Attachment 7 Performance Requirements.pdf
PDF 26 KB Posted
- Attached to
- IDC Base Pavements Federal contract opportunity
- Solicitation number
- FA4497-11-R-0003
About this file
Attachment 7 Performance Requirments
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 4 Operational Climatic Data.pdf | ||
| Attachment 5 Mean Number Days Precipitation Trace to .5 inches.pdf | ||
| Attachment 1 Wage Determination General Decision DE100014.pdf | ||
| Attachment 2 Specs 139 pages.pdf | ||
| Attachment 8 Past and Present Performance Questionaire.pdf | ||
| Attachment 6 Mandatory Verification Schedule.pdf | ||
| Attachment 3 Material Approval Submittals.pdf | ||
| Attachment 9 SampleQuestionnaire Cover Letter.pdf | ||
| IDC Base Pavements 9June2011.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO:FA4497-11-R-0013
CONTRACT NO:
Attachment 7
PERFORMANCE REQUIREMENTS
PROJECT NUMBER: 111098
1. Work requests will be issued individually. The Contractor must request acceptance by the Government upon completion.
2. The Contractor shall have a maximum of ten (10) calendar days to mobilize upon receipt of the first work request that will include time for approval of material submittals. Any time during the contract period where there is an interruption of work for more than two days, the Contractor will be authorized two (2) additional working days for remobilization. In the event the Contractor is issued a work request after he has completed all work from a previous work request and departed the job site, an additional ten (10) working days shall be added to such work request for remobilization.
3. In addition to the times referenced in Paragraph 2, the Contractor shall be allotted performance times for each work request based upon the dollar amount of the work request as indicated below, from the date the work requests are issued.
TOTAL ALLOWABLE PERFORMANCE
AMOUNT OF WORK REQUEST
TIME IN CALENDAR DAYS
a. Up to $10,000 20
b. $10,001 to $20,000 25
c. $20,001 to $40,000 30
d. $40,001 to $60,000 35
e. $60,001 to $80,000 40
f. $80,001 to $100,000 50
g. $100,001 to $120,000 59
h. Greater than $120,000 Negotiated