Construct HAZMAT Load-Unload Facility, B.2190 Addendum No. 2 JBC No. DKFX 1051228 March 1, 2023
SECTION 03 45 00
PRECAST ARCHITECTURAL CONCRETE
05/ 16, CHG 2: 11/ 21
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 211.1 (1991; R 2009) Standard Practice for Selecting Proportions for Normal, Heavyweight and Mass Concrete
ACI 214R (2011) Evaluation of Strength Test Results of Concrete
ACI 301 (2016) Specifications for Structural Concrete
ACI SP-66 (2004) ACI Detailing Manual
ASTM INTERNATIONAL (ASTM)
ASTM C31/C31M (2022) Standard Practice for Making and Curing Concrete Test Specimens in the Field
ASTM C33/C33M (2018) Standard Specification for Concrete Aggregates
ASTM C39/C39M (2021) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
ASTM C78/C78M (2022) Standard Test Method for Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading)
ASTM C150/C150M (2022) Standard Specification for Portland Cement
ASTM C311/C311M (2022) Standard Test Methods for Sampling and Testing Fly Ash or Natural Pozzolans for Use in Portland-Cement Concrete
ASTM C618 (2022) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete
ASTM C1107/C1107M (2020) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)
ASTM C1218/C1218M (2020c) Standard Test Method for
SECTION 03 45 00 Page 1
Water-Soluble Chloride in Mortar and Concrete
ASTM C1602/C1602M (2022) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete
ASTM D5759 (2012; R 2020) Characterization of Coal Fly Ash and Clean Coal Combustion Fly Ash for Potential Uses
PRECAST/PRESTRESSED CONCRETE INSTITUTE (PCI)
PCI MNL-117 (2013) Manual for Quality Control for Plants and Production of Architectural Precast Concrete Products, 3rd Edition
PCI MNL-122 (2007) Architectural Precast Concrete, 3rd Edition
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Precast Drawings ; G
SD-05 Design Data
Contractor-Furnished Mix Design ; G
SD-06 Test Reports
Strength Tests ; G
SD-07 Certificates
Manufacturer's Qualifications ; G
SD-08 Manufacturer's Instructions
Cleaning ; G
1.3 MODIFICATION OF REFERENCES
In the referenced ACI and PCI publications, consider the advisory provisions to be mandatory. Interpret reference to the "Building Official," the "Structural Engineer," and the "Architect/Engineer" to mean the Contracting Officer.
1.4 GENERAL REQUIREMENTS
Precast concrete units must be designed and fabricated by an experienced and certified precast concrete manufacturer. The manufacturer needs to have been regularly and continuously engaged in the manufacture of precast
SECTION 03 45 00 Page 2 concrete work similar to that indicated on the drawings for at least 3 years. The Contractor must submit a statement detailing the Manufacturer's Qualifications . Coordinate precast work with the work of other trades.
1.5 DELIVERY, STORAGE, AND HANDLING
Deliver packaged materials, except for wall panels, to the project site in the original, unbroken packages or containers, each bearing a label clearly identifying manufacturer's name, brand name, weight or volume, and other pertinent information. Store packaged materials, and materials in containers, in a weathertight and dry place until ready for use.
Store products in manufacturer's unopened packaging in dry storage area, with ambient temperature between 30 degrees F and 120 degrees F , until installation.
1.6 STORAGE AND INSPECTION AT MANUFACTURER'S PLANT
Protect precast units temporarily stored at the manufacturer's plant from damage in accordance with PCI MNL-117 and PCI MNL-122 . Immediately prior to shipment to the jobsite, all precast concrete units must be inspected for quality to insure all precast units conform to the requirements specified. Inspection for quality will include, but will not be limited to, the following elements: color, texture, dimensional tolerances, chipping, cracking, staining, warping and honeycombing. Replace or repair all defective precast concrete units as approved.
1.7 CONCRETE SAMPLING AND TESTING
1.7.1 Quality Control Testing During Fabrication
Sample and test concrete for quality control during fabrication as follows:
Compression test specimens may be either standard 6 by 12 inch cylinders or 4-inch cubes.
Curing of compression test specimens must be the same as the curing method used for the precast concrete shapes .
REQUIREMENT TEST METHOD
SECTION 03 45 00 Page 3
Compressive strength tests
ASTM C39/C39M
Evaluate compression test results at 28 days in accordance with ACI 214R using a coefficient of variation of 20 percent. Evaluate the strength of concrete by averaging the test results (two specimens) of standard cylinders tested at 28 days. Not more than 20 percent of the individual tests can have an average compressive strength less than the specified ultimate compressive strength. Submit test reports on the same day that tests are made.
Reports for Compressive Strength tests need to contain the project name and number, date of concrete placement, name of Contractor, name of precast concrete manufacturer, name of concrete testing service, use of concrete mixture (facing or backing), design compressive strength at 28 calendar days, concrete-mix proportions and materials, and compressive breaking strength and type of break.
1.8 QUALITY ASSURANCE
1.8.1 Precast Drawings
Submit precast drawings with the following information:
a. Precast dimensions, cross-section, and edge details; location, size, and type of reinforcement, including reinforcement necessary for safe handling and erection of precast units and other embedded items.
Comply with ACI SP-66 .
b. Layout, dimensions, and identification of each precast unit, corresponding to installation sequence.
c. Setting drawings, instructions, and directions for installation of concrete inserts.
d. Location and details of anchorage devices and lifting devices embedded in panels, and connection details to building framing system.
1.9 TOLERANCES
Dimensions of the finished panel, at the time of erection in the structure, must conform to the tolerances for precast, non-prestressed elements in PCI MNL-117 , unless otherwise specified by the Architect.
SECTION 03 45 00 Page 4
PART 2 PRODUCTS
2.1 CONCRETE
2.1.1 Contractor-Furnished Mix Design
ACI 211.1 and ACI 301 . The Contractor must submit the mix design report giving the maximum nominal coarse aggregate size, the proportions of all ingredients and the type and amount of any admixtures that will be used in the manufacture of each strength and type of concrete, a minimum of sixty days prior to commencing operations. Provide mix proportion data using at least three different water-cementitious material ratios for each type of mixture, which produce a range of strength encompassing those required for each type of concrete required. Plot a curve for each concrete mixture, showing the relationships between water-cementitious material ratios and compressive strengths. Maximum permissible water-cementitious material ratio must be that value not exceeding the maximum water-cementitious material ratio specified, indicated by the curve to produce a design minimum laboratory compressive strength at 28 calendar days not less than that specified. The mix design report is to contain the project name and number, date, name of Contractor, name of precast concrete wall panel manufacturer, name of concrete testing service, use of concrete mixture (facing or backing), source of concrete aggregates for each mixture.
Submit certified copies of laboratory test reports, including mill tests and all other test data, for portland cement, blended cement, pozzolan, ground granulated blast furnace slag, silica fume, and aggregates. The statement must be accompanied by test results from an approved testing laboratory, certifying that the proportions selected will produce concrete of the properties required. Make no substitutions without additional tests to verify that the concrete properties are satisfactory. Concrete must have a 28-day compressive strength of 4000 psi .
If, the compressive strength falls below that specified, adjust the mix proportions and water content and make necessary changes in the temperature, moisture, and curing procedures to secure the specified strength. Notify the Contracting Officer of all changes.
2.1.2 Backing Mixture
Provide the approved mix design.
2.2 MATERIALS
2.2.1 Fine Aggregates
ASTM C33/C33M. The optional method of reducing the No. 50 and No. 100 sieve aggregates does not apply. The restriction to use only fine aggregates that do not contain any materials that are deleteriously reactive with alkalis in cement does apply.
2.2.2 Cementitious Materials
For exposed concrete, use one manufacturer and one source for each type of cement, ground slag, fly ash, and pozzolan.
2.2.2.1 Fly Ash
ASTM C618, Class F, except that the maximum allowable loss on ignition must not exceed 3 percent.
SECTION 03 45 00 Page 5
Add with cement. Fly ash content must be a minimum of 15 percent by weight of cementitious material, provided the fly ash does not reduce the amount of cement in the concrete mix below the minimum requirements of local building codes. Where the use of fly ash cannot meet the minimum level, provide the maximum amount of fly ash permittable that meets the code requirements for cement content. Report the chemical analysis of the fly ash in accordance with ASTM C311/C311M. Evaluate and classify fly ash in accordance with ASTM D5759.
2.2.2.2 Portland Cement
Provide cement that conforms to ASTM C150/C150M, Type I, with tri-calcium aluminates (C3A) content less than 10 percent and a maximum cement-alkali content of 0.80 percent Na2Oe (sodium oxide) equivalent. Use one brand and type of cement for formed concrete having exposed-to-view finished surfaces.
2.2.3 Water
Water must comply with the requirements of ASTM C1602/C1602M . Minimize the amount of water in the mix. Improve workability by adjusting the grading rather than by adding water. Water must be potable; free from injurious amounts of oils, acids, alkalis, salts, organic materials, or other substances deleterious to concrete. Submit test report showing water complies with ASTM C1602/C1602M .
2.2.4 Form Release Agent
Release agent must be manufacturer's standard non-staining type.
2.2.5 Grout
Packaged, nonmetallic, noncorrosive, nonstaining grout containing selected silica sands, portland cement, shrinkage-compensating agents, plasticizing and water-reducing agents, complying with ASTM C1107/C1107M and of consistency suitable for application within a 30-minute working time.
Water-soluble chloride ion content less than 0.06 percent by weight of cement when tested according to ASTM C1218/C1218M .
PART 3 EXECUTION
3.1 PREPARATION
Deliver anchorage devices to the site in time to be installed before the start of concrete placing or during steel erection. Contractor must provide setting drawings, instructions, and directions for the installation of anchorage devices.
3.2 EXAMINATION
Do not begin installation until supporting structures have been properly prepared.
Verify that all parts of the supporting structure are complete and ready to receive the precast units and that site conditions are conducive to proper installation.
If support structure is the responsibility of another installer, notify Contracting Officer of unsatisfactory preparation before proceeding.
SECTION 03 45 00 Page 6
3.3 INSTALLATION
Install precast concrete units and accessories in accordance with approve detail drawings and descriptive data, and as specified below.
3.3.1 Concrete Strength at Time of Precast Unit Installation
Do not install precast units until concrete has attained the minimum laboratory compressive strength at 28 calendar days specified.
Do not install precast units before 28 calendar days from the date of casting unless approval has been obtained to make one compressive strength test, ASTM C39/C39M, and one flexural strength test using simple beam with third-point loading, ASTM C78/C78M, on field cured concrete test specimens, ASTM C31/C31M, for each individual precast unit to determine the strength of the concrete.
3.3.2 Joints
Joint widths between precast units will be as specified unless otherwise indicated.
3.3.2.1 Joint Sealing
Joint sealing will be as specified in Section 07 92 00 JOINT SEALANTS.
3.3.3 Protection
Protect exposed-to-view facing from staining and other damage from subsequent operations. Do not allow laitance to penetrate, stain, or harden on exposed surfaces.
3.4 DEFECTIVE WORK
Repair precast concrete units damaged during erection as soon after occurrence as possible or replaced, as directed, using approved procedures. All repairs to precast concrete units must match the adjacent surfaces in color and texture, as approved. Unless otherwise approved, repair procedures will conform to PCI MNL-117 .
3.5 INSPECTION AND ACCEPTANCE PROVISIONS
3.5.1 Dimensional Tolerances
Precast units having dimensions outside the limits for fabrication tolerances will be rejected.
3.5.2 Surface Finish Requirements
Precast units will be rejected for the following surface finish deficiencies:
a. Exposed-to-view surfaces that do not match the color, aggregate size and distribution, and texture of the approved sample
b. Exposed-to-view surfaces that contain defects that affect the appearance of the finish, such as cracks, spalls, honeycomb, rock pockets, or stains and discoloration of aggregate or matrix that
SECTION 03 45 00 Page 7 cannot be removed by cleaning
c. Concealed surfaces that contain cracks in excess of 0.01 inch wide, cracks that penetrate to the reinforcement regardless of width, honeycomb, rock pockets, and spalls except minor breakage at corners and edges
3.5.3 Strength of Precast Units
Strength of precast concrete units will be considered potentially deficient if the units fail to comply with the requirements that control the strength of the units, including the following conditions:
a. Failure to meet compressive strength tests
b. Reinforcement not conforming to the requirements specified
c. Concrete curing and protection of precast units against extremes of temperature during curing not conforming to the requirements specified
d. Precast units damaged during handling and erection
3.6 SAMPLING AND TESTING
3.6.1 Rejection
Precast units in place may be rejected for any one of the following product defects or installation deficiencies remaining after repairs and cleaning have been accomplished. "Visible" means visible to a person with normal eyesight when viewed from a distance of 20 feet in broad daylight.
a. Nonconformance to specified tolerances.
b. Air voids (bugholes or blowholes) larger than 3/8 inch diameter.
c. Visible casting lines.
d. Visible from joints.
e. Visible irregularities.
f. Visible stains on precast unit surfaces.
g. Visible differences between precast unit and approved sample.
h. Visible non-uniformity of textures or color.
i. Visible areas of backup concrete bleeding through the facing concrete.
j. Visible foreign material embedded in the face.
k. Visible repairs.
l. Visible reinforcement shadow lines.
m. Visible cracks.
n. Precast units that are damaged during construction operations.
SECTION 03 45 00 Page 8
3.7 CLEANING
Clean exposed-to-view surfaces of precast units thoroughly with detergent and water; use a brush to remove foreign matter. Remove stains that remain after washing in accordance with recommendations of the precast manufacturer. Surfaces must be clean and uniform in color. Include precast concrete wall panel manufacturer's written recommendations for installation and cleaning.
-- End of Section --