changes to structural elements and operating components as well as changes in the building's appearance and other significant visual elements.
3. List products to be used and firms or entities that will perform work.
4. Indicate dates when cutting and patching is to be performed.
5. List utilities that will be disturbed or affected, including those that will be relocated and those that will be temporarily out-of-service. Indicate how long service will be disrupted.
6. Where cutting and patching involves addition of reinforcement to structural elements, submit details and engineering calculations to show how reinforcement is integrated with the original structure.
7. Approval by the Contracting Officer’s Representative to proceed with cutting and patching does not waive the Contracting Officer Representative's right to later require complete removal and replacement of a part of the work found to be unsatisfactory.
01045-2
1.4 QUALITY ASSURANCE
A. Requirements for Structural Work: Do not cut and patch structural elements in a manner that would reduce their load-carrying capacity or load-deflection ratio.
1. Foundation construction.
2. Bearing and retaining wall.
3. Structural concrete.
4. Structural steel.
5. Lintels.
6. Timber and primary wood framing.
7. Structural decking.
8. Stair systems.
9. Miscellaneous structural metals.
10. Exterior curtain wall construction.
11. Equipment supports.
12. Piping, ductwork, vessels and equipment.
13. Structural systems of special construction in Division 11.
B. Operational and Safety Limitations: Do not cut and patch operating elements or safety related components in a manner that would result in reducing their capacity to perform as intended, or result in increased maintenance, or decreased operational life or safety.
1. Obtain approval of the cutting and patching proposal before cutting and patching the following operating elements or safety related systems:
a. Shoring, bracing, and sheeting.
b. Primary operational systems and equipment.
c. Air or smoke barriers.
d. Water, moisture, or vapor barriers.
e. Membranes and flashings.
f. Fire protection systems.
g. Noise and vibration control elements and systems.
h. Control systems.
i. Communication systems.
j. Conveying systems.
k. Electrical wiring systems.
l. Special construction specified by Division 13 Sections.
C. Visual Requirements: Do not cut and patch construction exposed on the exterior or in occupied spaces, in a manner that would, in the Engineer's opinion, reduce the building's aesthetic qualities, or result in visual evidence of cutting and patching. Remove and replace work cut and patched in a visually unsatisfactory manner.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Use materials that are identical to existing materials. If identical materials are not available or cannot be used where exposed surfaces are involved, use materials that match existing adjacent
FA4608-17-R-0017
01045-3 surfaces to the fullest extent possible with regard to visual effect. Use materials whose installed performance will equal or surpass that of existing materials.
PART 3 - EXECUTION
3.1 INSPECTION
A. Before cutting existing surfaces, examine surfaces to be cut and patched and conditions under which cutting and patching is to be performed. Take corrective action before proceeding, if unsafe or unsatisfactory conditions are encountered.
1. Before proceeding, meet at the site with parties involved in cutting and patching, including mechanical and electrical trades. Review areas of potential interference and conflict. Coordinate procedures and resolve potential conflicts before proceeding.
3.2 PREPARATION
A. Temporary Support: Provide temporary support of work to be cut.
B. Protection: Protect existing construction during cutting and patching to prevent damage.
Provide protection from adverse weather conditions for portions of the project that might be exposed during cutting and patching operations.
C. Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.
D. Take all precautions necessary to avoid cutting existing pipe, conduit or ductwork serving the building, but scheduled to be removed or relocated until provisions have been made to bypass them.
3.3 PERFORMANCE
A. General: Employ skilled workmen to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time and complete without delay.
1. Cut existing construction to provide for installation of other components or performance of other construction activities and the subsequent fitting and patching required to restore surfaces to their original condition.
B. Cutting: Cut existing construction using methods least likely to damage elements to be retained or adjoining construction. Where possible review proposed procedures with the original installer; comply with the original installer's recommendations.
1. In general, where cutting is required use hand or small power tools designed for sawing or grinding, not hammering and chopping. Cut holes and slots neatly to size required with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.
FA4608-17-R-0017
01045-4
2. Cut through concrete and masonry using a cutting machine such as a carborundum saw or diamond core drill.
3. Comply with requirements of applicable Sections of Division 16 where cutting and patching requires excavating and backfilling.
4. By-pass utility services such as pipe or conduit, before cutting, where services are shown or required to be removed, relocated or abandoned. Cut-off pipe or conduit in walls or partitions to be removed. Cap, valve or plug and seal the remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after by-passing and cutting.
C. Patching: Patch with durable seams that are as invisible as possible. Comply with specified tolerances.
1. Where feasible, inspect and test patched areas to demonstrate integrity of the installation.
2. Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing.
3.4 CLEANING
A. Thoroughly clean areas and spaces where cutting and patching is performed or used as access.
Remove completely excess material, paint, mortar, oils, putty and items of similar nature.
END OF SECTION 01045
01090-1
SECTION 01090 - DEFINITIONS AND STANDARDS
A. Drawings and general provisions of Contract, including other Division 1 Specification sections, apply to work of this Section.
1.2 DESCRIPTION OF REQUIREMENTS
A. General: This section specifies procedural and administrative requirements for compliance with governing regulations and codes and standards imposed upon the work.
These requirements include obtaining permits, licenses, inspections, releases, and similar documentation, as well as payments, statements, and similar requirements associated with regulations, codes, and standards.
B. The term "Regulations" is defined to include laws, statutes, ordinances, and lawful orders issued by governing authorities, as well as those rules, conventions, and agreements within the construction industry which effectively control the performance of the work regardless of whether they are lawfully imposed by governing authority or not.
1.3 DEFINITIONS
A. General Explanation: Certain terms used in Contract Documents are defined in this Article.
Definitions and explanations contained in this Section are not necessarily complete, but are general for the work to extent that they are not stated more explicitly in another element of the Contract Documents.
B. General Requirements: Provisions and requirements of other Division 1 Sections apply to the entire work of the Contract and, where so indicated, to other elements which are included in the project.
C. Indicated: The term "indicated" is a cross-reference to graphic representations, notes, or Schedules on the Drawings, to other paragraphs or schedules in the Specifications, and to similar means of recording requirements in Contract Documents. Where terms such as "shown," "noted," "scheduled," and "specified" are used in lieu of "indicated," it is for the purpose of helping the reader locate the cross-reference, and no limitation of location is intended except as specifically noted.
D. Directed, Requested, Etc.: Terms such as "directed," "requested," "authorized," "selected," "approved," "required," "accepted," and "permitted" mean "directed by the Contracting officer’s representative," "requested by the Contracting officer’s representative," and similar phrases. However, no such implied meaning will be interpreted to extend the Contracting officer’s representative's responsibility into the Contractor's area of construction supervision.
E. Approve: Where used in conjunction with the Contracting officer’s representative's response to submittals, requests, applications, inquiries, reports, and claims by the Contractor, the term
FA4608-17-R-0017
01090-2
"approved" will be held to limitations of the Contracting officer’s representative's responsibilities and duties. In no case will the Contracting officer’s representative's approval be interpreted as a release of the Contractor from responsibilities to fulfill requirements of Contract Documents or acceptance of the work, unless otherwise provided by requirements of the Contract Documents.
F. Project Site: The term "project site" means the space available to the Contractor for performance of the work, either exclusively or in conjunction with others performing other construction as part of the project. The extent of the project site is shown on the Drawings, and may or may not be identical with the description of the land upon which the project is to be built.
G. Furnish: The term "furnish" is used to mean "supply and deliver to the project site, ready for unloading, unpacking, assembly, installation, and similar operations."
H. Install: The term "install" is used to describe operations at project site including the actual "unloading, unpacking, assembly, erection, placing, anchoring, applying, working to dimensions, finishing, curing, protecting, cleaning, and similar operations."
I. Provide: The term "provide" means "to furnish and install, complete and ready for the intended use."
J. Installer: The "installer" is "the entity" (person or firm) engaged by the Contractor, its subcontractor, or sub-subcontractor for performance of a particular element of construction at the project site, including installation, erection, application, and similar required operations.
It is a requirement that installers are experienced in the operations they are engaged to perform.
K. Testing Laboratory: A "testing laboratory" is an independent entity engaged to perform specific inspections or tests of the work, either at the project site or elsewhere, and to report and (if required) interpret results of those inspections or tests.
1.4 INDUSTRY STANDARDS
A. Applicability of Standards: Except where more explicit or stringent requirements are written into the Contract Documents, applicable construction standards have the same force and effect as if bound into or copied directly into the contract documents. Such industry standards are made a part of the Contract Documents by reference. Individual specification sections indicate which codes and standards the Contractor must keep available at the project site for reference.
B. Referenced standards (standards referenced directly in the contract documents) take precedence over standards that are not referenced but generally recognized in the industry for applicability to the work.
C. Unreferenced Standards: Except as otherwise limited by the Contract Documents, standards not referenced but recognized in the construction industry as having direct applicability will be enforced for performance of the work. The decision as to whether an industry code or standard is applicable, or as to which of several standards are applicable, is the sole responsibility of the Contracting officer’s representative.
D. Publication Dates: Except as otherwise indicated, where compliance with an industry standard is required, comply with standard in effect as of date of Contract Documents.
FA4608-17-R-0017
01090-3
E. Conflicting Requirements: Where compliance with two or more standards is specified, and where these standards establish different or conflicting requirements for minimum quantities or quality levels, the most stringent requirement will be enforced, unless the contract documents specifically indicate otherwise. Refer requirements that are different, but apparently equal, and uncertainties as to which quality level is more stringent to the Contracting officer’s representative for a decision before proceeding.
F. Minimum Quantities or Quality Levels: In every instance, the quantity or quality level shown or specified is intended to be the minimum to be provided or performed. Unless otherwise indicated, the actual work may either comply exactly, within specified tolerances, with the minimum quantity or quality specified, or may exceed that minimum within reasonable limits.
In complying with these requirements, the indicated numeric values are minimum or maximum values, as noted, or as appropriate for the context of the requirements. Refer instances of uncertainty to the Contracting officer’s representative for decision before proceeding.
G. Copies of Standards: The contract documents require that each entity performing work be experienced in that part of the work being performed. Each entity is also required to be familiar with industry standards applicable to that part of the work. Copies of applicable standards are not bound with the contract documents.
H. Where copies of standards are needed for proper performance of the work, the Contractor is required to obtain such copies directly from the publication source.
I. Although copies of standards needed for enforcement of requirements may be required submittals, the Contracting officer’s representative reserves the right to require the Contractor to submit additional copies as necessary for enforcement of requirements.
J. Abbreviations and Names: Trade association names and titles of general standards are frequently abbreviated. Where acronyms or abbreviations are used in Specifications or other Contract Documents they are defined to mean the recognized name of the trade association, standards generating organization, governing authority or other entity applicable to the context of the text provision. Refer to the "Encyclopedia of Associations," published by Gale Research Co., available in most libraries.
1.5 SUBMITTALS
A. Permits, Licenses, and Certifications: For the Owner's records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, and similar documents, correspondence and records established in conjunction with compliance with standards and regulations bearing upon performance of the work.
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION (NOT APPLICABLE)
END OF SECTION 01090
FA4608-17-R-0017
01200-1
SECTION 01200 - PROJECT MEETINGS
A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to work of this Section.
1.2 RELATED SECTIONS
A. Construction Schedule: Division 1 Section 01400, "Submittals."
1.3 PROGRESS MEETINGS
A. No regularly-scheduled progress meetings will occur during the construction period. Meetings will only be scheduled as necessary to address questions or problems related to the construction.
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION (NOT APPLICABLE)
END OF SECTION 01200
01400-1
SECTION 01400 - SUBMITTALS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of Contract, including other Division 1 Specification Sections, apply to work of this Section.
1.2 RELATED WORK SPECIFIED ELSEWHERE
A. Closeout Submittals: Division 1 Section 01700, "Project Closeout."
1.3 CONSTRUCTION SCHEDULE
A. General: Contractor shall, within ten days after signing the Contract, prepare and submit to Contracting Officer’s Representative for information purposes, a practical schedule showing order in which Contractor proposes to carry on work, dates on which he will start salient features of work, and contemplated dates for completion. Schedule shall meet or better construction time included in Contract Documents.
B. Form of Schedule: Provide in form of horizontal bar chart. Provide separate horizontal bar column for each trade or operation. Order shall be Table of Contents from Project Manual or the chronological order of beginning of each item of work. Submit three copies to Contracting Officer’s Representative.
C. Content of Schedule: Provide complete sequence of construction activity, dates for beginning, and completion of each element of construction. Identify work of separate phases or other logically grouped activities. Show projected percentage of completion for each item of work as of first day of each month.
1.4 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES
A. Shop Drawings:
1. Submit prints of original drawings prepared by Contractor, subcontractor, supplier, or distributor which illustrate same portion of work; showing fabrication, layout setting, or erection details.
2. For extensive modifications, prints may be returned to Contractor for correction. When reviewed, Contracting Officer’s Representative will retain two copies for record and return remaining copies to General Contractor for distribution. Reproducible copies of shop drawings will not be reviewed.
B. Product Data:
1. Manufacturer's Standard Drawings: Modify drawings to delete information which is not applicable to project. Supplement standard information to provide additional information applicable to project.
FA4608-17-R-0017
01400-2
2. Manufacturer's Catalog Sheet, Brochures, Diagrams: Clearly mark each copy to identify pertinent materials, product, or models. Show dimensions and clearances required.
Show performance characteristics and capacities.
C. Samples:
1. Physical examples to illustrate materials, equipment, or workmanship to establish standards by which completed work is judged.
2. Office samples shall be of sufficient size and quantity to clearly illustrate functional characteristics of product or material and full range of color and texture samples.
D. General Submission Requirements:
1. Quantities: Submit the number of copies of product data and shop drawings that the Contractor requires for distribution, plus two copies which will be retained by the Contracting Officer’s Representative. Quantity of samples required shall be as specified in Specification Section for respective product.
E. Submittals shall include:
1. Project title.
2. Names of Contractor, Subcontractor, Supplier, Manufacturer.
3. Identification of Product.
4. Relation to adjacent structure or materials.
5. Field dimensions.
6. Reference to Engineer's drawing numbers, specification section, room numbers, structural framing marks, and/or numbers.
7. Applicable standards: e.g., ASTM.
8. Blank space for Engineer's stamp.
9. Identification of deviations from Contract Documents.
10. Contractor's stamp, initialed or signed, certifying to review of submittal, verification of field measurements, and compliance with Contract Documents.
F. Return and Disapproval of Submittals:
This is a routine project. The Contracting Officer will return submittals made with AF Form 3000 to the Contractor within 14 days after receipt, using the AF Form 3000 to show approval or disapproval. Resubmit revisions of disapproved submittals within 14 days after receipt of disapproval, again using AF Form 3000. Disapproval shall not be cause for a time extension.
G. Submittal Register: Contractor is to use and adhere to Submittal Register provided at the end of this Section.
1.5 SCHEDULE OF VALUES
A. General: Submit to Owner a Schedule of Values at least ten days prior to submitting first Application for Payment. Upon request by Owner, support values with data that will substantiate their correctness. Use Schedule of Values only as basis for Contractor's Application for Payment. Itemize separate line item cost for work required by each section of this specification.
FA4608-17-R-0017
01400-3
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION (NOT APPLICABLE)
END OF SECTION 01400
FA4608-17-R-0017
FA4600-11-B-0025
1B-1
SCHEDULE OF MATERIAL SUBMITTALS
BARKSDALE AFB
PROJECT NO.
UHHZ159000
APPROVED DISAPPROVED
1 Shop Drawings Submittal 4 NTP + 30
2 Equipment Material Submittals 4 NTP + 21
3 Equipment Manufacturer's catalog cut sheets 4 NTP + 21
Other Material Submittals See applicable spec sections for all mat. submittals (constr.) 4 NTP + 21
6 Corrected Final shop drawings Submittal 4 NTP + 40
7 AF2519 Welding and Safety Checklist 4 NTP + 21
8 Contractor's Kickoff Meeting Checklist 4 At Kick-off Meeting
9 Work Plan 4 NTP + 21
10 Solid Waste Disposal Plan 4 NTP + 21
11 Storage and Trailer Request 4 NTP + 21
12 Time Schedule 4 NTP + 21
14 AF Form 3064 & 3065 2 NTP + 21
15 List of Proposed Subcontractors 1 NTP + 21
16 Superintendent & Certified Formen 1 NTP + 21
17 Systems Functional Test Report 4 7 Days prior to Pre-Final Insp.
18 Request for Final Inspection 1 7 Days prior to Pre-Final Insp.
19 Operations and Maintenance Manuals 4 Prior to Closeout
20 As-built Drawings (for each project) 4 Prior to
Closeout
21 Warranties 1 Prior to
Closeout
22 Construction List of Material Submittals 1 Prior to Closeout
C A
TA
LO
G D
A
TA
LI
N
E N
U M
B E
R
S A
M P
LE
S
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E A
N D
C
LO
S
E O
U T
C
LO
S E
O U
T
O P
E R
A
TI
G
IN
S
TR
U C
TI
O
N
S DATE
TO
CIVIL
ENGR.
S H
O P
D R
A W
IN
G
S
FOLLOW-UPREQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACTIN
G
O
TH
E R
M A
TE
R
IA
L
O R
A
TA
C O
LO
R
S E
LE
C
TI
O
N
M A
N U
FA
C
TU
R
E
'S
E
C O
M M
E N
D A
TI
O
N S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE
OF SUBMITTAL
RETURN
SUSPENSE
DATE
DATE CONTRACTOR NOTIFIED
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
BEFORE CONSTR AFTER CONSTR
M A
N U
FA
C
TU
R
E
W
R R
A N
TY
SOLICITATION/CONTRACT NO.PROJECT TITLE
RPR/ RPL HVAC system, B/221 FA8501-XXXX
SCHEDULE OF MATERIAL SUBMITTALS
BARKSDALE AFB
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
FA4608-17-R-0017
FA4600-11-B-0025
1B-2
SCHEDULE OF MATERIAL SUBMITTALS
BARKSDALE AFB
PROJECT NO.
UHHZ159000
APPROVED DISAPPROVEDC
A
TA
LO
G D
A
TA
LI
N
E N
U M
B E
R
S A
M P
LE
S
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E A
C
LO
S
E O
U T
C
LO
S E
O U
T
O P
E R
A
TI
G
IN
S
TR
U C
TI
O
N
S DATE
TO
CIVIL
ENGR.
S H
O P
D R
A W
IN
G
S
FOLLOW-UPREQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACTIN
G
O
TH
E R
M A
TE
R
IA
L
O
TA
C O
LO
R
S E
LE
C
TI
O
N
M A
N U
FA
C
TU
R
E
E
C O
M M
E N
D A
TI
O
N S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE
OF SUBMITTAL
RETURN
SUSPENSE
DATE
DATE CONTRACTOR NOTIFIED
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
BEFORE CONSTR AFTER CONSTR
M A
N U
FA
C
TU
R
E
W
R R
A N
TY
SOLICITATION/CONTRACT NO.PROJECT TITLE
RPR/ RPL HVAC system, B/221 FA8501-XXXX
SCHEDULE OF MATERIAL SUBMITTALS
BARKSDALE AFB
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.
LEGEND:
D-NTP = Design NTP, C-NTP = Construction NTP
FA4608-17-R-0017
01500-1
SECTION 01500 - TEMPORARY FACILITIES
A. Drawings and general provisions of the Contract, including other Division 1 Specification Sections, apply to the work of this Section.
1.2 BARRICADES AND LIGHTS
A. Where the work is constructed in or adjacent to any road, parking area, or public place, the Contractor shall, at his own cost and expense, furnish and erect such barricades, lights, and danger signals, and take such other precautionary measures for the protection of persons and property and of the work, as are necessary. At the completion of construction, all barricades and all traces thereof, shall be removed, holes filled, paving repaired, etc.
1.3 TEMPORARY LADDERS, SCAFFOLDS, HOISTS, ETC.
A. Contractor shall provide and maintain all equipment such as temporary ladders, ramps, scaffolds, hoists, runways, derricks, chutes, etc., as required for the proper execution of the work.
B. All such apparatus, equipment, and construction shall meet all requirements of the Labor Law and other Federal and State Laws applicable thereto.
C. Contractor shall provide, maintain, and remove at completion of work all scaffolding required for the execution of the work. Erect scaffolding on the side of the wall on which work occurs.
No scaffolding shall be built into any work.
D. Scaffolding for all other work shall be provided, installed, maintained, and removed at completion of work by the trade requiring such scaffolding.
1.4 STORAGE OF MATERIALS
A. The contractor shall submit a written request with a drawing showing the proposed laydown area for approval through 2 CES leadership.
B. Contractor shall provide, on the premises where directed, suitable storage sheds (substantial and watertight) in which he shall store all materials subject to damage by weather.
All storage sheds shall be of sufficient size to hold all materials required on the site at one time, and shall have floors raised at least 6" above the ground on heavy joists or sleepers.
Storage sheds shall have neat appearance.
C. Major subcontractors shall provide such temporary buildings as, in the opinion of the
Contracting Officer’s Representative, may be necessary to fully protect their materials, FA4608-17-R-0017
01500-2 equipment, apparatus, etc., during the progress of the work. Such buildings shall have neat appearance.
D. Building materials, Contractor's equipment, etc., shall be stored on the premises in a manner so that it may be observed at any time by the Contracting Officer’s Representative.
E. All materials affected by the weather shall be covered and protected and kept free from damage while being transported to the site.
F. Subcontractors desiring to store materials scheduled for immediate use in the building may do so only in locations as directed by the General Contractor and approved by the Contracting Officer’s Representative.
1.5 SANITARY FACILITIES
A. Provide single-occupant, self-contained toilet units of the chemical, aerated recirculation, or combustion type, properly vented and fully enclosed with a glass fiber reinforced polyester shell or similar non-absorbent material. Contractor shall keep such place in sanitary condition and remove at completion of contract. Facility fixtures shall not be used by workmen.
Comply with all applicable codes, utility, and safety regulations.
1.6 LAYING-OUT OF WORK
A. Contractor shall compare all drawings and verify all dimensions, and shall take any and all measurements necessary to verify the drawing dimensions in relation to conditions already established at the job site before laying out the work. Contractor will be held responsible for subsequent errors which could have been avoided by such checking.
B. Any discrepancy which will affect the proper layout of the work shall be immediately called to the attention of the Contracting Officer’s Representative by the Contractor. No work shall proceed until such discrepancy has been rectified as directed by the Contracting Officer’s Representative.
END OF SECTION 01500
01600-1
SECTION 01600 - MATERIAL AND EQUIPMENT
A. The general provisions of the Contract apply to the work specified in this Section. Refer to other Division 1 Sections for additional requirements which may affect the work of this Section.
1.2 RELATED REQUIREMENTS
1.3 GENERAL PRODUCT REQUIREMENTS
A. Provide products, materials, and equipment which comply with the requirements and which are undamaged and unused at the time of installation, and which are complete with accessories, trim, finish, safety guards, and other devices and details needed for a complete installation and for the intended use and effect. Do not use material or equipment for any purpose other than that for which it is designed or specified.
1.4 MANUFACTURER'S INSTRUCTIONS
A. When Contract Documents require that installation of work shall comply with manufacturer's printed instructions, obtain and distribute copies of such instructions to parties involved in the installation, including two copies to Contracting Officer’s Representative. Maintain one set of complete instructions at the job site during installation and until completion.
B. Handle, install, connect, clean, condition, and adjust product in strict accord with such instructions and in conformity with specified requirements. Should job conditions or specified requirements conflict with manufacturer's instructions, consult with Contracting Officer’s Representative for further instructions. Do not proceed with work without clear instructions.
C. Perform work in accord with manufacturer's instructions. Do not omit any preparatory step or installation procedure unless specifically modified or exempted by Contract Documents.
1.5 TRANSPORTATION AND HANDLING
A. Arrange deliveries of products in accord with construction schedules, coordinate to avoid conflict with work and conditions at the site. Deliver products in undamaged condition, in manufacturer's original containers or packaging, with identifying labels intact and legible.
Immediately on delivery, inspect shipments to assure compliance with requirements of Contract Documents and approved submittals, and that products are properly protected and undamaged.
B. Provide equipment and personnel to handle products by method to prevent soiling or damage to products or packaging.
FA4608-17-R-0017
01600-2
1.6 STORAGE AND PROTECTION
A. Store products in accord with manufacturer's instructions, with seals and labels intact and legible. Store products subject to damage by the elements in weathertight enclosures.
Maintain temperature and humidity within the ranges required by manufacturer's instructions.
Provide fence with obscuring fabric to encircle all site-stored material.
B. Exterior Storage: Store fabricated products above the ground, on blocking or skids, prevent soiling or staining. Cover products which are subject to deterioration with impervious sheet coverings, provide adequate ventilation to avoid condensation. Store loose granular materials in a well-drained area on solid surfaces to prevent mixing with foreign matter.
C. Arrange storage in a manner to provide easy access for inspection. Make periodic inspections of stored products to assure that products are maintained under specified conditions, and free from damage or deterioration.
D. Protection After Installation: Provide substantial coverings as necessary to protect installed products from damage from traffic and subsequent construction operations. Remove when no longer needed.
END OF SECTION 01600
01700-1
SECTION 01700 - PROJECT CLOSEOUT
A. Drawings and general provisions of Contract, including other Division 1 Specification Sections, apply to work of this Section.
1.2 DESCRIPTION OF REQUIREMENTS
A. Definitions: Project closeout is the term used to describe certain collective project requirements, indicating completion of the work that is to be fulfilled near the end of the contract time in preparation for final acceptance and occupancy of the work by the Owner, as well as final payment to the Contractor and the normal termination of the Contract.
B. Specific requirements for individual units of work are included in the appropriate Sections in
Division 2 through 16.
1.3 CLOSEOUT SUBMITTALS
A. Submit to Contracting Officer’s Representative for review, four copies each of the following items and other items as specified. Approved copies will be transmitted to Owner by Contracting Officer’s Representative.
B. Operation and Maintenance Data: Refer to Article titled "Operation and Maintenance
Manuals" hereinafter this Section.
C. Record Drawings: Refer to "Record Drawings" article hereinafter this section (one copy required).
D. Release of Liens.
E. Consent of Surety to Final Payment.
1.4 OPERATION AND MAINTENANCE MANUALS
A. Purpose: Operation and maintenance manuals will be used for training of, and use by, the Owner and his employees in the operation and maintenance of the systems and related equipment as specified below. A separate manual or chapter shall be prepared for instructions of each class of equipment or system.
B. Contents: Manuals shall contain the following information on each item of equipment:
1. Routine maintenance operations.
2. Complete operating instructions.
FA4608-17-R-0017
01700-2
3. Service instructions.
4. Complete control wiring.
5. Emergency procedure.
6. Equipment warranties or guarantees.
C. Preparation: The manuals shall be prepared to provide for the optimum operation and maintenance of the various systems outlined above and equipment forming a part of these systems. Manufacturer's literature and data shall be that of the actual equipment installed under contract for the particular facility. Each manual containing the systems noted shall be bound in one or more volumes as required for convenience in handling. In addition to "hard" (paper) copy manuals, provide "electronic files" on CD or DVD in Microsoft® Office or Adobe Acrobat.
D. Quantity: Provide 3 sets of O&M Manuals in D-type, 3 ring binders.
1.5 INSTRUCTIONS
A. Instruct Owner's personnel in operation of all systems, mechanical, electrical, and other equipment in accordance with respective Specification Sections and manufacturer's instructions.
1.6 RECORD DRAWINGS
A. Mark-Up Procedure: During progress of work, maintain a white-print set of Contract Drawings and shop drawings, with mark-up of actual installations which vary substantially from the work as originally shown. Mark whatever drawing is most capable of showing actual physical condition, fully and accurately. Where shop drawings are marked up, cross-reference on contract drawings at corresponding location. Mark with erasable colored pencil, using separate colors where feasible to distinguish between changes for different categories of work at same general location. Mark-up important additional information which was either shown schematically or omitted from original drawings. Give particular attention to information on work concealed, which would be difficult to identify or measure and record at a later date.
Note alternate numbers, change order numbers, and similar identification.
B. Submittal: Contractor shall provide as-builts to incorporate all mark-ups to include: one full size hardcopy set on paper; one CD-ROM disk with all drawings sheets in PDF and AutoCAD v2012 (v2009 is acceptable) format. CAD drawings shall have “Bind” command run such that each sheet can stand alone without references or attachments
1.7 CLEANING UP
A. No rubbish shall be allowed to accumulate or be allowed to remain on the premises or job site beyond a reasonable length of time. Trash shall be removed from within the building and from the site daily. Particular attention shall be given to these requirements.
B. All rubbish shall be removed by means of chutes, hoists, or receptacles. Under no circumstances shall any rubbish or waste be dropped or thrown from one level to another within or outside the buildings. Immediately after unpacking materials, all packing case lumber and
FA4608-17-R-0017
01700-3 other packing materials, excelsior, wrappings, and other like flammable wastes shall be collected and removed from the buildings and premises. Burning of trash on the site will not be permitted.
C. Care shall be taken by all workmen not to mark, soil, or otherwise deface any finishes. In the event that any finishes become defaced in any way by mechanics or workmen, the Contractor or any of his sub-contractors shall clean and restore such surfaces to their original condition.
D. Each subcontractor engaged upon the work shall bear his full responsibility for leaving all work in a clean and proper condition, satisfactory to the Owner and the Contracting Officer’s Representative.
E. Final Cleaning: Beside the general broom cleaning, the following cleaning shall be done just before final acceptance of the work:
1. Remove all labels not intended for permanent installation.
2. Remove all marks, stains, fingerprints, and other soil or dirt from all painted work, and clean as required to leave in first class condition.
3. Clean all equipment removing all stains, paint, dirt, and dust.
F. Upon completion of the work, the Contractor will be required to thoroughly clean the building site and surrounding ground, and all trash and rubbish left by him in the course of construction of the work shall be removed and disposed of off the site of work.
G. Contractor shall haul off all debris from the site to legal disposal areas and dispose of all debris and excess materials resulting from project work. No burning of material or debris shall be done at site. In hauling material from the site, it shall be the responsibility of the Contractor to prevent debris from dropping from vehicles and littering the site and any public thoroughfare.
1.8 FINAL INSPECTION
A. Contractor shall submit written certification that:
1. Contract Documents have been reviewed.
2. Project has been inspected for compliance with Contract Documents.
3. Work has been completed in accordance with Contract Documents.
4. Equipment and systems have been tested in presence of Owner's Representative and are operational.
5. Project is completed, and ready for final inspection.
B. Contracting Officer’s Representative will make final inspection after receipt of certification.
C. Should Contracting Officer’s Representative consider that work is not finally complete, he will notify the Contracting Officer, in writing, stating reasons.
1.9 FINAL PAYMENT
A. Application for final payment shall be submitted together with documents specified in Section
1.3 of this specification.
01700-4
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
END OF SECTION 01700
01710-1
SECTION 01710 - CLEANING
1.1 DESCRIPTION
A. Work included: Throughout the construction period, maintain the buildings and site in a standard of cleanliness as described in this Section.
B. Related Work:
1. Documents affecting work of this section include, but are not necessarily limited to, Sections in Division 1 of these Specifications.
2. In addition to standards described in this Section, comply with requirements for cleaning as described in pertinent other Sections of these Specifications.
1.2 QUALITY ASSURANCE
A. Conduct daily inspection, and more often if necessary, to verify that requirements for cleanliness are being met.
PART 2 - PRODUCTS
2.1 COMPATIBILITY
A. Use only the cleaning materials and equipment which are compatible with the surface being cleaned, as recommended by the manufacturer of the material.
3.1 PROGRESS CLEANING
A. General:
1. Retain stored items in an orderly arrangement allowing maximum access, not impeding traffic or drainage, and providing required protection of materials.
2. Do not allow accumulation of scrap, debris, waste material, and other items not required for construction of this Work.
3. At least twice each month completely remove all scrap, debris, and waste material from the site.
B. Site:
1. Daily, and more often if necessary, inspect the site and pick up all scrap, debris, and waste material. Weekly, and more often if necessary, inspect all arrangements of materials, FA4608-17-R-0017
01710-2 restock if necessary.
C. Structures:
1. Weekly and more often in necessary, inspect the structures and remove all scrap, debris, and waste material.
2. Weekly, and more often if necessary, sweep interior spaces clean.
3. Following the installation of finished floor materials, clean the finish floor daily at all times while work is being performed.
4. Clean all surfaces, interior and exterior, and maintain a reasonably clean structure at all times.
END OF SECTION 01710
01732-1
SECTION 01732 - SELECTIVE DEMOLITION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including other Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following:
1. Demolition and removal of selected portions of a building or structure.
2. Repair procedures for selective demolition operations.
B. Related Sections include the following:
1. Division 1 Section 01010, "Summary of Work," for use of the premises and phasing requirements.
2. Division 1 Section 01500, "Temporary Facilities," for temporary construction and environmental-protection measures for selective demolition operations.
3. Division 1 Section 01045, "Cutting and Patching," for cutting and patching procedures for selective demolition operations.
1.3 DEFINITIONS
A. Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.
B. Remove and Salvage: Detach items from existing construction and deliver them to Owner.
C. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and reinstall them where indicated.
D. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.
1.4 MATERIALS OWNERSHIP
A. Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain Owner's property, demolished materials shall become Contractor's property and shall be removed from Project site.
FA4608-17-R-0017
01732-2
1.5 QUALITY ASSURANCE
A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.
B. Standards: Comply with ANSI A10.6 and NFPA 241.
1.6 PROJECT CONDITIONS
A. Owner will occupy portions of building immediately adjacent to selective demolition area.
Conduct selective demolition so Owner's operations will not…