Question_and_Answer_2.pdf

PDF 12 KB Posted

Attached to
Grounds Maintenance Federal contract opportunity
Solicitation number
FA4484-13-R-0003
Issued by
Department of the Air Force Air Mobility Command

About this file

Question and Answer 2 19 February 2013

View the file

Other files for this federal contract opportunity

Other files attached to Grounds Maintenance, newest first.
File Type Posted
TE-1.pdf PDF
Solicitation_FA4484-13-R-0003_amend_4.pdf PDF
TE-4.pdf PDF
GROUNDS_MAINTENANCE_(AF)_PWS_(JOINT_BASE)_REV_5__21_FEB_13.pdf PDF
Solicitation_FA4484-13-R-0003_amend_3.pdf PDF
Question_and_Answer_1.pdf PDF
Solicitation_FA4484-13-R-0003_Conformed_Copy.pdf PDF
Solicitation_FA4484-13-R-0003_amend_2.pdf PDF
GROUNDS_MAINTENANCE_(AF)_PWS_(JOINT_BASE)_REV_4__8_FEB_13.pdf PDF
Question_and_Answer.pdf PDF
Site_Visit_FA4484-13-R-0003.pdf PDF
FA4484-13-R-0003-0001.pdf PDF
TE-6.ppt PPT presentation
TE-12.pptx PPTX presentation
TE-14.pdf PDF
TE4.doc DOC document
TE-8.pdf PDF
Past_Perf_Questionnaire.doc DOC document
TE-10.pdf PDF
TE-5.pdf PDF
TE-9.pdf PDF
TE-3.pptx PPTX presentation
Executive_summary_sheet.pdf PDF
Past_Pef_Cover_Letter.pdf PDF
TE-1.pdf PDF
GROUNDS_MAINTENANCE_(AF)_PWS_(JOINT_BASE)_REV_3__7_DEC_12.pdf PDF
Burlington_County_Wage_Determination_Rev_12_-_13_Jun_2012.pdf PDF
TE-2.pptx PPTX presentation
GROUNDS_MAINTENANCE_(AF)_QASP_(JOINT_BASE)_REV_2__14_AUG_12.pdf PDF
Solicitation_FA4484-13-R-0003.pdf PDF
Ocean_County__WAGE_DETERMINATIONS_6-2012.pdf PDF
TE-7.pdf PDF
TE-11.pdf PDF
TE-13.doc DOC document
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JB MDL Grounds Maintenance Solicitation

FA4484-13-R-0003

Questions and Answers 2

19 February 2013

1. Question: With regards to pricing Appendix K, some of the planting will require accounting for labor at Laborer and Heavy Equipment Operator Wage Determination rates. For example, there is a very significant hourly rate difference between Heavy Equipment Operator rates for the two Wage Determination areas. We are requesting that the Government provide two versions of Appendix K to reflect both Wage Determination areas and rates?

Answer: The offeror can submit separate appendix K for each wage determination if they wish but will need to identify which wage determination it is covering.

2. Question: Pertaining to the above solicitation for grounds maintenance at M-D-L, the revised Amendment 0002, CLIN 0002FA, McGuire Fertilization states 4 Each. Are you requesting that we price the 862 acres x 4 = 3,448 acres of Improved Turf @ McGuire be fertilized or a total of 862 acres to fertilize via 4 job orders? There is a huge price difference between fertilizing 862 acres versus 3,448 acres. Please clarify as this was a new change in the

CLINs.

Answer: The results of the soil testing, which is conducted 4 times a year, is the driver if pH adjustments and fertilizer applications are required in improved areas. The offeror will need to use their knowledge and experience of regional soil conditions to determine if pH adjustments and fertilizer are warranted and to what extent.

3. Question: Can we use the Offerors Representations and Certifications that we filled out on the original SF1449, or are we required to submit the Offerors Representations and

Certifications as contained within the Conformed (latest) version of the SF1449 published under

Amendment 002?

Answer: Need to use the conformed copy.

File details come from the government source that posted it. Updated .