Attachment 6 Mandatory Verification Schedule.pdf
PDF 14 KB Posted
- Attached to
- IDC Base Pavements Federal contract opportunity
- Solicitation number
- FA4497-11-R-0003
About this file
Attachment 6 Mandatory Verification Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 8 Past and Present Performance Questionaire.pdf | ||
| Attachment 4 Operational Climatic Data.pdf | ||
| Attachment 5 Mean Number Days Precipitation Trace to .5 inches.pdf | ||
| Attachment 1 Wage Determination General Decision DE100014.pdf | ||
| Attachment 2 Specs 139 pages.pdf | ||
| Attachment 3 Material Approval Submittals.pdf | ||
| Attachment 9 SampleQuestionnaire Cover Letter.pdf | ||
| Attachment 7 Performance Requirements.pdf | ||
| IDC Base Pavements 9June2011.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO:FA4497-11-R-0013
CONTRACT NO:
Attachment 6
MANDATORY VERIFICATION SCHEDULE
PROJECT NUMBER: 111098
The work listed herein requires mandatory verification by the Government Inspector before any follow-on work is allowed to start. The Contractor must provide evidence of verification by the individual designated as responsible for the Contractor's inspection program, that the work to be verified by the Government complies with these specifications and drawings. The Contractor shall notify the Government Inspector that the work is ready for verification at least four hours prior to the desired verification date unless indicated otherwise below.
WORK SPECIFICATION OR NOTIFICATION DATE SCHEDULED INSPECTION
DESCRIPTION DRAWING REFERENCE REQUIRED FOR INSPECTION
COMPLETED
Removal of Existing Pavements 02110/1.2 24 hours
Borrow 02610/1.2 24 hours
Graded Aggregate 02600/1.2 24 hours Base Course
Open Graded Aggregate 02600/1.3 24 hours Base Course
Concrete Structures 02622/1.2 48 hours
Cracking and 03200/1.4 24 hours Seating of Nonreinforced Portland Cement Concrete
Hot-Mix, Hot-Laid 03000/1.3.1 48 hours Bituminous Concrete Pavement
Bituminous Tack Coat 03000/1.4 24 hours
Coal-Tar 03060/1.4.1 48 hours Sealer/Rejuvenator
SOLICITATION NO:FA4497-11-R-0013
CONTRACT NO:
Attachment 6
WORK SPECIFICATION OR NOTIFICATION DATE SCHEDULED INSPECTION
DESCRIPTION DRAWING REFERENCE REQUIRED FOR INSPECTION
COMPLETED
Pipe Bollards 03500/1.3 48 hours
Pavement Markings 02900/3.0 48 hours