Construct HAZMAT Load-Unload Facility, B.2190 Addendum No. 2 JBC No. DKFX 1051228 March 1, 2023
SECTION 31 31 16.19
TERMITE CONTROL BARRIERS
08/22
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Written Warranty ; G
SD-08 Manufacturer's Instructions ; G
SD-11 Closeout Submittals
Written Warranty ; G
1.2 DELIVERY, STORAGE, AND HANDLING
1.3 SITE CONDITIONS
1.3.1 Environmental Requirements
In addition to the manufacturer's installation instructions and before placing material, ensure project site is free from standing water.
1.4 WARRANTY
Furnish a 5-year written warranty against infestations or reinfestation by subterranean termites of the buildings or building additions constructed under this contract. Written warranty must be jointly signed by an officer of the Contractor and the supplier. Perform annual inspections of the building or building addition. If live subterranean termite infestation or subterranean termite damage is discovered during the warranty period, and building conditions have not been altered in the interim, take the following actions:
a. Correct defective installation and perform other treatment as may be necessary to eliminate subterranean termite infestation.
b. Repair damage caused by termite infestation.
c. Reinspect the building approximately 180 calendar days after the repair.
SECTION 31 31 16.19 Page 1
Construct HAZMAT Load-Unload Facility, B.2190 Addendum No. 2 JBC No. DKFX 1051228 March 1, 2023
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
2.2 MATERIALS
PART 3 EXECUTION
3.1 PREPARATION
Provide finished or temporary site grading to remove standing water from the project site (i.e., excavated areas or adjacent areas). Grading must provide positive drainage towards temporary, new or existing drainage features. Grading must not result in low spots that hold water or direct water towards new or existing facilities.
3.2 INSTALLATION
-- End of Section --